Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Widening To 4 Lane With Paved Shoulder Configuration Of Vodarevu Chilakaluripet Section Design Chainage 0.00 To 47.000 Of Nh 167 A Package I On Epc Mode In The State Of Andhra Pradesh Under Annual Plan 2022 23
|
| Description |
Widening To 4 Lane With Paved Shoulder Configuration Of Vodarevu Chilakaluripet Section Design Chainage 0.00 To 47.000 Of Nh 167 A Package I On Epc Mode In The State Of Andhra Pradesh Under Annual Plan 2022 23
|
| Organisation | Central Public Procurement Portal 1 |
| Tender Id | 2023_MoRTH_759123_1 |
|
Reference Number |
RW/NH12014/16/22-23-AP/ZoneIII |
| Tender Fee | 1.06 Lakh |
| EMD | 8.26 Crore |
| Tender Value | - |
| Place | New Delhi |
| Link |
View Original Tender Notice
https://eprocure.gov.in |
| Start Date | June 23, 2023 23:20 |
| End Date |
Expired
21/08/2023
Expired 1148 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of the lonar bypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Construction of the lonarbypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Read moreRehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km
Rehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreConsultancy services for preparation of dpr for widening to four lane with paved shoulder from two lane with paved shoulder from km.0.00 to km.118.470 kalaburagi wadi yadgiri kadechur section of nh 150 in the state of karnataka
Consultancy services for preparation of dpr for widening to four lane with paved shoulder from two lane with paved shoulder from km.0.00 to km.118.470 kalaburagi wadi yadgiri kadechur section of nh 150 in the state of karnataka
Read moreUp gradation to two/four lane with paved shoulder configuration of tuljapur naldurge akkalkot road from naldurge to akkalkot of bvalance work from ch 30.884 and ch. 70.800 of nh 652 on epc mode in the state of maharashtra
Up gradation to two/four lane with paved shoulder configuration of tuljapur naldurge akkalkot road from naldurge to akkalkot of bvalance work from ch 30.884 and ch. 70.800 of nh 652 on epc mode in the state of maharashtra
Read moreWidening to 2 lane with paved shoulder from existing chainage 12.00 to 40.50 (badwala to lakhwar bend) (realignment from km 12.00 to 31.122) on nh-507
Widening to 2 lane with paved shoulder from existing chainage 12.00 to 40.50 (badwala to lakhwar bend) (realignment from km 12.00 to 31.122) on nh-507
Read moreConsultancy services for authority engineer during operation and maintenance period for 2 lane paved shoulder (km. 0.00 to 63.655) of majhauli - charout section of nh 527c in the state of bihar on epc basis. (total length in km 63.655)
Consultancy services for authority engineer during operation and maintenance period for 2 lane paved shoulder (km. 0.00 to 63.655) of majhauli - charout section of nh 527c in the state of bihar on epc basis. (total length in km 63.655)
Read moreConsultancy services for authority engineer during operation and maintenance period for 4 lane paved shoulder (km. 0.00 to km. 9.260) of forbesganj to jogbani section of nh-57a in the state of bihar on epc basis. (total length in km 9.260)
Consultancy services for authority engineer during operation and maintenance period for 4 lane paved shoulder (km. 0.00 to km. 9.260) of forbesganj to jogbani section of nh-57a in the state of bihar on epc basis. (total length in km 9.260)
Read moreConstruction/improvement of existing cl-9 road to nhdl specification with paved shoulder from design chainage km 0.00 (zadong) to km 6.880 (net length 6.880 km) on road zadong-donkyala-kerang (nh 310 a) in the state of sikkim under project swastik
Construction / improvement of existing cl-9 road to nhdl specification with paved shoulder from design chainage km 0.00 (zadong) to km 6.880 (net length 6.880 km) on road zadong-donkyala-kerang (nh 310 a) in the state of sikkim under project swastik
Read moreConstruction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode
Construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode.
Read moreof your Industry type