Tender Details

Particulars Details
Title
Widening To 4 Lane With Paved Shoulder Configuration Of Vodarevu Chilakaluripet Section Design Chainage 0.00 To 47.000 Of Nh 167 A Package I On Epc Mode In The State Of Andhra Pradesh Under Annual Plan 2022 23
Description
Widening To 4 Lane With Paved Shoulder Configuration Of Vodarevu Chilakaluripet Section Design Chainage 0.00 To 47.000 Of Nh 167 A Package I On Epc Mode In The State Of Andhra Pradesh Under Annual Plan 2022 23
Organisation Central Public Procurement Portal 1
Tender Id 2023_MoRTH_759123_1
Reference
Number
RW/NH12014/16/22-23-AP/ZoneIII
Tender Fee 1.06 Lakh
EMD 8.26 Crore
Tender Value -
Place New Delhi
Link
View Original Tender Notice

https://eprocure.gov.in

Start Date June 23, 2023 23:20
End Date
Expired 21/08/2023

Expired 1148 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of the lonar bypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode

Construction of the lonarbypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode

Read more
Rehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km

Rehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km

Read more
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Read more
Consultancy services for preparation of dpr for widening to four lane with paved shoulder from two lane with paved shoulder from km.0.00 to km.118.470 kalaburagi wadi yadgiri kadechur section of nh 150 in the state of karnataka

Consultancy services for preparation of dpr for widening to four lane with paved shoulder from two lane with paved shoulder from km.0.00 to km.118.470 kalaburagi wadi yadgiri kadechur section of nh 150 in the state of karnataka

Read more
Up gradation to two/four lane with paved shoulder configuration of tuljapur naldurge akkalkot road from naldurge to akkalkot of bvalance work from ch 30.884 and ch. 70.800 of nh 652 on epc mode in the state of maharashtra

Up gradation to two/four lane with paved shoulder configuration of tuljapur naldurge akkalkot road from naldurge to akkalkot of bvalance work from ch 30.884 and ch. 70.800 of nh 652 on epc mode in the state of maharashtra

Read more
Widening to 2 lane with paved shoulder from existing chainage 12.00 to 40.50 (badwala to lakhwar bend) (realignment from km 12.00 to 31.122) on nh-507

Widening to 2 lane with paved shoulder from existing chainage 12.00 to 40.50 (badwala to lakhwar bend) (realignment from km 12.00 to 31.122) on nh-507

Read more
Consultancy services for authority engineer during operation and maintenance period for 2 lane paved shoulder (km. 0.00 to 63.655) of majhauli - charout section of nh 527c in the state of bihar on epc basis. (total length in km 63.655)

Consultancy services for authority engineer during operation and maintenance period for 2 lane paved shoulder (km. 0.00 to 63.655) of majhauli - charout section of nh 527c in the state of bihar on epc basis. (total length in km 63.655)

Read more
Consultancy services for authority engineer during operation and maintenance period for 4 lane paved shoulder (km. 0.00 to km. 9.260) of forbesganj to jogbani section of nh-57a in the state of bihar on epc basis. (total length in km 9.260)

Consultancy services for authority engineer during operation and maintenance period for 4 lane paved shoulder (km. 0.00 to km. 9.260) of forbesganj to jogbani section of nh-57a in the state of bihar on epc basis. (total length in km 9.260)

Read more
Construction/improvement of existing cl-9 road to nhdl specification with paved shoulder from design chainage km 0.00 (zadong) to km 6.880 (net length 6.880 km) on road zadong-donkyala-kerang (nh 310 a) in the state of sikkim under project swastik

Construction / improvement of existing cl-9 road to nhdl specification with paved shoulder from design chainage km 0.00 (zadong) to km 6.880 (net length 6.880 km) on road zadong-donkyala-kerang (nh 310 a) in the state of sikkim under project swastik

Read more
Construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode

Construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise