Tender Details
Particulars | Details |
---|---|
Title |
Mtps I Mill Plant Unit Ii Coal Flow System To Boiler Rotating The Existing Eroded Straight Coal Pipes To Boiler Corner 1 To 4 To 180 Deg At 16 Meter Level Near Boiler Area During Capital Overhaul 2024 25
|
Description |
Mtps I Mill Plant Unit Ii Coal Flow System To Boiler Rotating The Existing Eroded Straight Coal Pipes To Boiler Corner 1 To 4 To 180 Deg At 16 Meter Level Near Boiler Area During Capital Overhaul 2024 25
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_500500_1 |
Reference Number |
CE / MTPS-I / SE / M-I / MP /OT.252/ 2024-25 |
Tender Fee | 0 |
EMD | 4800 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=595075 |
Start Date | November 12, 2024 21:30 |
End Date |
26/11/2024 ( Expired 195 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Mtps i mill plant unit i applying two layers ceramic wear coat eromat at mill outlet elbow released from unit i during annual overhaul 2025 26
Mtps i mill plant unit i applying two layers ceramic wear coat eromat at mill outlet elbow released from unit i during annual overhaul 2025 26
Read moreMtps i mill plant unit i overhaul of hot air dampers cold air dampers cold air gates hot air gate power cylinder renewal of hot air gate seal during annual over hauling of 2025 26
Mtps i mill plant unit i overhaul of hot air dampers cold air dampers cold air gates hot air gate power cylinder renewal of hot air gate seal during annual over hauling of 2025 26
Read moreMtps i mill plant unit i fabrication of ms bend 10 deg 15 deg 22 deg to suit 508 mm 12 70 mm thick coal pipe line during aoh 2025 26
Mtps i mill plant unit i fabrication of ms bend 10 deg 15 deg 22 deg to suit 508 mm 12 70 mm thick coal pipe line during aoh 2025 26
Read moreMtps i mill plant unit i dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and then assembling the reconditioned bends in an appropriate manner in the coal flow system
Mtps i mill plant unit i dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and then assembling the reconditioned bends in an appropriate manner in the coal flow system
Read moreMtps i mill plant unit i dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in mill 1a to 1f during annual overhaul 2025 26
Mtps i mill plant unit i dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in mill 1a to 1f during annual overhaul 2025 26
Read moreMtps i mill plant unit i dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2025 26
Mtps i mill plant unit i dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2025 26
Read moreMtps i mill plant unit i removal of accumulated ash from the horizontal portions of the mill inlet hot air duct at 4 5 mtr 18 mtr level welding of eroded and worn out portion of hot air duct joints and providing guard plates for the expansion
Mtps i mill plant unit i removal of accumulated ash from the horizontal portions of the mill inlet hot air duct at 4 5 mtr 18 mtr level welding of eroded and worn out portion of hot air duct joints and providing guard plates for the expansion
Read moreModification of existing single sealing _12 sectors _ rotary air pre heater to double sealing arrangement _ 24 sectors _ in unit iv aph a and b during forthcoming capital overhaul model 27vit _m_ 72 deg 2000mm
Modification of existing single sealing _12 sectors _ rotary air pre heater to double sealing arrangement _ 24 sectors _ in unit iv aph a and b during forthcoming capital overhaul model 27vit _m_ 72 deg 2000mm
Read moreTtps operation circle mpm ii unit v replacement of pulverized coal pipes, bends and fittings between mill and upto 32 mtr level of boiler area during the forthcoming overhaul
Ttps operation circle mpm ii unit v replacement of pulverized coal pipes, bends and fittings between mill and upto 32 mtr level of boiler area during the forthcoming overhaul
Read moreTtps operation circle mpm ii unit iv replacement of pulverized coal pipes, bends and fittings between mill and upto 32 mtr level of boiler area during the forthcoming overhaul
Ttps operation circle mpm ii unit iv replacement of pulverized coal pipes, bends and fittings between mill and upto 32 mtr level of boiler area during the forthcoming overhaul
Read moreof your Industry type