Particulars | Details |
---|---|
Title |
Mtps I Mill Plant Unit I Dismantling And Assembling Of Coal Pipe Bends And Patch Welding The Eroded Portions Of Coal Bends Pipelines Between Mill Outlet Elbow And Fuel Inlet Elbow During Annual Overhaul 2025 26
|
Description |
Mtps I Mill Plant Unit I Dismantling And Assembling Of Coal Pipe Bends And Patch Welding The Eroded Portions Of Coal Bends Pipelines Between Mill Outlet Elbow And Fuel Inlet Elbow During Annual Overhaul 2025 26
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 5600 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link |
AAAAAAAAAA Login to view |
Start Date | June 30, 2025 22:30 |
End Date |
14/07/2025 ( 13 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Mtps i mill plant unit i dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2025 26
Mtps i mill plant unit i dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2025 26
Read moreMtps i mill plant unit i dismantling of existing elliptical feeder discharge chutes mill 1b 1c 1f reconditioning of released ss elliptical feeder discharge chutes and reassembling the same during aoh 2025 26
Mtps i mill plant unit i dismantling of existing elliptical feeder discharge chutes mill 1b 1c 1f reconditioning of released ss elliptical feeder discharge chutes and reassembling the same during aoh 2025 26
Read moreMtps i bm unit i removal of deteriorated and dislodged insulation and re insulation with new insulation materials on the top and bottom portion of fg duct from mill bay outlet to esp inlet and other related works
Mtps i bm unit i removal of deteriorated and dislodged insulation and re insulation with new insulation materials on the top and bottom portion of fg duct from mill bay outlet to esp inlet and other related works
Read moreMtps i mill plant ac plant unit iii aoh 2025 26 air washer system epoxy painting of blowers and its auxiliaries enamel painting of awcw pumps pipe lines spray nozzles flushing works overhauling the blower 3a 3b damper box awcw pumps and gate valves
Mtps i mill plant ac plant unit iii aoh 2025 26 air washer system epoxy painting of blowers and its auxiliaries enamel painting of awcw pumps pipe lines spray nozzles flushing works overhauling the blower 3a 3b damper box awcw pumps and gate valves
Read moreMtps i mill plant unit iv clearing the mill rejects from unit-iii iv mill feeder area weighing in departmental weighbridge and transporting to rejects yard g switch yard area coal yard by using contractors vehicle and unloading the same and
Mtps i mill plant unit iv clearing the mill rejects from unit-iii iv mill feeder area weighing in departmental weighbridge and transporting to rejects yard g switch yard area coal yard by using contractors vehicle and unloading the same and
Read moreNctps i se mi circle mill plant maintenance division annual overhaul work for the year 25 26 specification no 54 25 26
Nctps i se mi circle aoh 25 26 mpm dn unit ii cleaning and painting of one coat of red oxide and two coats of h r aluminium paint over the mill coal pipe during annual overhaul for the year 2025 26
Read moreNctps i se m ii circle ahp dn unit i aoh 2025 26 bah overhauling of bottom ash hopper scrapper feeders and clinker grinders during overhaul of unit
Nctps i se m ii circle ahp dn unit i aoh 2025 26 bah overhauling of bottom ash hopper scrapper feeders and clinker grinders during overhaul of unit
Read moreTtps operation circle mpm i unit iii overhauling of worn out fuel inlet elbows special bends coal pipes and orifices in boiler corner 3 and 4 during the forthcoming overhaul
Ttps operation circle mpm i unit iii overhauling of worn out fuel inlet elbows special bends coal pipes and orifices in boiler corner 3 and 4 during the forthcoming overhaul
Read moreTtps operation circle mpm i unit iii overhauling of worn out fuel inlet elbows special bends coal pipes and orifices in boiler corner 1 and 2 during the forthcoming overhaul
Ttps operation circle mpm i unit iii overhauling of worn out fuel inlet elbows special bends coal pipes and orifices in boiler corner 1 and 2 during the forthcoming overhaul
Read moreTtps operation circle mpm i unit iii replacement of eroded coal pipe lines, bends and fittings between mills a, b and c and boiler during the forthcoming overhaul
Ttps operation circle mpm i unit iii replacement of eroded coal pipe lines, bends and fittings between mills a, b and c and boiler during the forthcoming overhaul