Tender Details
Particulars | Details |
---|---|
Title |
Mtps I Mill Plant Unit Iv Dismantling And Assembling Of Coal Pipe Bends And Patch Welding The Eroded Portions Of Coal Bends Pipelines Between Mill Outlet Elbow And Fuel Inlet Elbow During Annual Overhaul 2024 25
|
Description |
Mtps I Mill Plant Unit Iv Dismantling And Assembling Of Coal Pipe Bends And Patch Welding The Eroded Portions Of Coal Bends Pipelines Between Mill Outlet Elbow And Fuel Inlet Elbow During Annual Overhaul 2024 25
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_462377_1 |
Reference Number |
CE / MTPS-I / SE / M-I / MP /OT.87 / 2024-25 |
Tender Fee | 0 |
EMD | 5900 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=549523 |
Start Date | July 12, 2024 18:30 |
End Date |
18/07/2024 ( Expired 277 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Mtps i m ii oahs fam pdfacs unit iv attending annual overhauling works in plc switch gear panels modules breakers transformers pdfacs equipments and related accessories overhauling of mixing apparatus by dismantling cleaning painting and reassem
Mtps i m ii oahs fam pdfacs unit iv attending annual overhauling works in plc switch gear panels modules breakers transformers pdfacs equipments and related accessories overhauling of mixing apparatus by dismantling cleaning painting and reassem
Read moreMtps i tm i removal and re insulation of hp ip control valves gland steam pipes esviv and hptipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2025 26 as and when required
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esviv and hptipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2025 26 as and when required
Read moreMtps i m i circle ca fp replacement of worn out puncture headers pipelines in hydrant emulsifyre system by dismantling and erection of various sizes pipelines patch welding replacement of fire hydrant post removing of slabs and allied works
Mtps i m i circle ca fp replacement of worn out puncture headers pipelines in hydrant emulsifyre system by dismantling and erection of various sizes pipelines patch welding replacement of fire hydrant post removing of slabs and allied works
Read moreMtps i mill plant unit ii complete dismantling of mill internals reconditioning renewal of worn out parts renewal of worn out vertical shaft and renewal of worm gear hub mill bottom etc in mill 2a of unit ii
Mtps i mill plant unit ii complete dismantling of mill internals reconditioning renewal of worn out parts renewal of worn out vertical shaft and renewal of worm gear hub mill bottom etc in mill 2a of unit ii
Read moreMtps i mill plant reconditioning of worm shaft thrust bearing housing released from unit iv coal mill
Mtps i mill plant reconditioning of worm shaft thrust bearing housing released from unit iv coal mill
Read moreProvision reversal of filtrate, liquor tanks, stand pipe manhole, vat, pipeline dummies during shutdown and plant stoppage in hwfl at pulp mill mechanical in tnpl unit i
Provision reversal of filtrate, liquor tanks, stand pipe manhole, vat, pipeline dummies during shutdown and plant stoppage in hwfl at pulp mill mechanical in tnpl unit i
Read moreMtps i mill plant unit i clearing the mill rejects from unit i and ii mill feeder area weighing in departmental weighbridge and transporting to reject yard g switch yard area coal yard by using contractors vehicle and unloading the same and
Mtps i mill plant unit i clearing the mill rejects from unit i and ii mill feeder area weighing in departmental weighbridge and transporting to reject yard g switch yard area coal yard by using contractors vehicle and unloading the same and
Read moreMtps i mill plant unit i complete dismantling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub mill bottom in mill 1d
Mtps i mill plant unit i complete dismantling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub mill bottom in mill 1d
Read moreMtps i mill plant unit i removal of worn out thinned out wall plates of coal bunkers 1a 1b 1c and erection of new wall plates of 12 mm thick ms plates and supporting beams and other related works
Mtps i mill plant unit i removal of worn out thinned out wall plates of coal bunkers 1a 1b 1c and erection of new wall plates of 12 mm thick ms plates and supporting beams and other related works
Read moreNctps i se mi circle mill plant maintenance division annual overhaul works for the year 24 25 specification no 237 24 25
Nctps i se mi circle aoh 24 25 mpm dn unit iii mills 3a 3c 3f dismantling and lowering of mdvs mpos mill outlet elbows and classifier blades patch welding in worn out portion and dismantling of center coal feed pipe
Read moreof your Industry type