Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Reconstruction And Improvement Of Kathwana Khanshuli Khanethakhal Motor Road Km.1.00 To 3.00 In Lansdowne Constituency Under State Sector
|
| Description |
Reconstruction And Improvement Of Kathwana Khanshuli Khanethakhal Motor Road Km.1.00 To 3.00 In Lansdowne Constituency Under State Sector
|
| Organisation | PWD | State Govt. and UT |
| Tender Id | 2025_pwd_79374_1 |
|
Reference Number |
4191/141YATA-12/2023-24 date 28-12-2024 |
| Tender Fee | 5900 |
| EMD | 4.95 Lakh |
| Tender Value | |
| Place | Lansdowne |
| Link |
View Original Tender Notice
https://uktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=94689 |
| Start Date | January 17, 2025 17:30 |
| End Date |
Expired
28/01/2025
Expired 521 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Strengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Strengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Read moreDismantling and reconstruction of flooring of backservice lanes in sector 18 b, c, d and sector -19 b chandigarh
Dismantling and reconstruction of flooring of backservice lanes in sector 18 b, c, d and sector -19 b chandigarh
Read moreInitial rehabilitation and 5th year maintenance work rudraprayag gaurikund motor road km 15 to chopda bhatgaon motor road
Initial rehabilitation and 5th year maintenance work rudraprayag gaurikund motor road km 15 to chopda bhatgaon motor road
Read moreConstruction of dini to nadgal motor road at block dhari in bhimtal assembly constituency of nainital district under the chief ministers rural road scheme (phase ii, stage 1)
Construction of dini to nadgal motor road at block dhari in bhimtal assembly constituency of nainital district under the chief ministers rural road scheme (phase ii, stage 1)
Read moreConstruction of road by interlocking tiles in vill. adarsh tehri, pathri part-2 and basti no. 3 and 4 main road to towards bishan singh panwar house in constituency haridwar gradistt. haridwar under state sector (job 2)
Construction of road by interlocking tiles in vill. adarsh tehri, pathri part-2 and basti no. 3 and 4 main road to towards bishan singh panwar house in constituency haridwar gradistt. haridwar under state sector (job 2)
Read moreTender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Read moreRepair/maint and improvement of lt distribution network, lt panel, fp box and other allied works in sector e and sector f otm and md accn in army area under ge (a) no.1 jodhpur
Repair/maint and improvement of lt distribution network, lt panel, fp box and other allied works in sector e and sector f otm and md accn in army area under ge (a) no.1 jodhpur
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreSpecial repair to pcc and bituminous road of ad regt at sector c makarpura under ge (a) baroda
Special repair to pcc and bituminous road of ad regt at sector c makarpura under ge (a) baroda
Read moreof your Industry type