Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Retaining Wall On Sakharpa Bhadkamba Bhovade Kirbet Devade Road Mdr 52 Road Left Side Between Km. 1/700 To 2/500 Tal. Sangmeshwar And Dist. Ratnagiri.
|
Description |
Construction Of Retaining Wall On Sakharpa Bhadkamba Bhovade Kirbet Devade Road Mdr 52 Road Left Side Between Km. 1/700 To 2/500 Tal. Sangmeshwar And Dist. Ratnagiri.
|
Organisation | Government of Maharashtra |
Tender Id | 2023_PWR_959832_11 |
Reference Number |
NIT-56 for 2023-24 |
Tender Fee | 590 |
EMD | 50000 |
Tender Value | |
Place | EE North PWD Ratnagiri |
Link | https://mahatenders.gov.in |
Start Date | November 03, 2023 15:30 |
End Date |
10/11/2023 ( Expired 556 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Zone no. 03, ward no. 12, (1) construction of rcc drain from pappu kushwaha ji house to naigadhi house at bajarang nagar and (2) construction of rcc drain and pcc road from beside of singhal nurshing home to late ramadhar patel ji house at bara.
Zone no. 03, ward no. 12, (1) construction of rcc drain from pappu kushwaha ji house to naigadhi house at bajarang nagar and (2) construction of rcc drain and pcc road from beside of singhal nurshing home to late ramadhar patel ji house at bara.
Read moreConstruction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call
Construction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call
Read moreR and r of bituminous concrete 30 mm on road from approach road to check post no. 2 , from check post no. 1 to circle office and other patch work at shanan power house , joginder nagar distt mandi (hp)
R and r of bituminous concrete 30 mm on road from approach road to check post no. 2 , from check post no. 1 to circle office and other patch work at shanan power house , joginder nagar distt mandi (hp)
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreConstruction of 2-lane rob at lc no.ab-27 (belbahara rob) on manendragarh to ambikapur section of nh-43 (old nh-78) at nh km 264.000 and railway chainage 937.14-15 between udalkachar-boridand stations in the state of chhattisgarh
Construction of 2-lane rob at lc no.ab-27 (belbahara rob) on manendragarh to ambikapur section of nh-43 (old nh-78) at nh km 264.000 and railway chainage 937.14-15 between udalkachar-boridand stations in the state of chhattisgarh
Read moreConstruction of 2-lane rob at nh lc no. ab-72 on surajpur to ambikapur road in km 357.370 of nh-78 (new nh-43) at railway chainage 1925.11-12 on bishrampur to ambikapur railway line near jainagar in chhattisgarh
Construction of 2-lane rob at nh lc no. ab-72 on surajpur to ambikapur road in km 357.370 of nh-78 (new nh-43) at railway chainage 1925.11-12 on bishrampur to ambikapur railway line near jainagar in chhattisgarh
Read moreConstruction of h.l bridge 66.36 m long over patiala ki rao nadi crossing khudda lahora karoran road to stp, naya gaon including its approaches and retaining wall in distt. s.a.s. nagar.
Construction of h.l bridge 66.36 m long over patiala ki rao nadi crossing khudda lahora karoran road to stp, naya gaon including its approaches and retaining wall in distt. s.a.s. nagar.
Read moreSupply and stacking of various materials for special restoration of monsoon damages (2024-25) at various locations between km 31.450 to km 33.906 and km 91.300 to km 130.008 on sairang-tuipuibari road for permanent work and between km 124.086 to km 1
Supply and stacking of various materials for special restoration of monsoon damages (2024-25) at various locations between km 31.450 to km 33.906 and km 91.300 to km 130.008 on sairang-tuipuibari road for permanent work and between km 124.086 to km 1
Read more- (1) consultancy service for preliminary and detailed engineering including preparation of detailed project report for replacement of cable stayed suspension foot bridge by construction of rcc bridge over dhalai river on manikbhander to darang road
- (1) consultancy service for preliminary and detailed engineering including preparation of detailed project report for replacement of cable stayed suspension foot bridge by construction of rcc bridge over dhalai river on manikbhander to darang road
Read moreSurfacing works of gsb 15 cm thick wbm 75 mm thick dbm 50 mm thick and bc 40 mm thick with tack coat and prime coat as per morth specification between km 0.000 to km 14.350 on puwarti gomaguda road
Surfacing works of gsb 15 cm thick wbm 75 mm thick dbm 50 mm thick and bc 40 mm thick with tack coat and prime coat as per morth specification between km 0.000 to km 14.350 on puwarti gomaguda road
Read moreof your Industry type