Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Shifting Of 33 Kv Line (At Village Kuwarpur) Affected By Submergence Of Majhgaye Medium Irrigation Dam Complete Work With Material And Labour At Work Site As Per G Schedule And Direction Of Engineer In Charge As Per Proposed Drawing.
|
Description |
Shifting Of 33 Kv Line (At Village Kuwarpur) Affected By Submergence Of Majhgaye Medium Irrigation Dam Complete Work With Material And Labour At Work Site As Per G Schedule And Direction Of Engineer In Charge As Per Proposed Drawing.
|
Organisation | Government of Madhya Pradesh |
Tender Id | 2023_WRD_304440_1 |
Reference Number |
1022/2023-24/Einc/Etendering/ dt.05-09-2023 |
Tender Fee | 10000 |
EMD | 67000 |
Tender Value | |
Place | Bhopal |
Link | https://mptenders.gov.in |
Start Date | September 11, 2023 16:00 |
End Date |
24/11/2023 ( Expired 574 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Roadside fencing with fixing work, rcc post, barbed wire, weldmess wire etc. for plantation work along with nh 11 (bikaner phalodi block) (with labour and material) as per g schedule
Roadside fencing with fixing work, rcc post, barbed wire, weldmess wire etc. for plantation work along with nh 11 (bikaner phalodi block) (with labour and material) as per g schedule
Read moreWork of shifting of ht line on chainage no. 74 480 and 72 500 of ganga express way under construction on wsa area from 11 kv feeders site village mangarola and 11 kv rukhalu feeder of 33/11 kv substation burawali and jaitoli under edd hasanpur.
Work of shifting of ht line on chainage no. 74 480 and 72 500 of ganga express way under construction on wsa area from 11 kv feeders site village mangarola and 11 kv rukhalu feeder of 33/11 kv substation burawali and jaitoli under edd hasanpur.&#x0d &#x0d
Read moreModification work of 220 kv bhilwara-bamantukda line between location no. 199-200on labour contract as per g schedule
Modification work of 220 kv bhilwara-bamantukda line between location no. 199-200on labour contract as per g schedule
Read moreWork of 33 kv underground cabling (33 kv xlpe cable, 3x300 mm) (02 nos.) for railway crossing at nad-ujn sec. bet station pso-asl station track location no. 31/10-11 as per layout drawing under sanction project by onm dn barnagar
Work of 33 kv underground cabling (33 kv xlpe cable, 3x300 mm) (02 nos.) for railway crossing at nad-ujn sec. bet station pso-asl station track location no. 31/10-11 as per layout drawing under sanction project by onm dn barnagar
Read moreFirst class brick lining work 1 3 cm in mawai minor from chainage 0.725 to 1.075 at kundakala pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as direc
First class brick lining work 1 3 cm in mawai minor from chainage 0.725 to 1.075 at kundakala pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as direc
Read moreRevetment work of 132 kv mandideep-nahar line at loc. no. 03(nd60) type tower of tlm sub dn. bhopal under ee eht (maint.) dn. bhopal through a labour contract basis as per tender specifications.
Revetment work of 132 kv mandideep-nahar line at loc. no. 03(nd60) type tower of tlm sub dn. bhopal under ee eht (maint.) dn. bhopal through a labour contract basis as per tender specifications.
Read moreBank protection work of river bank right side of barge from 0.00 to 22.50 m at balua pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed by e
Bank protection work of river bank right side of barge from 0.00 to 22.50 m at balua pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed by e
Read moreKtps-v-cam-transportation of material, t and p, ms erw pipes, various scrap material, ash, coal, silt and debris etc by engaging tractor (including carrier) from section store to ash pond / internal transportation from one spot to another spot at ash pond and inside plant premises as and when required as per the directions of in charge engineer at site, during the period from 01-04-2025 (or from actual date of utilization) to 31 -03 - 2026-reg.
Ktps-v-cam-transportation of material, t and p, ms erw pipes, various scrap material, ash, coal, silt and debris etc by engaging tractor (including carrier) from section store to ash pond / internal transportation from one spot to another spot at ash pond and inside plant premises as and when required as per the directions of in charge engineer at site, during the period from 01-04-2025 (or from actual date of utilization) to 31 -03 - 2026-reg.
Read moreStrenthaning of uruwa minor by renovation of old brick lining 1 4 c.m. in between 0.000 km to 0.850 km at reruwa pump canal including all cost of material, (excluding cement and brick ) labour, t and p used, complete in all respect as per drawing p
Strenthaning of uruwa minor by renovation of old brick lining 1 4 c.m. in between 0.000 km to 0.850 km at reruwa pump canal including all cost of material, (excluding cement and brick ) labour, t and p used, complete in all respect as per drawing p
Read moreKtps-v-cam-transportation of material, tp, ms erw pipes, various scrap material, ash, coal, silt debris etc by engaging tractor (including carrier) from section store to ash pond / internal transportation from one spot to another spot at ash pond inside plant premises as and when required as per the directions of in charge engineer at site, during the period from 01-04-2025 to 31 -03 - 2026-reg
Ktps-v-cam-transportation of material, t and p, ms erw pipes, various scrap material, ash, coal, silt and debris etc by engaging tractor (including carrier) from section store to ash pond / internal transportation from one spot to another spot at ash pond and inside plant premises as and when required as per the directions of in charge engineer at site, during the period from 01-04-2025 to 31 -03 - 2026-reg.
Read moreof your Industry type