Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Control Room Building, Equipment Foundation, Switchyard Development, Retaining Wall, Boundary Wall, Fencing Wall, Approach Road And Sinking Of 1 No Tube Well (100mm X50mm) Dia Including Submersible Pump Motor 1.5 Hp At Chandipur 33/11
|
Description |
Construction Of Control Room Building, Equipment Foundation, Switchyard Development, Retaining Wall, Boundary Wall, Fencing Wall, Approach Road And Sinking Of 1 No Tube Well (100mm X50mm) Dia Including Submersible Pump Motor 1.5 Hp At Chandipur 33/11
|
Organisation | WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD | State Govt. and UT |
Tender Id | 2025_WBSED_844074_1 |
Reference Number |
RM/MRO/CIVIL/e-TENDER/25-26/05 Dt.08.05.2025 |
Tender Fee | 0 |
EMD | 3.56 Lakh |
Tender Value | |
Place | Chandipur substation Malda |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1882976 |
Start Date | May 19, 2025 16:30 |
End Date |
09/06/2025 ( Expired 2 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of control and power cable trench and re-spreading of gravel within switchyard along with renovation of control room building and boundary wall of bamanhat 33/11kv substation under dinhata division wbsedcl
Construction of control and power cable trench and re-spreading of gravel within switchyard along with renovation of control room building and boundary wall of bamanhat 33/11kv substation under dinhata division wbsedcl
Read moreConstruction of control room building, providing foundation plinth for structures,equipments cable duct, retaining wall arrangements,rcc road and other related civil works for the establishment of 110/33 kv ss at naripallam under dcw in erode edc.
Construction of control room building, providing foundation plinth for structures,equipments cable duct, retaining wall arrangements,rcc road and other related civil works for the establishment of 110/33 kv ss at naripallam under dcw in erode edc.
Read moreConstruction of control room building, equipment foundation, switchyard development, retaining wall, boundary wall, fencing wall, approach road and sinking of 1 no tube well (100mmx50mm) dia including submersible pump motor 1.5 hp at chandipur 33/11
Construction of control room building, equipment foundation, switchyard development, retaining wall, boundary wall, fencing wall, approach road and sinking of 1 no tube well (100mmx50mm) dia including submersible pump motor 1.5 hp at chandipur 33/11
Read moreReplacement of under ground water supply pipe line and 1 no. sinking of (200 x 100) mm dia deep tubewell and installation of 7.5 hp submersible pump motor set system of pump room no.1 at belghoria phe. (2nd call)
Replacement of under ground water supply pipe line and 1 no. sinking of (200 x 100) mm dia deep tubewell and installation of 7.5 hp submersible pump motor set system of pump room no.1 at belghoria phe. (2nd call)
Read moreConstruction of control room building, equipment foundation, switchyard development, retaining wall, boundary wall, culvert, fencing wall, approach road and sinking of 1 no tube well (100mmx50mm) dia including submersible pump motor 1.5 hp at propose
Construction of control room building, equipment foundation, switchyard development, retaining wall, boundary wall, culvert, fencing wall, approach road and sinking of 1 no tube well (100mmx50mm) dia including submersible pump motor 1.5 hp at propose
Read moreEstimate for approach road rcc with ratio-1 2 4 from main gate to power transformer foundation size20x3mtr digging of 150 mm dia tube well including casing running mtr providing and fixing 5hp submersible pump with 2 year warranty at malhargarh
Estimate for approach road rcc with ratio-1 2 4 from main gate to power transformer foundation size20x3 mtr digging of 150 mm dia tube well including casing running mtr providing and fixing 5hp submersible pump with 2 year warranty at malhargarh
Read moreConstruction of control room building, bw wall along with equipment foundation, switchyard development, internal road and other allied works for 33by11 kv ais substation at proposed shilpobroto industrial park, radhabari, under jalpaiguri division
Construction of control room building, bw wall along with equipment foundation, switchyard development, internal road and other allied works for 33by11 kv ais substation at proposed shilpobroto industrial park, radhabari, under jalpaiguri division
Read moreReplacement of under ground water supply pipe line and1 no. sinking of (200 x 100) mm dia deep tubewell and installation of 7.5 hp submersible pump motor set system of pump room no.1 at belghoria phe. (1st call)
Replacement of under ground water supply pipe line and1 no. sinking of (200 x 100) mm dia deep tubewell and installation of 7.5 hp submersible pump motor set system of pump room no.1 at belghoria phe. (1st call)
Read moreConstruction of store room , miscellanious civil works of boundary wall and control room building and construction of approach road and related civil works at 33/11 kv kei roorkee
Construction of store room , miscellanious civil works of boundary wall and control room building and construction of approach road and related civil works at 33/11 kv kei roorkee
Read moreConstruction of 33/11 kv indoor (ais) type sub station incl. control room building, retaining wall cum boundary wall, approach road, switchyard development, cable trench, sanitary plumbing at jalalpur under malda division, dist malda, wbsedcl
Construction of 33/11 kv indoor (ais) type sub station incl. control room building, retaining wall cum boundary wall, approach road, switchyard development, cable trench, sanitary plumbing at jalalpur under malda division, dist malda, wbsedcl
Read moreof your Industry type