Tender Details

Particulars Details
Title
Construction Of Control Room Building, Equipment Foundation, Switchyard Development, Retaining Wall, Boundary Wall, Culvert, Fencing Wall, Approach Road And Sinking Of 1 No Tube Well (100mm X50mm) Dia Including Submersible Pump Motor 1.5 Hp At Propose
Description
Construction Of Control Room Building, Equipment Foundation, Switchyard Development, Retaining Wall, Boundary Wall, Culvert, Fencing Wall, Approach Road And Sinking Of 1 No Tube Well (100mm X50mm) Dia Including Submersible Pump Motor 1.5 Hp At Propose
Organisation WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD | State Govt. and UT
Tender Id 2025_WBSED_801671_1
Reference
Number
RM/MRO/CIVIL/e-TENDER/ 2024-25/03
Tender Fee 0
EMD 3.53 Lakh
Tender Value
Place Gobarjona, Malda
Link https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1780068
Start Date January 20, 2025 16:30
End Date

10/02/2025 ( Expired 71 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Estimate for approach road rcc with ratio-1 2 4 from main gate to power transformer foundation size20x3mtr digging of 150 mm dia tube well including casing running mtr providing and fixing 5hp submersible pump with 2 year warranty at malhargarh

Estimate for approach road rcc with ratio-1 2 4 from main gate to power transformer foundation size20x3 mtr digging of 150 mm dia tube well including casing running mtr providing and fixing 5hp submersible pump with 2 year warranty at malhargarh

Read more
Construction of control room building, bw wall along with equipment foundation, switchyard development, internal road and other allied works for 33by11 kv ais substation at proposed shilpobroto industrial park, radhabari, under jalpaiguri division

Construction of control room building, bw wall along with equipment foundation, switchyard development, internal road and other allied works for 33by11 kv ais substation at proposed shilpobroto industrial park, radhabari, under jalpaiguri division

Read more
Replacement of under ground water supply pipe line and1 no. sinking of (200 x 100) mm dia deep tubewell and installation of 7.5 hp submersible pump motor set system of pump room no.1 at belghoria phe. (1st call)

Replacement of under ground water supply pipe line and1 no. sinking of (200 x 100) mm dia deep tubewell and installation of 7.5 hp submersible pump motor set system of pump room no.1 at belghoria phe. (1st call)

Read more
Construction of 33/11 kv indoor (ais) type sub station incl. control room building, retaining wall cum boundary wall, approach road, switchyard development, cable trench, sanitary plumbing at jalalpur under malda division, dist malda, wbsedcl

Construction of 33/11 kv indoor (ais) type sub station incl. control room building, retaining wall cum boundary wall, approach road, switchyard development, cable trench, sanitary plumbing at jalalpur under malda division, dist malda, wbsedcl

Read more
Balance and additional works for sinking of 300x200 mm dia x 210 mtr deapth rrm tube well and laying pipe line (lds),fhtc,construction of switch room,pump house,interconnection along with road restoration and construction of boundary wall for head wo

Balance and additional works for sinking of 300x200 mm dia x 210 mtr deapth rrm tube well and laying pipe line (lds),fhtc,construction of switch room,pump house,interconnection along with road restoration and construction of boundary wall for head

Read more
Sinking of 20 nos tube well of size 300x200 mm dia. and 146 mtr. deep by direct rotary rig method using upvc pipes. boundary wall 40 mtr each with one number gate for each tube well at zone -1,2 and 3 size -(10 x 10) sqm each. pump room as per de

Sinking of 20 nos tube well of size 300x200 mm dia. and 146 mtr. deep by direct rotary rig method using upvc pipes. boundary wall 40 mtr each with one number gate for each tube well at zone -1,2 and 3 size -(10 x 10) sqm each. pump room as per de

Read more
Construction of control room building, equipment foundation, switchyard development, retaining wall, boundary wall, culvert, fencing wall, approach road and sinking of 1 no tube well (100mmx50mm) dia including submersible pump motor 1.5 hp at propose

Construction of control room building, equipment foundation, switchyard development, retaining wall, boundary wall, culvert, fencing wall, approach road and sinking of 1 no tube well (100mmx50mm) dia including submersible pump motor 1.5 hp at propose

Read more
Sinking of rig- tube well (200mm dia) with 2 hp motor and pipe line near annex building in ward no-10 under nalhati municipality

Sinking of rig- tube well (200mm dia) with 2 hp motor and pipe line near annex building in ward no-10 under nalhati municipality

Read more
Construction of control room building with development work, parking, store shed, guard hut, boundary wall, fencing work, water supply system and water harvesting system at 132 kv g.s.s. mandiyayi khurd, distt. jodhpur.

Construction of control room building with development work, parking, store shed, guard hut, boundary wall, fencing work, water supply system and water harvesting system at 132 kv g.s.s. mandiyayi khurd, distt. jodhpur.

Read more
Sinking reinstallation of new riverbed tube well with 100mm dia g.i collector main including supply, fixing of control panel, cable, submersible pump motor at damra pump house to improve the quality quantum drinking water within amc

Sinking&amp#x0d reinstallation of new&amp#x0d riverbed tube well&amp#x0d with 100mm dia g.i&amp#x0d collector main&amp#x0d including supply,&amp#x0d fixing of control&amp#x0d panel, cable,&amp#x0d submersible pump&amp#x0d motor at damra&amp#x0d pump house to&amp#x0d improve the quality&amp#x0d quantum&amp#x0d drinking water&amp#x0d within amc

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise