Tender Details

Particulars Details
Title
Construction Of Guard Wall With Stone Masonry Retaining Wall At Outer Side Of The Building, Inside Painting Of The Building And Repairing A Few Parts Of Boundary Drain And Pavers Block At Family Court, Barpeta
Description
Construction Of Guard Wall With Stone Masonry Retaining Wall At Outer &Amp#X0d Side Of The Building, Inside Painting Of The Building And Repairing A Few &Amp#X0d Parts Of Boundary Drain And Pavers Block At Family Court, Barpeta
Organisation Public Works Building and NH Department | State Govt. and UT
Tender Id 2026_PWBNH_52136_1
Reference
Number
BDTBD/25-26/FC/GW/20/1831-A
Tender Fee 1000
EMD 47548
Tender Value -
Place Barpeta Town
Link
View Original Tender Notice

https://assamtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=82530

Start Date March 18, 2026 22:20
End Date
Expired 30/03/2026

Expired 202 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Spl repair to bldg no ow-05 and provn of stone masonry retaining wall in 39 mdsr under palampur mil stn

Spl repair to bldg no ow-05 and provn of stone masonry retaining wall in 39 mdsr under palampur mil stn

Read more
Construction of stone masonry water recharging/harvesting structures crate wire structures retaining walls crate wire silt retention structure at village haripur manguwal diwari bharatgarh chotti jhakhiana saho majra sarsa nangal under sub divrupna

Construction of stone masonry water recharging/harvesting structures crate wire structures retaining walls crate wire silt retention structure at village haripur manguwal diwari bharatgarh chotti jhakhiana saho majra sarsa nangal under sub divrupna

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Read more
Construction of size stone masonry retaining wall infront of csa building

Construction of size stone masonry retaining wall infront of csa building

Read more
Construction of cement stone masonry retaining wall in thapli block, pinjore range

Construction of cement stone masonry retaining wall in thapli block, pinjore range

Read more
Construction of stone masonry water recharging structures stone masonry retaining wall crate wire structures and construction of waiting hall of shamshanghat district rupnagar

Construction of stone masonry water recharging structures stone masonry retaining wall crate wire structures and construction of waiting hall of shamshanghat district rupnagar

Read more
Construction of stone masonry water recharging structures stone masonry retaining walls for renovation of pond and for channelize of drainage nalah and crate wire structures

Construction of stone masonry water recharging structures stone masonry retaining walls for renovation of pond and for channelize of drainage nalah and crate wire structures villages jhandian khurd jatwahar nurpur khurd,khad bathlour chabrewal

Read more
Construction of stone masonry water recharging cum silt detention structure, retaining wall and crate wire structure village bhaddi, stone masonry retaining wall in villages katwara and atal mazaratehsil balachaur , distt. s.b.s nagar

Construction of stone masonry water recharging cum silt detention structure, retaining wall and crate wire structure village bhaddi, stone masonry retaining wall in villages katwara and atal mazaratehsil balachaur , distt. s.b.s nagar

Read more
Repair of damaged stone masonry retaining wall of bsnl te compound at new tehri.

Repair of damaged stone masonry retaining wall of bsnl te compound at new tehri.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise