Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Guard Wall With Stone Masonry Retaining Wall At Outer Side Of The Building, Inside Painting Of The Building And Repairing A Few Parts Of Boundary Drain And Pavers Block At Family Court, Barpeta
|
| Description |
Construction Of Guard Wall With Stone Masonry Retaining Wall At Outer &Amp#X0d
Side Of The Building, Inside Painting Of The Building And Repairing A Few &Amp#X0d
Parts Of Boundary Drain And Pavers Block At Family Court, Barpeta
|
| Organisation | Public Works Building and NH Department | State Govt. and UT |
| Tender Id | 2026_PWBNH_52136_1 |
|
Reference Number |
BDTBD/25-26/FC/GW/20/1831-A |
| Tender Fee | 1000 |
| EMD | 47548 |
| Tender Value | - |
| Place | Barpeta Town |
| Link |
View Original Tender Notice
https://assamtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=82530 |
| Start Date | March 18, 2026 22:20 |
| End Date |
Expired
30/03/2026
Expired 202 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Spl repair to bldg no ow-05 and provn of stone masonry retaining wall in 39 mdsr under palampur mil stn
Spl repair to bldg no ow-05 and provn of stone masonry retaining wall in 39 mdsr under palampur mil stn
Read moreConstruction of stone masonry water recharging/harvesting structures crate wire structures retaining walls crate wire silt retention structure at village haripur manguwal diwari bharatgarh chotti jhakhiana saho majra sarsa nangal under sub divrupna
Construction of stone masonry water recharging/harvesting structures crate wire structures retaining walls crate wire silt retention structure at village haripur manguwal diwari bharatgarh chotti jhakhiana saho majra sarsa nangal under sub divrupna
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreConstruction of size stone masonry retaining wall infront of csa building
Construction of size stone masonry retaining wall infront of csa building
Read moreConstruction of cement stone masonry retaining wall in thapli block, pinjore range
Construction of cement stone masonry retaining wall in thapli block, pinjore range
Read moreConstruction of stone masonry water recharging structures stone masonry retaining wall crate wire structures and construction of waiting hall of shamshanghat district rupnagar
Construction of stone masonry water recharging structures stone masonry retaining wall crate wire structures and construction of waiting hall of shamshanghat district rupnagar
Read moreConstruction of stone masonry water recharging structures stone masonry retaining walls for renovation of pond and for channelize of drainage nalah and crate wire structures
Construction of stone masonry water recharging structures stone masonry retaining walls for renovation of pond and for channelize of drainage nalah and crate wire structures villages jhandian khurd jatwahar nurpur khurd,khad bathlour chabrewal
Read moreConstruction of stone masonry water recharging cum silt detention structure, retaining wall and crate wire structure village bhaddi, stone masonry retaining wall in villages katwara and atal mazaratehsil balachaur , distt. s.b.s nagar
Construction of stone masonry water recharging cum silt detention structure, retaining wall and crate wire structure village bhaddi, stone masonry retaining wall in villages katwara and atal mazaratehsil balachaur , distt. s.b.s nagar
Read moreRepair of damaged stone masonry retaining wall of bsnl te compound at new tehri.
Repair of damaged stone masonry retaining wall of bsnl te compound at new tehri.
Read moreof your Industry type