Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Stone Masonry Water Recharging Structures Stone Masonry Retaining Walls For Renovation Of Pond And For Channelize Of Drainage Nalah And Crate Wire Structures
|
| Description |
Construction Of Stone Masonry Water Recharging Structures Stone Masonry Retaining Walls For Renovation Of Pond And For Channelize Of Drainage Nalah And Crate Wire Structures Villages Jhandian Khurd Jatwahar Nurpur Khurd,Khad Bathlour Chabrewal
|
| Organisation | Department of Agriculture | State Govt. and UT |
| Tender Id | 2024_DOA_129340_1 |
|
Reference Number |
DSWC/DSCO/MOHALI-05/24-25 |
| Tender Fee | 6900 |
| EMD | 1.7 Lakh |
| Tender Value | - |
| Place | SAS NAGAR AND ROOPNAGAR |
| Link |
View Original Tender Notice
https://eproc.punjab.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=262118 |
| Start Date | October 30, 2024 19:25 |
| End Date |
Expired
19/11/2024
Expired 696 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of stone massonry water recharging harvesting crete wire structures retaining walls and crate silt at village haripur manguwal diwari bharatgarh ropar
Construction of stone massonry water recharging harvesting crete wire structures retaining walls and crate silt at village haripur manguwal diwari bharatgarh ropar
Read moreSpl repair to bldg no ow-05 and provn of stone masonry retaining wall in 39 mdsr under palampur mil stn
Spl repair to bldg no ow-05 and provn of stone masonry retaining wall in 39 mdsr under palampur mil stn
Read moreRepair / replacement of stone masonary and brick works, retaining walls, fencing at age (i) chakrata under hq cwe dehradun
Repair / replacement of stone masonary and brick works, retaining walls, fencing at age (i) chakrata under hq cwe dehradun
Read moreConstruction of station building, ei building, others building, platform, fob, pp shelter, dismantling of existing building & others structures and other ancillary civil works such as drain work, retaining walls, road works etc. from gomoh ch 300.15 to koderma ch 393.55 in connection with 3rd & 4th multitrack project between pka-mpo section of dhanbad division of ecr under dy.ce/hzme-i
Construction of station building, ei building, others building, platform, fob, pp shelter, dismantling of existing building & others structures and other ancillary civil works such as drain work, retaining walls, road works etc. from gomoh ch 300.15 to koderma ch 393.55 in connection with 3rd & 4th multitrack project between pka-mpo section of dhanbad division of ecr under dy.ce/hzme-i
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreConstruction of stone masonry water recharging structures crate wire structures
Construction of stone masonry water recharging structures crate wire structures rupnagar
Read moreConstruction of stone masonry water recharging structures crate wire structures rupnagar
Construction of stone masonry water recharging structures crate wire structures rupnagar
Read moreConstruction of stone masonry water recharging structures crate wire structures rupnagar
Construction of stone masonry water recharging structures crate wire structures rupnagar
Read moreContruction of stone masonry water recharging and wire crate structures
Construction of stone masonry and wire crate strs. in villages kalewal beet, sauli, gajjar and harjiana under tehsil garhshankar distt. hsp
Read moreof your Industry type