Tender Details
Particulars | Details |
---|---|
Title |
Jh M Ran 02 2023 24
|
Description |
(1) Special Repair Of Road From Chama Mcluskiganj Main Road To
Budh Bazar Via Don Bosco School Paryatan Suchna Kendra Konka
Harijan Tola Lapra Vikas Nagar Beside Micheal Perkings (L 5.10
Km.), (2) Special Repair Of Road From Murupiri School....
|
Organisation | Government of Jharkhand |
Tender Id | 2023_RWD_75122_1 |
Reference Number |
JH-M-RAN-02-2023-24 |
Tender Fee | 10000 |
EMD | 29.6 Lakh |
Tender Value | |
Place | JSRRDA, 3RD FLOOR FFP BUILDING, DHURWA, RANCHI |
Link | https://jharkhandtenders.gov.in |
Start Date | August 25, 2023 23:40 |
End Date |
04/09/2023 ( Expired 649 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply of hydraulic insulator testing jig for tensile load testing of 25kv porcelain and composite insulator as per rdso spec. no. ti/spc/ohe/instest/0090/(02/2009) rev o or latest.
For complete deion and other details, please refer to tender
Read moreDye penetrant kit consisting of red dye penetrant, remover/ cleaner & developer in the ratio 1:4:4 in a set. visibility-type-ii, washability-method-c, sensitivity-level-2, as per rdso s specification no. m&c/ndt/105/2001 of april 2001 or latest. (each can capacity 500ml and content 400ml net) drawing & specification : as per annexure a.
For complete deion and other details, please refer to tender
Read moreRail surface friction meter(tribometer) as per attached rdso specification no. is/rdso: tmm/0001:2023
For complete deion and other details, please refer to tender
Read moreDoor to door maintenance of e/m and allied work at mil stn beas under ge kapurthala.
Door to door maintenance of e/m and allied work at mil stn beas under ge kapurthala.
Read moreDesign, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreProtection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode
Protection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode
Read moreLandslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreJp/b862-000-eb-t-0020/1021 - 220 kv gas insulated substation package for pdh-pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
220 kv gas insulated substation package for pdh-pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
Read moreof your Industry type