Tender Details

Particulars Details
Title
Re Handling Of Spilled Raw Coal/Slurry Accumulated On The Gantry, Beside The Gantry Of 116 A And B, 133 A And Under And Around The Take Up Of 116 A And 133 A B/C Of Pw At Kw
Description
Re Handling Of Spilled Raw Coal/Slurry Accumulated On The Gantry, Beside The Gantry Of 116 A And B, 133 A And Under And Around The Take Up Of 116 A And 133 A B/C Of Pre Washery At&#X0d Kedla Washery. &#X0d
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2025_CCL_326100_1
Reference
Number
PO/KW/E-TENDER/24-25/106, Date-17/01/2025
Tender Fee 0
EMD 7500
Tender Value -
Place KEDLA WASHERY
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=338009

Start Date January 18, 2025 15:30
End Date
Expired 28/01/2025

Expired 590 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Re-handling of spilled raw coal/slurry from head drum to tail drum and under, around the take-up pulley of 133a b/c and gantry, beside the gantry of 116a and b and under and around the take-up pulley of 116a belt conveyor of pre-washery section of kw

Re-handling of spilled raw coal/slurry from head drum to tail drum and under, around the take-up pulley of 133a b/c and gantry, beside the gantry of 116a and b and under and around the take-up pulley of 116a belt conveyor of pre-washery section of kw

Read more
Re-handling of spilled raw coal /slurry from head drum to tail drum, under and around take-up pulley of 133a, ground floor of secondary crusher house and accumulated on the gantry, beside the gantry and take-up area of 116aandb b/c of pw of kw.

Re-handling of spilled raw coal /slurry from head drum to tail drum, under and around take-up pulley of 133a, ground floor of secondary crusher house and accumulated on the gantry, beside the gantry and take-up area of 116aandb b/c of pw of kw.

Read more
Re-handling of spilled rawcoal or slurry accumulated around the i, ii, and iii no. column of 133a and b, i, ii and iv no. column of 116a and b and 118a and b floor at kw.

Re-handling of spilled rawcoal or slurry accumulated around the i, ii, and iii no. column of 133a and b, i, ii and iv no. column of 116a and b and 118a and b floor at kw. &#x0d

Read more
Re-handling of spilled raw coal/slurry accumulated from head drum to tail drum, and around the take-up pulley of 133a and ground floor of secondary crusher house of pre-washery at kedla washery

Re-handling of spilled raw coal/slurry accumulated from head drum to tail drum, and around the take-up pulley of 133a and ground floor of secondary crusher house of pre-washery at kedla washery

Read more
Re-handling of spilled coal or slurry from tail end of 133a and b to rgb sump, exhaust fan house and behind 116a and b tail end of pre-washery of kedla washery

Re-handling of spilled coal or slurry from tail end of 133a and b to rgb sump, exhaust fan house and behind 116a and b tail end of pre-washery of kedla washery.

Read more
Spilled to coal during raw coal receiving approximately 1955m3of coal has been accumulated on the floor of 118a,b b/conv. under and around the take-up pulley 116b b/conv. under and around the take-up pulley of 133b belt conv. and rgb entrance

Spilled to coal during raw coal receiving approximately 1955m3of coal has been accumulated on the floor of 118a,b b/conv. under and around the take-up pulley 116b b/conv. under and around the take-up pulley of 133b belt conv. and rgb entrance

Read more
Fallen take-up and belt re-installation and 165 nos. damaged idler frame repairing of unit no. 116a and b, 133a and b and 118b carriage re-installation of pre-washery at kedla washery

Fallen take-up and belt re-installation and 165 nos. damaged idler frame repairing of unit no. 116a and b, 133a and b and 118b carriage re-installation of pre-washery at kedla washery.

Read more
Fencing of walk-way of 116a,b b/conv. and 133a,b b/conv. and rcb bunker surrounding fencing and 111a1a2 and b1b2 under hopper lining, 133a,b guide channel strengthening and structure column bracing strengthening of pre-washery

Fencing of walk-way of 116a,b b/conv. and 133a,b b/conv. and rcb bunker surrounding fencing and 111a1a2 and b1b2 under hopper lining, 133a,b guide channel strengthening and structure column bracing strengthening of pre-washery

Read more
Rehandling of spilled raw coal accumulated from tail end of 133a and b to sump exhaust fan house, shuttle conveyor floor of 118a and b and under and around the takeup pulley of 116b belt conveyor at prewashery of kedla washery.

Rehandling of spilled raw coal accumulated from tail end of 133aandb to sump exhaust fan house, shuttle conveyor floor of 118aandb and under and around the takeup pulley of 116b belt conveyor at prewashery of kedla washery.

Read more
Removal of accumulated spilled coal slim, mud etc. near surrounding the b/c no. 949 and b/c 950 of rlb section at kathara washery

Removal of accumulated spilled coal slim, mud etc. near surrounding the b/c no. 949 and b/c 950 of rlb section at kathara washery

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise