Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Re Handling Of Spilled Coal Or Slurry From Tail End Of 133 A And B To Rgb Sump, Exhaust Fan House And Behind 116 A And B Tail End Of Pre Washery Of Kedla Washery
|
Description |
Re Handling Of Spilled Coal Or Slurry From Tail End Of 133 A And B To Rgb Sump, Exhaust Fan House And Behind 116 A And B Tail End Of Pre Washery Of Kedla Washery.
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_CCL_329952_1 |
Reference Number |
PO/KW/E-TENDER/24-25/135, Date-22/02/2025 |
Tender Fee | 0 |
EMD | 3300 |
Tender Value | |
Place | KEDLA WASHERY |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=342056 |
Start Date | February 24, 2025 15:30 |
End Date |
06/03/2025 ( Expired 103 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dewatering (pumping out water) of 02 nos. sumps of 1201 pump-house and adjacent pond no. 4 by mechanical means in order to facilitate removal of slurry and smooth operation of 1201 pumps at moonidih coal washery.
Dewatering (pumping out water) of 02 nos. sumps of 1201 pump-house and adjacent pond no. 4 by mechanical means in order to facilitate removal of slurry and smooth operation of 1201 pumps at moonidih coal washery.
Read moreDismantling, fabrication, repairing and re-erection of chute from feeder no. 1 and 2 to conveyor a at bhojudih coal washery.
Dismantling, fabrication, repairing and re-erection of chute from feeder no. 1 and 2 to conveyor a at bhojudih coal washery.
Read moreInternal clearance of sump of main and additional pump house no.2 of loharu canal and silt re-used for strengthening the bank of loharu canal from rd 44500 to 46950-r
Internal clearance of sump of main and additional pump house no.2 of loharu canal and silt re-used for strengthening the bank of loharu canal from rd 44500 to 46950-r
Read moreInternal clearance of sump of main and additional pump house no.3 of loharu canal and silt re-used for strengthening the bank of loharu canal from rd 44500 to 46950-r
Internal clearance of sump of main and additional pump house no.3 of loharu canal and silt re-used for strengthening the bank of loharu canal from rd 44500 to 46950-r
Read moreRegular cleaning of malma/debris/slurry from below and sides of 1000mm belt conveyor and tail end point of 15 no. incline mouth to underground upto 2l in 4a seam at jhiria ug mine
Regular cleaning of malma/debris/slurry from below and sides of 1000mm belt conveyor and tail end point of 15 no. incline mouth to underground upto 2l in 4a seam at jhiria ug mine
Read moreCleaning of drain from drive house b-14/15 to s/s 3.3 kv sub station behind agm office with protection wall against the flood and cleaning of culvert infront of silo 1-2 at dipka expansion project of dipka area
Cleaning of drain from 
 drive house b-14/15 to 
 s/s 3.3 kv sub station 
 behind agm office with 
 protection wall against 
 the flood and cleaning of 
 culvert infront of silo 1-2 
 at dipka expansion 
 project of dipka area
Read moreUpkeepment of spilled materials from deck plates, rollers, gallery and ground area tail end side of 1201 and 1301 belt conveyor of ps-9 section at madhuban coal washery under block-ii area, bccl .
Upkeepment of spilled materials from deck plates, rollers, gallery and ground area tail end side of 1201 and 1301 belt conveyor of ps-9 section at madhuban coal washery under block-ii area, bccl .
Read moreKtps-v-general-engaging of 1 no mini bus-ii of 32 seater capacity with two drivers and two cleaners for conveyance of shift, maintenance, general engineers and office staff from tggenco housing colony to power house and back, school going children from tggenco housing colony to local schools and back and for any other purpose as entrusted by the tggenco officials for the period from 01.04.2025(or from actual date of utilization) to 31.03.2026.(bus of model on or after april 2018 only will be pre
Ktps-v-general-engaging of 1 no. mini bus-ii of 32 seater capacity with two drivers and two cleaners for conveyance of shift, maintenance, general engineers and office staff from tggenco housing colony to power house and back, school going children from tggenco housing colony to local schools and back and for any other purpose as entrusted by the tggenco officials for the period from 01.04.2025(or from actual date of utilization) to 31.03.2026.(bus of model on or after april 2018 only will be preferred).
Read moreRepairing/ strengthening of approaching stair case and its support for stairs going up to tail end of unit 504, 301-a and 301-b and head end of unit 402 conveyor belt for safety point of view at moonidih coal washery.
Repairing/ strengthening of approaching stair case and its support for stairs going up to tail end of unit 504, 301-a and 301-b and head end of unit 402 conveyor belt for safety point of view at moonidih coal washery.
Read moreEchpii upkeepment and clearing of coal on walkways, belt side to the entire length of conveyor, deck sheets from head end to tail end of conveyor 48a1 48b1 at sch ii
Echpii upkeepment and clearing of coal on walkways, belt side to the entire length of conveyor, deck sheets from head end to tail end of conveyor 48a1 48b1 at sch ii
Read moreof your Industry type