Tender Details
Particulars | Details |
---|---|
Title |
Re Handling Of Spilled Coal Or Slurry From Tail End Of 133 A And B To Rgb Sump, Exhaust Fan House And Behind 116 A And B Tail End Of Pre Washery Of Kedla Washery
|
Description |
Re Handling Of Spilled Coal Or Slurry From Tail End Of 133 A And B To Rgb Sump, Exhaust Fan House And Behind 116 A And B Tail End Of Pre Washery Of Kedla Washery.
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_CCL_329952_1 |
Reference Number |
PO/KW/E-TENDER/24-25/135, Date-22/02/2025 |
Tender Fee | 0 |
EMD | 3300 |
Tender Value | |
Place | KEDLA WASHERY |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=342056 |
Start Date | February 24, 2025 15:30 |
End Date |
06/03/2025 ( Expired 48 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Regular cleaning of malma/debris/slurry from below and sides of 1000mm belt conveyor and tail end point of 15 no. incline mouth to underground upto 2l in 4a seam at jhiria ug mine
Regular cleaning of malma/debris/slurry from below and sides of 1000mm belt conveyor and tail end point of 15 no. incline mouth to underground upto 2l in 4a seam at jhiria ug mine
Read moreCleaning of drain from drive house b-14/15 to s/s 3.3 kv sub station behind agm office with protection wall against the flood and cleaning of culvert infront of silo 1-2 at dipka expansion project of dipka area
Cleaning of drain from 
 drive house b-14/15 to 
 s/s 3.3 kv sub station 
 behind agm office with 
 protection wall against 
 the flood and cleaning of 
 culvert infront of silo 1-2 
 at dipka expansion 
 project of dipka area
Read moreUpkeepment of spilled materials from deck plates, rollers, gallery and ground area tail end side of 1201 and 1301 belt conveyor of ps-9 section at madhuban coal washery under block-ii area, bccl .
Upkeepment of spilled materials from deck plates, rollers, gallery and ground area tail end side of 1201 and 1301 belt conveyor of ps-9 section at madhuban coal washery under block-ii area, bccl .
Read moreKtps-v-general-engaging of 1 no mini bus-ii of 32 seater capacity with two drivers and two cleaners for conveyance of shift, maintenance, general engineers and office staff from tggenco housing colony to power house and back, school going children from tggenco housing colony to local schools and back and for any other purpose as entrusted by the tggenco officials for the period from 01.04.2025(or from actual date of utilization) to 31.03.2026.(bus of model on or after april 2018 only will be pre
Ktps-v-general-engaging of 1 no. mini bus-ii of 32 seater capacity with two drivers and two cleaners for conveyance of shift, maintenance, general engineers and office staff from tggenco housing colony to power house and back, school going children from tggenco housing colony to local schools and back and for any other purpose as entrusted by the tggenco officials for the period from 01.04.2025(or from actual date of utilization) to 31.03.2026.(bus of model on or after april 2018 only will be preferred).
Read moreRepairing/ strengthening of approaching stair case and its support for stairs going up to tail end of unit 504, 301-a and 301-b and head end of unit 402 conveyor belt for safety point of view at moonidih coal washery.
Repairing/ strengthening of approaching stair case and its support for stairs going up to tail end of unit 504, 301-a and 301-b and head end of unit 402 conveyor belt for safety point of view at moonidih coal washery.
Read moreEchpii upkeepment and clearing of coal on walkways, belt side to the entire length of conveyor, deck sheets from head end to tail end of conveyor 48a1 48b1 at sch ii
Echpii upkeepment and clearing of coal on walkways, belt side to the entire length of conveyor, deck sheets from head end to tail end of conveyor 48a1 48b1 at sch ii
Read moreShifting of 3000gpm pump motor of jarlahi coal sump from damaged pontoon and installation on ground level and maintenance of pump and reorganise its pipeline and transporting of damage pontoon to the f/b for repairing at phularitand,ampc.
Shifting of 3000gpm pump motor of jarlahi coal 
 sump from damaged pontoon and installation on 
 ground level and maintenance of pump and reorganise its pipeline and transporting of damage pontoon to the f/b for repairing at phularitand,ampc.
Read moreUpkeepment of spilled materials from tail end side of unit no. 301 belt conveyor, deck plates, gallery, rollers etc. at madhuban coal washery under block-ii area, bccl
Upkeepment of spilled materials from tail end side of unit no. 301 belt conveyor, deck plates, gallery, rollers etc. at madhuban coal washery under block-ii area, bccl
Read more(a) re-organised of 220 volt overhead lighting line at chatkari jore to coal depotand (b) repairing of 550 volt overhead line from bagdigi pit to bagdigi basti and (c) power supply to high mast tower installed at coal depot of bagdigi colliery
(a) re-organised of 220 volt overhead lighting line at chatkari jore to coal depotand (b) repairing of 550 volt overhead line from bagdigi pit to bagdigi basti and (c) power supply to high mast tower installed at coal depot of bagdigi colliery
Read moreRe-handling of spilled coal or slurry from tail end of 133a and b to rgb sump, exhaust fan house and behind 116a and b tail end of pre-washery of kedla washery
Re-handling of spilled coal or slurry from tail end of 133a and b to rgb sump, exhaust fan house and behind 116a and b tail end of pre-washery of kedla washery.
Read moreof your Industry type