Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Fallen Take Up And Belt Re Installation And 165 Nos. Damaged Idler Frame Repairing Of Unit No. 116 A And B, 133 A And B And 118 B Carriage Re Installation Of Pre Washery At Kedla Washery
|
| Description |
Fallen Take Up And Belt Re Installation And 165 Nos. Damaged Idler Frame Repairing Of Unit No. 116 A And B, 133 A And B And 118 B Carriage Re Installation Of Pre Washery At Kedla Washery.
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_CCL_325870_1 |
|
Reference Number |
PO/KW/E-TENDER/24-25/99, Date-15/01/2025 |
| Tender Fee | 0 |
| EMD | 3900 |
| Tender Value | - |
| Place | KEDLA WASHERY |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=337782 |
| Start Date | January 16, 2025 15:30 |
| End Date |
Expired
27/01/2025
Expired 625 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Belt changing of unit no. 133a belt conveyor and derailed carriage re-installation of shuttle conveyor 118b of pre-washery at kedla washery
Belt changing of unit no. 133a belt conveyor and derailed carriage re-installation of shuttle conveyor 118b of pre-washery at kedla washery
Read moreComplete repairing and reconditioning of pre-washery l.t. motor panel of 133a and 118b of kedla washery under hazaribag area.
Complete repairing and reconditioning of pre-washery l.t. motor panel of 133a and 118b of kedla washery under hazaribag area.
Read moreRepairing of 06 halves gc-10 gear coupling for unit no. 116a, 133a and 133b of pre-washery at kedla washery
Repairing of 06 halves gc-10 gear coupling for unit no. 116a, 133a and 133b of pre-washery at kedla washery
Read moreComplete repairing of 02 nos. (pairs) spure and pinion gear of unit no. 118b belt conveyor and 06 halves gc-10 gear coupling for unit no. 116a, 133a and 133b of pre-washery at kedla washery
Complete repairing of 02 nos. (pairs) spure and pinion gear of unit no. 118b belt conveyor and 06 halves gc-10 gear coupling for unit no. 116a, 133a and 133b of pre-washery at kedla washery
Read moreRe-handling of spilled coal or slurry from tail end of 133a and b to rgb sump, exhaust fan house and behind 116a and b tail end of pre-washery of kedla washery
Re-handling of spilled coal or slurry from tail end of 133a and b to rgb sump, exhaust fan house and behind 116a and b tail end of pre-washery of kedla washery.
Read moreDeck plate channel changing of 133a belt conveyor of pre-washery section at kedla washery
Deck plate channel changing of 133a belt conveyor of pre-washery section at kedla washery
Read moreComplete repairing of 02 nos. take-up pulley of size dia 800x1400mm of unit no. 133b and 116a belt conveyor of pre-washery at kedla washery.
Complete repairing of 02 nos. take-up pulley of size dia 800x1400mm of unit no. 133b and 116a belt conveyor of pre-washery at kedla washery.
Read more116b belt changing, 118b belt changing, a1 and b1 jammed bunker cleaning of pre-washery at kedla washery
116b belt changing, 118b belt changing, a1 and b1 jammed bunker cleaning of pre-washery at kedla washery
Read moreRe-installation of fallen take-up with 60mtrs. belt conv. of unit no. 116b and repairing of 100 nos. damaged idler frame and re-installation of 300 idlers and a2 bunker beam changing with old grizzly sector repairing in pre-washery at kedla washery
Re-installation of fallen take-up with 60mtrs. belt conv. of unit no. 116b and repairing of 100 nos. damaged idler frame and re-installation of 300 idlers and a2 bunker beam changing with old grizzly sector repairing in pre-washery at kedla washery
Read moreRe-handling of spilled raw coal/slurry accumulated from head drum to tail drum, and around the take-up pulley of 133a and ground floor of secondary crusher house of pre-washery at kedla washery
Re-handling of spilled raw coal/slurry accumulated from head drum to tail drum, and around the take-up pulley of 133a and ground floor of secondary crusher house of pre-washery at kedla washery
Read moreof your Industry type