Re Handling Of Spilled Raw Coal /Slurry From Head Drum To Tail Drum, Under And Around Take Up Pulley Of 133 A, Ground Floor Of Secondary Crusher House And Accumulated On The Gantry, Beside The Gantry And Take Up Area Of 116 Aand B B/C Of Pw Of Kw.
Description
Re Handling Of Spilled Raw Coal /Slurry From Head Drum To Tail Drum, Under And Around Take Up Pulley Of 133 A, Ground Floor Of Secondary Crusher House And Accumulated On The Gantry, Beside The Gantry And Take Up Area Of 116 Aand B B/C Of Pw Of Kw.
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2024_CCL_313688_1
Reference
Number
PO/KW/E-Tender/24-25/16, Dated-29.07.2024
Tender Fee 0
EMD 5500
Tender Value -
Place KEDLA WASHERY
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=325086

Start Date July 30, 2024 16:30
End Date
Expired 14/08/2024

Expired 791 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Re-handling of spilled raw coal/slurry accumulated on the gantry, beside the gantry of 116 a and b, 133a and under and around the take-up of 116a and 133a b/c of pw at kw

Re-handling of spilled raw coal/slurry accumulated on the gantry, beside the gantry of 116 a and b, 133a and under and around the take-up of 116a and 133a b/c of pre-washery at&#x0d kedla washery. &#x0d

Read more
Re-handling of spilled raw coal/slurry accumulated from head drum to tail drum, and around the take-up pulley of 133a and ground floor of secondary crusher house of pre-washery at kedla washery

Re-handling of spilled raw coal/slurry accumulated from head drum to tail drum, and around the take-up pulley of 133a and ground floor of secondary crusher house of pre-washery at kedla washery

Read more
Re-handling of spilled raw coal/slurry from head drum to tail drum and under, around the take-up pulley of 133a b/c and gantry, beside the gantry of 116a and b and under and around the take-up pulley of 116a belt conveyor of pre-washery section of kw

Re-handling of spilled raw coal/slurry from head drum to tail drum and under, around the take-up pulley of 133a b/c and gantry, beside the gantry of 116a and b and under and around the take-up pulley of 116a belt conveyor of pre-washery section of kw

Read more
Re-handling of spilled rawcoal or slurry accumulated around the i, ii, and iii no. column of 133a and b, i, ii and iv no. column of 116a and b and 118a and b floor at kw.

Re-handling of spilled rawcoal or slurry accumulated around the i, ii, and iii no. column of 133a and b, i, ii and iv no. column of 116a and b and 118a and b floor at kw. &#x0d

Read more
Re-handling of spilled coal or slurry from tail end of 133a and b to rgb sump, exhaust fan house and behind 116a and b tail end of pre-washery of kedla washery

Re-handling of spilled coal or slurry from tail end of 133a and b to rgb sump, exhaust fan house and behind 116a and b tail end of pre-washery of kedla washery.

Read more
Rehandling of spilled raw coal accumulated from tail end of 133a and b to sump exhaust fan house, shuttle conveyor floor of 118a and b and under and around the takeup pulley of 116b belt conveyor at prewashery of kedla washery.

Rehandling of spilled raw coal accumulated from tail end of 133aandb to sump exhaust fan house, shuttle conveyor floor of 118aandb and under and around the takeup pulley of 116b belt conveyor at prewashery of kedla washery.

Read more
Spilled to coal during raw coal receiving approximately 1955m3of coal has been accumulated on the floor of 118a,b b/conv. under and around the take-up pulley 116b b/conv. under and around the take-up pulley of 133b belt conv. and rgb entrance

Spilled to coal during raw coal receiving approximately 1955m3of coal has been accumulated on the floor of 118a,b b/conv. under and around the take-up pulley 116b b/conv. under and around the take-up pulley of 133b belt conv. and rgb entrance

Read more
Removal of accumulated spilled coal, mud, slime etc. surrounding the b/c no. 52, 66, 74, 79, 136, 138, 143, 144, 180, 181, 201 and b/c no.202 of primary crusher, secondary crusher and raw coal bunker upto hms top section at kathara washery

Removal of accumulated spilled coal, mud, slime etc. surrounding the b/c no. 52, 66, 74, 79, 136, 138, 143, 144, 180, 181, 201 and b/c no.202 of primary crusher, secondary crusher and raw coal bunker upto hms top section at kathara washery

Read more
Supply installation testing and commissioning of pintle type take up in place of crd cable reeling drum and accessories of gantry crane at power house and trcm cum gantry crane at dam of rangit power station

Supply installation testing and commissioning of pintle type take up in place of crd cable reeling drum and accessories of gantry crane at power house and trcm cum gantry crane at dam of rangit power station

Read more
Re-handling of spilled raw coal/slurry under and around the take-up pulley 116b and 133b and rgb entrance to tail end of 133b belt conveyor of pre-washery at kedla washery

Re-handling of spilled raw coal/slurry under and around the take-up pulley 116b and 133b and rgb entrance to tail end of 133b belt conveyor of pre-washery at kedla washery

Read more