Tender Details

Particulars Details
Title
Construction Of 4laning Of Marakkanam(design Km62.000) To Puducherry(design Km108.042) Of Mamallapuram Puducherry Section Of Nh332 A In Tamil Nadu On Ham.
Description
Construction Of 4laning Of Marakkanam(design Km62.000) To Puducherry(design Km108.042) Of Mamallapuram Puducherry Section Of Nh332 A In Tamil Nadu On Ham.
Organisation National Highways Authority of India | Public Sector Undertakings
Tender Id 2022_NHAI_136832_1
Reference
Number
-
Tender Fee 1.3 Lakh
EMD 12.87 Crore
Tender Value -
Place NHAI HQ
Link
View Original Tender Notice

https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=149486

Start Date November 30, 2022 00:00
End Date
Expired 14/03/2024

Expired 944 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Upgradation to two lane with paved shoulder of porbandar bhanvad jamjodhpur kalavad section of nh-151k from design km 0.000 to design km 119.500 in the state of gujarat on ham.

Upgradation to two lane with paved shoulder of porbandar bhanvad jamjodhpur kalavad section of nh-151k from design km 0.000 to design km 119.500 in the state of gujarat on ham.

Read more
Develop. of 6l ac gf regional expressway on northern side of hyderabad from pragnapur vill design ch82.000 to tangad palle vill design ch160.000 for a design l of 78.000 km in the state of telangana under nh(o) on ham pkgii

Develop. of 6l ac gf regional expressway on northern side of hyderabad from pragnapur vill design ch82.000 to tangad palle vill design ch160.000 for a design l of 78.000 km in the state of telangana under nh(o) on ham pkgii

Read more
4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)

4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)

Read more
Ie services for 4laning of jagtial-karimnagar section of nh-563 from jagtial bypass start at design ch.0.000 (ex.chainage 90-500 on nh-63) to design ch.58.866 km (ch.170.400 km) at karimnagar bypass end (58.866 km) to be executed on bot mode nh o

Ie services for 4laning of jagtial-karimnagar section of nh-563 from jagtial bypass start at design ch.0.000 (ex.chainage 90-500 on nh-63) to design ch.58.866 km (ch.170.400 km) at karimnagar bypass end (58.866 km) to be executed on bot mode nh o

Read more
Construction of six lane access controlled amaravati outer ring road from kolavennu to kornepadu on ham in andhra pradesh. package 3 (from design ch. km. 83.000 to 133.500) (narakoduru spur from design km.0.000 to km.5.300)

Construction of six lane access controlled amaravati outer ring road from kolavennu to kornepadu on ham in andhra pradesh. package 3 (from design ch. km. 83.000 to 133.500) (narakoduru spur from design km.0.000 to km.5.300)

Read more
Consultancy services for independent engineer for 4 laning of muzaffarpur sitamarhi sonbarsa section of nh 22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham) (2nd call)

Consultancy services for independent engineer for 4 laning of muzaffarpur sitamarhi sonbarsa section of nh 22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham) (2nd call)

Read more
Rehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of jhansi orai section (pkg-2) from design km 1423.000 sultanpura village to design km 1469.000 near ingui khurd village nh-27 in up on ham mode. (tl46.000 kms).

Rehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of jhansi orai section (pkg-2) from design km 1423.000 sultanpura village to design km 1469.000 near ingui khurd village nh-27 in up on ham mode. (tl46.000 kms).

Read more
Development of high speed ac gf highway from shamli gorakhpur from ch.466.000 to ch.510.700 in the state of uttar pradesh on ham mode package9 design length 44.700 km

Development of high speed ac gf highway from shamli gorakhpur from ch.466.000 to ch.510.700 in the state of uttar pradesh on ham mode package9 design length 44.700 km

Read more
Rehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of jhansi orai section (pkg-3) from design km 1469.000 near ingui khurd village to design km 1515.710 near orai (bandha village) nh-27 in uttar pradesh on ham mode.

Rehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of jhansi orai section (pkg-3) from design km 1469.000 near ingui khurd village to design km 1515.710 near orai (bandha village) nh-27 in uttar pradesh on ham mode.

Read more
Rehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of jhansi-orai sec. (pkg-1) from design km 1378.915 near jhansi (sijwaha tiraha nh27) to design 1423.000 near sultanpura village nh-27 in up on ham mode. (tl44.085 kms)

Rehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of jhansi-orai sec. (pkg-1) from design km 1378.915 near jhansi (sijwaha tiraha nh27) to design 1423.000 near sultanpura village nh-27 in up on ham mode. (tl44.085 kms)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise