Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Operation And Maintenance Of Ranchi Bypass Section From Km 113.700 To 140.000 26.27 Km In Length Of Nh 33 In The State Of Jharkhand
|
| Description |
Operation And Maintenance Of Ranchi Bypass Section From Km 113.700 To 140.000 26.27 Km In Length Of Nh 33 In The State Of Jharkhand
|
| Organisation | National Highways Authority of India | Public Sector Undertakings |
| Tender Id | 2024_NHAI_206191_1 |
|
Reference Number |
NHAI/RO/RNC/JH/2024-25/3 |
| Tender Fee | 10000 |
| EMD | 21.54 Lakh |
| Tender Value | - |
| Place | RO-Ranchi |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=225440 |
| Start Date | August 27, 2024 23:20 |
| End Date |
Expired
09/10/2024
Expired 701 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of road from jurgudih yatra mela dangal nh-419 main road to hisadih tola via jurgudih (1.000 km)
Construction of road from jurgudih yatra mela dangal nh-419 main road to hisadih tola via jurgudih (1.000 km)
Read moreWidening and strengthening, reconstruction work of rani road, rob barmasiya to kusumatand (mukunda) more via jhariya vihar colony belgariya road (length-7.612 km) in dhanbad district on deposit basis
Widening and strengthening, reconstruction work of rani road, rob barmasiya to kusumatand (mukunda) more via jhariya vihar colony belgariya road (length-7.612 km) in dhanbad district on deposit basis
Read moreConsultancy services for dpr preparation for oti of nh-43, nh-543 and nh-45 (total length 25.15 km) in the state of madhya pradesh
Consultancy services for dpr preparation for oti of nh-43, nh-543 and nh-45 (total length 25.15 km) in the state of madhya pradesh
Read moreBalance work of avenue plantation advance field preparation, planting and maintenance along km. 113.700 to km. 123.700 section of nh 33 under piu ranchi, regional office ranchi in the state of jharkhand
Balance work of avenue plantation advance field preparation, planting and maintenance along km. 113.700 to km. 123.700 section of nh 33 under piu ranchi, regional office ranchi in the state of jharkhand
Read moreConstruction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call
Construction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call
Read moreEngagement of user fee collection agency on the basis of eq through e-tender for turup fpat km. 119.967 for the use of four laning of ranchi bypass section of nh-33 from km 113.730 to km 140.000 in jharkhand
Engagement of user fee collection agency on the basis of eq through e-tender for turup fpat km. 119.967 for the use of four laning of ranchi bypass section of nh-33 from km 113.730 to km 140.000 in jharkhand
Read moreRwd/ranchi/ 28/2024-25 construction of road from nh 33 jamchuan to ulidih (length-2.15 km.)
Rwd/ranchi/ 28/2024-25 construction of road from nh 33 jamchuan to ulidih (length-2.15 km.)
Read moreConstruction of bridge over baru river connecting gram ichadih to nh 33 main road under tamar block ranchi district.
Construction of bridge over baru river connecting gram ichadih to nh 33 main road under tamar block ranchi district.
Read moreOperation and maintenance works for the stretch from rampur to chowka ch 140.000 to 217.300 77.300 km length section of nh 33 in the state of jharkhand
Operation and maintenance works for the stretch from rampur to chowka ch 140.000 to 217.300 77.300 km length section of nh 33 in the state of jharkhand
Read moreRwd/ranchi/01/2022-23, construction of road from ranchi purulia road nh 4 railway flyover to arra tangratoli via nayatoli (l-3.22 km.)
Rwd/ranchi/01/2022-23, construction of road from ranchi purulia road nh 4 railway flyover to arra tangratoli via nayatoli (l-3.22 km.)
Read moreof your Industry type