Tender Details

Particulars Details
Title
M R Works To 4 K/A 1
Description
M And R Works For Section No.4 K/A 1 Area I.E., Ma And Nb Type Quarters Including Kcoa Club For The Year 2024 25 At Ganeshpuram Area, Kothagudem Corporate, Bhadradri Kothagudem District, Telangana State.(Invited Under Earmarked Works Sccl Registered Contractors Belonging To Waddera / Sagara (Uppara) Community Only Are Eligible Tp Participate).
Organisation Information Technology Electronics and Communication Department Telangana | State Govt. and UT
Tender Id 519652
Reference
Number
CW/KGM/e-18/2024-25
Tender Fee 1332
EMD 1
Tender Value
Place TS
Link http://eprocurement.telangana.gov.in/
Start Date June 16, 2024 03:00
End Date

01/07/2024 ( Expired 339 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Read more
Door to door maintenance of e/m and allied work at mil stn beas under ge kapurthala.

Door to door maintenance of e/m and allied work at mil stn beas under ge kapurthala.

Read more
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Read more
Appointment of issuing bank for a letter of credit

Invitation to act as issuing bank for an aggregate/portfolio letter of credit (lc) to cover three sub-projects, such lc backstopped by a guarantee from the international bank for reconstruction and development (ibrd) to support the sngrbp

Read more
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.

Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.

Read more
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Read more
Ca no. ge af no.1/gur-11/2025-26 repair to chajja, aluminium fitting, wall tiles, plastering, flooring, joinery, including upvc door windows, pathway and repair to swts at 54 asp under ge(af) gurgaon no 1

Ca no. ge af no.1/gur-11/2025-26 repair to chajja, aluminium fitting, wall tiles, plastering, flooring, joinery, including upvc door windows, pathway and repair to swts at 54 asp under ge(af) gurgaon no 1

Read more
Special repair to bldg no t 13 15 a and certain other sanctioned works at lekhapani under ge dinjan no 2

Special repair to bldg no t 13 15 a and certain other sanctioned works at lekhapani under ge dinjan no 2

Read more
Ie services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)

Ie services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise