Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Rcc Gutter In Between Green Belt Of Dps School Playground To Railway Over Bridge Kille Gaothan Road In Belapur Ward.
|
| Description |
Construction Of Rcc Gutter In Between Green Belt Of Dps School Playground To Railway Over Bridge Kille Gaothan Road In Belapur Ward.
|
| Organisation | Navi Mumbai Municipal Corporation | State Govt. and UT |
| Tender Id | 2024_NMMC_1123798_1 |
|
Reference Number |
NMMC/ CE/291/2024-2025 |
| Tender Fee | 1680 |
| EMD | 76000 |
| Tender Value | - |
| Place | Executive Engineer Belapur NMMC |
| Link |
View Original Tender Notice
https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1961513 |
| Start Date | December 13, 2024 15:30 |
| End Date |
Expired
19/12/2024
Expired 665 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Eimwb: proposal of 07 railway owned eimwbs over ckp division at buf, ltk, jrli, dps, jnk, bspx, brmp.
Eimwb: proposal of 07 railway owned eimwbs over ckp division at buf, ltk, jrli, dps, jnk, bspx, brmp.
Read moreConstruction of road over bridge (full rob) in lieu of level crossing no. am -34 at km -323/14-15 between jamadoba -bhaga station under adra division, road over bridge (only approach portion) in lieu of level crossing no. 239 at rly. km. 149/29-31 between railway station tangarmunda-dharuadihi at bamra railway station yard under chakradharpur division , road over bridge (only approach portion) in lieu of level crossing no. 256 at rly. km. 510/12-14 between railway station dhutra-jharsuguda in
Construction of road over bridge (full rob) in lieu of level crossing no. am -34 at km -323/14-15 between jamadoba -bhaga station under adra division, road over bridge (only approach portion) in lieu of level crossing no. 239 at rly. km. 149/29-31 between railway station tangarmunda-dharuadihi at bamra railway station yard under chakradharpur division , road over bridge (only approach portion) in lieu of level crossing no. 256 at rly. km. 510/12-14 between railway station dhutra-jharsuguda in
Read moreConstruction of 2-lane end-to-end robs with reinforced earth wall (re wall) approaches, psc girder viaducts and rdso s camel back truss girder over the railway portion including lhs in lieu of level crossing nos. 245/b1 [km 630/9-10 between mankapur-jhilahi] and 318 spl [km 742/3-4 between jahangirabad-barabanki] in lucknow division of north eastern railway
Construction of 2-lane end-to-end robs with reinforced earth wall (re wall) approaches, psc girder viaducts and rdso s camel back truss girder over the railway portion including lhs in lieu of level crossing nos. 245/b1 [km 630/9-10 between mankapur-jhilahi] and 318 spl [km 742/3-4 between jahangirabad-barabanki] in lucknow division of north eastern railway
Read moreEngineering, procurement and construction (epc) agreement for construction of 3rd and 4th railway line adjacent to the existing broad gauge (bg) electrified double line including civil engineering works, track works, signalling & telecommunication works, over head electrification, electrical general services & all other allied works between delhi subjimandi (szm) to ambala cantt (umb) in delhi & ambala divisions of northern railway
Engineering, procurement and construction (epc) agreement for construction of 3rd and 4th railway line adjacent to the existing broad gauge (bg) electrified double line including civil engineering works, track works, signalling & telecommunication works, over head electrification, electrical general services & all other allied works between delhi subjimandi (szm) to ambala cantt (umb) in delhi & ambala divisions of northern railway
Read moreElectrical work in c/w provision of relay hut for gate signalling at non interlocked l-xing gates over ambala division (tvu between 10,000 and 20,000), provision of fob with ramp at raipur haryana railway station,provision of 3 meter wide fob(foot over bridge) at sbj(saraibanjara) railway station,extension and raising of existing platforms to high level at jamalpur shekhan, lehra gaga, and himmantana,construction of new 10 bedded barracks for rpf out post at abhor with furniture and electric w
Electrical work in c/w provision of relay hut for gate signalling at non interlocked l-xing gates over ambala division (tvu between 10,000 and 20,000), provision of fob with ramp at raipur haryana railway station,provision of 3 meter wide fob(foot over bridge) at sbj(saraibanjara) railway station,extension and raising of existing platforms to high level at jamalpur shekhan, lehra gaga, and himmantana,construction of new 10 bedded barracks for rpf out post at abhor with furniture and electric w
Read moreConstruction of road over bridge no: 114 (span: 1x18.0m cg+1x60.m camel back truss girder+1x18.0m composite girder) at project chainage 80028 in badampahar yard in connection with construction of new line in between kendujhargarh - badampahar section under the jurisdiction of dy. ce/con/tata of s. e. railway.
Construction of road over bridge no: 114 (span: 1x18.0m cg+1x60.m camel back truss girder+1x18.0m composite girder) at project chainage 80028 in badampahar yard in connection with construction of new line in between kendujhargarh - badampahar section under the jurisdiction of dy. ce/con/tata of s. e. railway.
Read moreJeypore - nabarangpur new bg railway line project: design & construction of new bg railway line between ambaguda(excluding) (13.60 km) to nabarangpur(including) (43.996km) involving earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridges(excluding bridge no. 85 at km. 37.080 i.e. indravati bridge), road over bridges (robs), road under bridges (rubs), protection works, p.way track works with contractor s own material suppl
Jeypore - nabarangpur new bg railway line project: design & construction of new bg railway line between ambaguda(excluding) (13.60 km) to nabarangpur(including) (43.996km) involving earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridges(excluding bridge no. 85 at km. 37.080 i.e. indravati bridge), road over bridges (robs), road under bridges (rubs), protection works, p.way track works with contractor s own material suppl
Read moreDesign, supply, erection, testing & commissioning of 2x25 kv, 50 hz, traction over-head equipment, traction substations, switching stations, scada, general electrical services works along with ohe works in 5 nos of tunnels (total length:7.5 kms), civil engineering works and other associated works between section digras (excl.) - nanded (excl.) 128 rkm /146 tkm of nagpur division in central railway, maharashtra, india
Design, supply, erection, testing & commissioning of 2x25 kv, 50 hz, traction over-head equipment, traction substations, switching stations, scada, general electrical services works along with ohe works in 5 nos of tunnels (total length:7.5 kms), civil engineering works and other associated works between section digras (excl.) - nanded (excl.) 128 rkm /146 tkm of nagpur division in central railway, maharashtra, india
Read moreConstruction of foundation, substructure and superstructure of important bridge no. 18 comprising 4 x 30.5 m + 3 x 45.70 m + 2 x 30.50 m + 2 x 45.70 m + 4 x 30.50 m open web girder spans, including pile foundation and 800 m approaches, for single-line railway track conforming to rdso 25 t axle load standard and substructure designed for 32.5 t loading over river barakar between barakar and kumardubi stations from km 229/30 to km 230/16 (f/hwh), of eastern railway
Construction of foundation, substructure and superstructure of important bridge no. 18 comprising 4 x 30.5 m + 3 x 45.70 m + 2 x 30.50 m + 2 x 45.70 m + 4 x 30.50 m open web girder spans, including pile foundation and 800 m approaches, for single-line railway track conforming to rdso 25 t axle load standard and substructure designed for 32.5 t loading over river barakar between barakar and kumardubi stations from km 229/30 to km 230/16 (f/hwh), of eastern railway
Read moreConstruction of foundation, substructure and superstructure of important bridge no. 18 comprising 4 x 30.5 m + 3 x 45.70 m + 2 x 30.50 m + 2 x 45.70 m + 4 x 30.50 m open web girder spans, including pile foundation and 800 m approaches, for single-line railway track conforming to rdso 25 t axle load standard and substructure designed for 32.5 t loading over river barakar between barakar and kumardubi stations from km 229/30 to km 230/16 (f/hwh), of eastern railway
Construction of foundation, substructure and superstructure of important bridge no. 18 comprising 4 x 30.5 m + 3 x 45.70 m + 2 x 30.50 m + 2 x 45.70 m + 4 x 30.50 m open web girder spans, including pile foundation and 800 m approaches, for single-line railway track conforming to rdso 25 t axle load standard and substructure designed for 32.5 t loading over river barakar between barakar and kumardubi stations from km 229/30 to km 230/16 (f/hwh), of eastern railway
Read moreof your Industry type