Tender Details

Particulars Details
Title
Construction Of 2 Lane End To End Ro Bs With Reinforced Earth Wall (Re Wall) Approaches, Psc Girder Viaducts And Rdso S Camel Back Truss Girder Over The Railway Portion Including Lhs In Lieu Of Level Crossing Nos. 245/B1 [Km 630/9 10 Between Mankapur Jhilahi] And 318 Spl [Km 742/3 4 Between Jahangirabad Barabanki] In Lucknow Division Of North Eastern Railway
Description
Construction Of 2 Lane End To End Ro Bs With Reinforced Earth Wall (Re Wall) Approaches, Psc Girder Viaducts And Rdso S Camel Back Truss Girder Over The Railway Portion Including Lhs In Lieu Of Level Crossing Nos. 245/B1 [Km 630/9 10 Between Mankapur Jhilahi] And 318 Spl [Km 742/3 4 Between Jahangirabad Barabanki] In Lucknow Division Of North Eastern Railway
Organisation Ministry of Railways
Tender Id Login to view
Reference
Number
Login to view
Tender Fee -
EMD -
Tender Value -
Place
Link Login to view
Start Date October 14, 2026 03:17
End Date
Open 18/11/2026

34 days left

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Inspection of 01 no. bridge and 04 no. of bow string girder robs of gc section of ddu division using high resolution image &video capture uav drone under sse/br/ddu. (br no.345/dn between station gaya-mpo at km-466/21-467/15, and bow string girder spans of robs (1x60m) between dos-phe at km-556/25-27, rob(1x60m) in bet. station phe-kwd at km-562/11-13, rob(1x60m) phe-kwd at km-564/19-21,rob(1x60m) between kwd-ssm at km-566/19-21).

Inspection of 01 no. bridge and 04 no. of bow string girder robs of gc section of ddu division using high resolution image &video capture uav drone under sse/br/ddu. (br no.345/dn between station gaya-mpo at km-466/21-467/15, and bow string girder spans of robs (1x60m) between dos-phe at km-556/25-27, rob(1x60m) in bet. station phe-kwd at km-562/11-13, rob(1x60m) phe-kwd at km-564/19-21,rob(1x60m) between kwd-ssm at km-566/19-21).

Read more
Construction of road over bridge no: 114 (span: 1x18.0m cg+1x60.m camel back truss girder+1x18.0m composite girder) at project chainage 80028 in badampahar yard in connection with construction of new line in between kendujhargarh - badampahar section under the jurisdiction of dy. ce/con/tata of s. e. railway.

Construction of road over bridge no: 114 (span: 1x18.0m cg+1x60.m camel back truss girder+1x18.0m composite girder) at project chainage 80028 in badampahar yard in connection with construction of new line in between kendujhargarh - badampahar section under the jurisdiction of dy. ce/con/tata of s. e. railway.

Read more
1)sbc-mys section: proposed construction of road under bridge as rcc box of size 1x9.0x4.5m (clear ht) in lieu of lc no.10 at km: 10/900-11/000 between kengeri & ramanagara stations 2)bangarpet - marikuppam section: proposed construction of road over bridge (1x36m composite girder + 2x20.0m c/c psc girder+7x20.0m c/c psc girder + re blocks) with approaches and subway (1x6mx2.75m (clear ht) rcc box) in lieu of lc no.7 at railway km 11/600-700 near ooragum railway station 3)bypl-dmm section:

1)sbc-mys section: proposed construction of road under bridge as rcc box of size 1x9.0x4.5m (clear ht) in lieu of lc no.10 at km: 10/900-11/000 between kengeri & ramanagara stations 2)bangarpet - marikuppam section: proposed construction of road over bridge (1x36m composite girder + 2x20.0m c/c psc girder+7x20.0m c/c psc girder + re blocks) with approaches and subway (1x6mx2.75m (clear ht) rcc box) in lieu of lc no.7 at railway km 11/600-700 near ooragum railway station 3)bypl-dmm section:

Read more
Construction of new bg railway line from ch: 273+500 between gyaspurkhedi (including) to ch: 346+162 dr. ambedkar nagar (excluding)(72.66 kms) stations including civil engineering works (earthworks, bridges, viaducts, tunnels, buildings, etc.), track works, signalling & telecommunication works, overhead electrification, electrical general services & all other allied works in connection with manmad to dr. ambedkar nagar (mhow) new bg rail link project in the state of madhya pradesh"

Construction of new bg railway line from ch: 273+500 between gyaspurkhedi (including) to ch: 346+162 dr. ambedkar nagar (excluding)(72.66 kms) stations including civil engineering works (earthworks, bridges, viaducts, tunnels, buildings, etc.), track works, signalling & telecommunication works, overhead electrification, electrical general services & all other allied works in connection with manmad to dr. ambedkar nagar (mhow) new bg rail link project in the state of madhya pradesh"

Read more
Engineering procurement and construction (epc) for construction of new line work between including earth work, blanketing, minor bridges, major bridges, robs, lhs/rubs, track works, platform work, station building, fobs, other buildings and associated miscellaneous civil engineering works for 25t indian railway standard loading from bikramshila (incl) to katareah (incl) from ch. 0.50 km to 24.274 km with shivnarayanpur to shivnarayanpur y-link from ch. km 1.10 to 2.933 km and katareah y-

Engineering procurement and construction (epc) for construction of new line work between including earth work, blanketing, minor bridges, major bridges, robs, lhs/rubs, track works, platform work, station building, fobs, other buildings and associated miscellaneous civil engineering works for 25t indian railway standard loading from bikramshila (incl) to katareah (incl) from ch. 0.50 km to 24.274 km with shivnarayanpur to shivnarayanpur y-link from ch. km 1.10 to 2.933 km and katareah y-

Read more
Construction of foundation, substructure and superstructure of important bridge no. 18 comprising 4 x 30.5 m + 3 x 45.70 m + 2 x 30.50 m + 2 x 45.70 m + 4 x 30.50 m open web girder spans, including pile foundation and 800 m approaches, for single-line railway track conforming to rdso 25 t axle load standard and substructure designed for 32.5 t loading over river barakar between barakar and kumardubi stations from km 229/30 to km 230/16 (f/hwh), of eastern railway

Construction of foundation, substructure and superstructure of important bridge no. 18 comprising 4 x 30.5 m + 3 x 45.70 m + 2 x 30.50 m + 2 x 45.70 m + 4 x 30.50 m open web girder spans, including pile foundation and 800 m approaches, for single-line railway track conforming to rdso 25 t axle load standard and substructure designed for 32.5 t loading over river barakar between barakar and kumardubi stations from km 229/30 to km 230/16 (f/hwh), of eastern railway

Read more
Construction of new railway line between deshalpar - hajipir - luna (82.38kms) (including all yards falling in the section) covering all works of earthwork, blanketing, retaining wall, toe wall, side drain, construction of major bridges, minor bridges, rub/lhs all p. way works (including laying and linking), supply of all types of sleepers, p. way fittings (excluding rails, steel girder), other civil engineering works, signal, telecom and electrical (general services and trd) complete works i

Construction of new railway line between deshalpar - hajipir - luna (82.38kms) (including all yards falling in the section) covering all works of earthwork, blanketing, retaining wall, toe wall, side drain, construction of major bridges, minor bridges, rub/lhs all p. way works (including laying and linking), supply of all types of sleepers, p. way fittings (excluding rails, steel girder), other civil engineering works, signal, telecom and electrical (general services and trd) complete works i

Read more
Construction of new railway line between vayor - lakhpat (including all yards falling in the section) covering all works of earthwork, blanketing, retaining wall, toe wall, side drain, construction of major bridges, minor bridges, rub/lhs all p. way works (including laying and linking), supply of all types of sleepers, p. way fittings (excluding rails, steel girder), other civil engineering works, signal, telecom and electrical (general services and trd) complete works in ahmedabad division

Construction of new railway line between vayor - lakhpat (including all yards falling in the section) covering all works of earthwork, blanketing, retaining wall, toe wall, side drain, construction of major bridges, minor bridges, rub/lhs all p. way works (including laying and linking), supply of all types of sleepers, p. way fittings (excluding rails, steel girder), other civil engineering works, signal, telecom and electrical (general services and trd) complete works in ahmedabad division

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise