Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Jeypore Nabarangpur New Bg Railway Line Project: Design & Construction Of New Bg Railway Line Between Ambaguda(excluding) (13.60 Km) To Nabarangpur(including) (43.996 Km) Involving Earthwork In Formation In Embankment/Cutting, Blanketing, Side Drains, Catch Water Drains, Minor Bridges, Major Bridges(excluding Bridge No. 85 At Km. 37.080 I.E. Indravati Bridge), Road Over Bridges (Ro Bs), Road Under Bridges (Ru Bs), Protection Works, P.Way Track Works With Contractor S Own Material Suppl
|
| Description |
Jeypore Nabarangpur New Bg Railway Line Project: Design & Construction Of New Bg Railway Line Between Ambaguda(excluding) (13.60 Km) To Nabarangpur(including) (43.996 Km) Involving Earthwork In Formation In Embankment/Cutting, Blanketing, Side Drains, Catch Water Drains, Minor Bridges, Major Bridges(excluding Bridge No. 85 At Km. 37.080 I.E. Indravati Bridge), Road Over Bridges (Ro Bs), Road Under Bridges (Ru Bs), Protection Works, P.Way Track Works With Contractor S Own Material Suppl
|
| Organisation | Ministry of Railways |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link | Login to view |
| Start Date | September 10, 2026 02:15 |
| End Date |
Open
10/11/2026
26 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Const. of cc rd frm indore naka to station bridge via ganesh mandir chouraha, sugar factory chouraha, lunia chourha,railway bridge 2 lane with paved shoulder frm ch.0 to 1.700 l 1.70 km n 4 lane with paved shoulder frm ch.1.800 to 4.300 l.2.50 km
Const. of cc rd frm indore naka to station bridge via ganesh mandir chouraha, sugar factory chouraha, lunia chourha,railway bridge 2 lane with paved shoulder frm ch.0 to 1.700 l 1.70 km n 4 lane with paved shoulder frm ch.1.800 to 4.300 l.2.50 km
Read moreMahagama - pirpainti new rail line: execution of civil, p-way, electrification, signal and telecom works for construction of new rail line between mahagama station (excluding) and pirpainti station (excluding) from km 60.000 to km 92.100 in connection with pirpainti-jasidih new bg rail line project of eastern railway.
Mahagama - pirpainti new rail line: execution of civil, p-way, electrification, signal and telecom works for construction of new rail line between mahagama station (excluding) and pirpainti station (excluding) from km 60.000 to km 92.100 in connection with pirpainti-jasidih new bg rail line project of eastern railway.
Read moreEngineering, procurement and construction (epc) agreement for construction of new bg rail line including earth work, blanketing, minor bridges, major bridges, track works, station building, buildings and other miscellaneous works for 25t indian railway standard loading from sitamarhi (excluding) to rewasi (including) (i.e.ch. 0.700 to 12.400) (total length = 11.70km) in connection with sitamarhi-sheohar new bg rail line project in east central railway in the state of bihar
Engineering, procurement and construction (epc) agreement for construction of new bg rail line including earth work, blanketing, minor bridges, major bridges, track works, station building, buildings and other miscellaneous works for 25t indian railway standard loading from sitamarhi (excluding) to rewasi (including) (i.e.ch. 0.700 to 12.400) (total length = 11.70km) in connection with sitamarhi-sheohar new bg rail line project in east central railway in the state of bihar
Read moreEngineering, procurement and construction (epc) agreement for construction of 3rd and 4th railway line (ghaziabad-new moradabad) adjacent to the existing broad gauge (bg) electrified double line including detour portions with civil engineering works, track works, signalling & telecommunication works, over head electrification, electrical general services & all other allied works between ghaziabad (gzb)(ch: 145.710km)(excluding) to new moradabad (nmb)(excluding) (ch:0.850km) as per appr
Engineering, procurement and construction (epc) agreement for construction of 3rd and 4th railway line (ghaziabad-new moradabad) adjacent to the existing broad gauge (bg) electrified double line including detour portions with civil engineering works, track works, signalling & telecommunication works, over head electrification, electrical general services & all other allied works between ghaziabad (gzb)(ch: 145.710km)(excluding) to new moradabad (nmb)(excluding) (ch:0.850km) as per appr
Read moreRockfall protection, slope stabilization and debris flow protection alongwith other associated miscellaneous works for vulnerable locations from kheraund (excluding) to major bridge 108 (excluding ) and km. 41.500 to 42.220 (on left side in increasing chainage direction) & km. 41.710 to 41.900 (on right side in increasing chainage direction) in connection with new bg line between tilaiya to koderma under the jurisdiction of dy.ce/construction/ dhanbad
Rockfall protection, slope stabilization and debris flow protection alongwith other associated miscellaneous works for vulnerable locations from kheraund (excluding) to major bridge 108 (excluding ) and km. 41.500 to 42.220 (on left side in increasing chainage direction) & km. 41.710 to 41.900 (on right side in increasing chainage direction) in connection with new bg line between tilaiya to koderma under the jurisdiction of dy.ce/construction/ dhanbad
Read moreConstruction of new bg railway line from ch: 273+500 between gyaspurkhedi (including) to ch: 346+162 dr. ambedkar nagar (excluding)(72.66 kms) stations including civil engineering works (earthworks, bridges, viaducts, tunnels, buildings, etc.), track works, signalling & telecommunication works, overhead electrification, electrical general services & all other allied works in connection with manmad to dr. ambedkar nagar (mhow) new bg rail link project in the state of madhya pradesh"
Construction of new bg railway line from ch: 273+500 between gyaspurkhedi (including) to ch: 346+162 dr. ambedkar nagar (excluding)(72.66 kms) stations including civil engineering works (earthworks, bridges, viaducts, tunnels, buildings, etc.), track works, signalling & telecommunication works, overhead electrification, electrical general services & all other allied works in connection with manmad to dr. ambedkar nagar (mhow) new bg rail link project in the state of madhya pradesh"
Read moreConstruction of 4th bg line from itarsi (km 745.130) to bina (km 982.130) including earthwork, tunnels, bridges, road over bridge (rob), road under bridge (rub), station buildings, track works, electrification, signaling & telecommunication works, and allied miscellaneous works in connection with itarsi - bina 4th line project under west central railway in the state of madhya pradesh.
Construction of 4th bg line from itarsi (km 745.130) to bina (km 982.130) including earthwork, tunnels, bridges, road over bridge (rob), road under bridge (rub), station buildings, track works, electrification, signaling & telecommunication works, and allied miscellaneous works in connection with itarsi - bina 4th line project under west central railway in the state of madhya pradesh.
Read moreConstruction of 4th line track work in between gamharia-chandil (excluding yards) including earthwork, blanketing, major bridges (bridge nos. 329, 334 & 335 for both 3rd & 4th line), road over bridge (6b), road under bridge, minor bridges, lc work and other miscellaneous works for 32.5t indian railway standard loading, execution of indoor & outdoor s&t works, execution of general electrical works, installation and commissioning of 2x25 kv overhead equipment (ohe) for traction
Construction of 4th line track work in between gamharia-chandil (excluding yards) including earthwork, blanketing, major bridges (bridge nos. 329, 334 & 335 for both 3rd & 4th line), road over bridge (6b), road under bridge, minor bridges, lc work and other miscellaneous works for 32.5t indian railway standard loading, execution of indoor & outdoor s&t works, execution of general electrical works, installation and commissioning of 2x25 kv overhead equipment (ohe) for traction
Read moreConstruction of new bg double line from balodabazar (km 110.500) to parmalkasa (km 280.840) and y-connectivities from lakholi station and marauda y cabin including earthwork, bridges, rail over rail (ror) bridge , road over bridge (rob), road under bridge (rub), station buildings, track works, electrification, signaling &telecommunication works, and allied miscellaneous works in connection with kharsia- naya raipur-parmalkasa 5th & 6th line project under south east central railway in t
Construction of new bg double line from balodabazar (km 110.500) to parmalkasa (km 280.840) and y-connectivities from lakholi station and marauda y cabin including earthwork, bridges, rail over rail (ror) bridge , road over bridge (rob), road under bridge (rub), station buildings, track works, electrification, signaling &telecommunication works, and allied miscellaneous works in connection with kharsia- naya raipur-parmalkasa 5th & 6th line project under south east central railway in t
Read moreConstruction of new railway bg line in km 28/970 to 42/040 in between kulthana including and rajpura stations including earthwork, minor bridges (03 nos) and major bridges (07 nos), station buildings, tunnels (7 nos) and mega bridge ( 03 nos) in connection with ratlam mhow khandwa gauge conversion in the state of madhya pradesh
Construction of new railway bg line in km 28/970 to 42/040 in between kulthana including and rajpura stations including earthwork, minor bridges (03 nos) and major bridges (07 nos), station buildings, tunnels (7 nos) and mega bridge ( 03 nos) in connection with ratlam mhow khandwa gauge conversion in the state of madhya pradesh
Read moreof your Industry type