Tender Details
About Tender
๐ Invitation For Bids: Jeypore Malkangiri New Railway Line Project ๐ The Ministry Of Railways, Central Government, Invites Bids From Experienced Contractors For The Construction Of The New Broad Gauge (Bg) Railway Line Between Jeypore And Malkangiri. This Project Spans From 0.85 Km From The Charged Section Block (Csb) To A Total Length Of 41.5 Km And Includes A Variety Of Civil And Track Works Such As: ๐๏ธ Earthwork In Formation, Embankment, And Cutting ๐ฑ Blanketing, Side Drains, And Catchwater Drains ๐ Minor Bridges, Major Bridges, Road Over Bridges (Ro Bs), And Road Under Bridges (Ru Bs) ๐ก๏ธ Protection Works And P.Way Track Works ๐ ๏ธ Supply Of Materials Including Track Ballast, New Wide Based Pre Stressed Concrete (Psc) Sleepers, And Special Psc Sleepers For Turnouts And Improvements Bid Submission Deadline: 30/05/2024, 12:00 Pm Earnest Money Deposit (Emd): Inr 20,00,000/ Interested Contractors Should Review The Complete Tender Documents For Detailed Specifications, Pricing, And Project Requirements. Keywords: Jeypore Malkangiri New Railway Line, Railway Line Construction, Ministry Of Railways, Central Government, Civil Works, Track Works, Pre Stressed Concrete Sleepers, Tender, Bid Submission, Earnest Money DepositParticulars | Details |
---|---|
Title |
Jeypore Malkangiri New Railway Line Project: Construction Of New Bg Railway Line Between Jeypore (0.85 Km From Csb) To 41.5 Km Involving Earthwork In Formation In Embankment/Cutting, Blanketing, Side Drains, Catch Water Drains, Minor Bridges, Major Bridges, Road Over Bridges (Ro Bs), Road Under Bridges (Ru Bs), Protection Works, P.Way Track Works With Contractor S Own Material Supplies Including Supply Of Track Ballast, New Wide Based Psc Sleepers, Special Psc Sleepers (For Turnouts, Impro
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 73321719 |
Reference Number |
EPC-CECONJDB2024005 |
Tender Fee | 0 |
EMD | 2 Crore |
Tender Value | |
Place | Bhubaneswar |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/052024/73321719/viewNitPdf_4466234.pdf |
Start Date | January 30, 2024 21:44 |
End Date |
30/05/2024 ( Expired 325 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Civil works incl earthwork for railway formation, blanketing, minor,major bridges,rubs and ror works of ror line urga..in constr of..single railway line for cerl phase from urga (km 0.00) to dharamjaygarh (km 62.00) in chhattisgarh over secr
Civil works incl earthwork for railway formation, blanketing, minor,major bridges,rubs and ror works of ror line urga..in constr of..single railway line for cerl phase from urga (km 0.00) to dharamjaygarh (km 62.00) in chhattisgarh over secr
Read moreExecution of earthwork in formation, construction of minor bridges, blanketing, p. way linking works including supply of p-way fittings, track ballast, psc sleeper and points and crossings in connection with construction of railway infrastructure for
Execution of earthwork in formation, construction of minor bridges, blanketing, p. way linking works including supply of p-way fittings, track ballast, psc sleeper and points and crossings in connection with construction of railway infrastructure for
Read moreRequest for proposal for jeypore -navarangpur new railway line project: construction of new bg railway line between ambaguda(excluding) (13.60 km) to navarangpur (including) (44.14 km) involving earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridges(excluding indravati bridge), road over bridges (robs), road under bridges (rubs), protection works, p.way track works with contractor s own material supplies including supply of
For complete deion and other details, please refer to tender
Read moreComposite work for earthwork in bank/cutting including blanketing material (for except major bridge locations), construction of minor bridges including rubs, supply of ballast, laying and linking of new bg rail line (including ajaygarh yard), transportation of sleepers & other p way material & misc. works between km 105.00 - km 110.00 of panna - khajuraho section of lalitpur singrauli new bg rail line project.
For complete deion and other details, please refer to tender
Read moreExecution of earthwork in formation by filling and cutting, blanketing, construction of minor bridges, side drain, central drain, catch water drain, protection work, p. way track linking work with ballast supply, construction of staff quarter, road work, platform work, circulating area, structural steel work for fob, metalizing work, transportation of p. way materials including other related works for the 4th line railway track between bagdehi at km: 493.373 (including yard) to dhutra (up to l
For complete deion and other details, please refer to tender
Read moreComposite work for earthwork in bank including blanketing material (for except major bridge locations), construction of minor bridges including rubs, supply of ballast, laying and linking of new bg rail line (including balupur yard), transportation of sleepers & other p way material & misc. works between km 110.00 - km 115.00 of panna - khajuraho section of lalitpur singrauli new bg rail line project.
For complete deion and other details, please refer to tender
Read moreLinking of new bg track on psc wider line sleeper including auxiliary track, trr by 10/20 rail panel, laying and linking of points & xings, sejs, l-xings, ion of pre-assembled turnouts, carriage of material including sleepers & rails, spreading of ballast etc., modification of existing track of station section and all other connected ancillary works as per requirement in between stations katihar (including) and mukuria (including) from ch: km 0.00 to km 35.30 in connection wit
For complete deion and other details, please refer to tender
Read moreConstruction of new line between bhimnath from ch.:0.00 m (existing km from adi :144.508) including ch. -1084.342 m to dholera logistic hub up to ch.:21501.869 m including y connection at bhimnath, covering all civil engineering works (i.e. earthwork, blanketing, side drains, retaining wall, trolley refuges, construction of all major / minor bridges, rubs / lhs, complete track works(laying and linking), tamping of track, destressing of lwrs, transportation of p.way materials, supply and sta
For complete deion and other details, please refer to tender
Read moreEarthwork in cutting and filling, blanketing, construction of minor bridges, major bridges, rub, rob, retaining wall, level crossing, side drain, catch water drain, p.way work and other ancillary works from ir ch. 205.000 km to 260.2 km between kalipahari (inc.) to pradhankhuta (exc.) in connection with construction of multi tracking railway bg line.
For complete deion and other details, please refer to tender
Read moreLinking of new bg track on psc wider line sleeper including auxiliary track, trr by 10/20 rail panel, laying and linking of points & xings, sejs, l-xings, ion of pre-assembled turnouts, carriage of material including sleepers & rails, spreading of ballast etc., modification of existing track of station section and all other connected ancillary works as per requirement in between stations katihar (including) and mukuria (including) from ch: km 0.00 to km 35.30 in connection wit
For complete deion and other details, please refer to tender
Read moreof your Industry type