Tender Details

Particulars Details
Title
Engineering Procurement And Construction (Epc) For Construction Of Doubling Work Including Earthwork, Blanketing, Minor Bridges, Major Bridges, Lhs/Ru Bs, Track Works, Platform Work, Station Building, Fo Bs, Other Buildings, Associated S&T And Electrical Utility Shifting Works And Associated Miscellaneous Works For 25 T Indian Railway Standard Loading From Karnauti Station(including Ch. 2.844 Km) To Bihar Sharif Station(excluding Ch 29.350 Km), From Ch. 1.900 Km To 28.192 Km (Total 2
Description
Engineering Procurement And Construction (Epc) For Construction Of Doubling Work Including Earthwork, Blanketing, Minor Bridges, Major Bridges, Lhs/Ru Bs, Track Works, Platform Work, Station Building, Fo Bs, Other Buildings, Associated S&T And Electrical Utility Shifting Works And Associated Miscellaneous Works For 25 T Indian Railway Standard Loading From Karnauti Station(including Ch. 2.844 Km) To Bihar Sharif Station(excluding Ch 29.350 Km), From Ch. 1.900 Km To 28.192 Km (Total 2
Organisation Ministry of Railways
Tender Id Login to view
Reference
Number
Login to view
Tender Fee -
EMD -
Tender Value -
Place
Link Login to view
Start Date September 02, 2026 01:10
End Date
Open 30/12/2026

76 days left

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Engineering procurement and construction (epc) for construction of new line work between including earth work, blanketing, minor bridges, major bridges, robs, lhs/rubs, track works, platform work, station building, fobs, other buildings and associated miscellaneous civil engineering works for 25t indian railway standard loading from bikramshila (incl) to katareah (incl) from ch. 0.50 km to 24.274 km with shivnarayanpur to shivnarayanpur y-link from ch. km 1.10 to 2.933 km and katareah y-

Engineering procurement and construction (epc) for construction of new line work between including earth work, blanketing, minor bridges, major bridges, robs, lhs/rubs, track works, platform work, station building, fobs, other buildings and associated miscellaneous civil engineering works for 25t indian railway standard loading from bikramshila (incl) to katareah (incl) from ch. 0.50 km to 24.274 km with shivnarayanpur to shivnarayanpur y-link from ch. km 1.10 to 2.933 km and katareah y-

Read more
Engineering, procurement and construction (epc) tender for construction of doubling work including earth work, blanketing, minor bridges, major bridges, utility shifting, station & other buildings, platform work, circulating area, lc work and other miscellaneous works for 25t indian railway standard loading from raxaul (excl.) to narkatiaganj (excl.) (i.e. ch.189.400 to 227.200) (total- 37.80 km) in connection with doubling of raxaul - narkatiaganj section in samastipur division of ea

Engineering, procurement and construction (epc) tender for construction of doubling work including earth work, blanketing, minor bridges, major bridges, utility shifting, station & other buildings, platform work, circulating area, lc work and other miscellaneous works for 25t indian railway standard loading from raxaul (excl.) to narkatiaganj (excl.) (i.e. ch.189.400 to 227.200) (total- 37.80 km) in connection with doubling of raxaul - narkatiaganj section in samastipur division of ea

Read more
Engineering, procurement and construction (epc) tender for construction of doubling work including earth work, blanketing, minor bridges, major bridges, station & other buildings, platform work, lc work and other miscellaneous works for 25t indian railway standard loading from kundawa chainpur (excl.) to raxaul (excl.) (i.e. ch. 145.500 to 186.540) (total 41.04 km) in connection with doubling of sitamarhi-raxaul section in samastipur division of east central railway

Engineering, procurement and construction (epc) tender for construction of doubling work including earth work, blanketing, minor bridges, major bridges, station & other buildings, platform work, lc work and other miscellaneous works for 25t indian railway standard loading from kundawa chainpur (excl.) to raxaul (excl.) (i.e. ch. 145.500 to 186.540) (total 41.04 km) in connection with doubling of sitamarhi-raxaul section in samastipur division of east central railway

Read more
Construction of 2nd new railway line (doubling works) between section kanalus(including) - okha (including) from km:853.36 to km:994.35 (including all yards and stations falling in the section) covering all works that are earthwork, blanketing, retaining wall, toe wall, side drain, construction of major bridges, minor bridges, rub/lhs, all p. way works (including laying and linking), supply of all types of sleepers, all p. way fittings, other civil engineering works, signal & telecommunica

Construction of 2nd new railway line (doubling works) between section kanalus(including) - okha (including) from km:853.36 to km:994.35 (including all yards and stations falling in the section) covering all works that are earthwork, blanketing, retaining wall, toe wall, side drain, construction of major bridges, minor bridges, rub/lhs, all p. way works (including laying and linking), supply of all types of sleepers, all p. way fittings, other civil engineering works, signal & telecommunica

Read more
Engineering procurement and construction (epc) of construction of viaducts, ror/rfo, major bridges, minor bridges, animal underpass, rub/lhs, tunnel/cut-cover, earthwork, blanketing, trolley refuge, turfing, buildings, retaining wall, toe wall etc. and other associated worksfor construction of new double line track for dfcc loading from ch.158.00 to ch.184 in koderma detour section in sonnagar-andal 3rd and 4th line project on epc mode in dhanbad division of east central railway.

Engineering procurement and construction (epc) of construction of viaducts, ror/rfo, major bridges, minor bridges, animal underpass, rub/lhs, tunnel/cut-cover, earthwork, blanketing, trolley refuge, turfing, buildings, retaining wall, toe wall etc. and other associated worksfor construction of new double line track for dfcc loading from ch.158.00 to ch.184 in koderma detour section in sonnagar-andal 3rd and 4th line project on epc mode in dhanbad division of east central railway.

Read more
Jeypore - nabarangpur new bg railway line project: design & construction of new bg railway line between ambaguda(excluding) (13.60 km) to nabarangpur(including) (43.996km) involving earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridges(excluding bridge no. 85 at km. 37.080 i.e. indravati bridge), road over bridges (robs), road under bridges (rubs), protection works, p.way track works with contractor s own material suppl

Jeypore - nabarangpur new bg railway line project: design & construction of new bg railway line between ambaguda(excluding) (13.60 km) to nabarangpur(including) (43.996km) involving earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridges(excluding bridge no. 85 at km. 37.080 i.e. indravati bridge), road over bridges (robs), road under bridges (rubs), protection works, p.way track works with contractor s own material suppl

Read more
Construction of new bg electrified double line from km 15.670 to km 38.750, including thangarghat (new), dhourabhantha (new) and bhalumuda (existing) yards and stations, involving earthwork in formation, bridges, robs, rubs, service buildings, staff quarters, p-way works (including supply of ballast and p-way materials except rails), 2 x 25 kv ohe, psi, plc, electrical general works, signalling & telecommunication works along with allied and associated miscellaneous works, in connection wi

Construction of new bg electrified double line from km 15.670 to km 38.750, including thangarghat (new), dhourabhantha (new) and bhalumuda (existing) yards and stations, involving earthwork in formation, bridges, robs, rubs, service buildings, staff quarters, p-way works (including supply of ballast and p-way materials except rails), 2 x 25 kv ohe, psi, plc, electrical general works, signalling & telecommunication works along with allied and associated miscellaneous works, in connection wi

Read more
Construction of new bg electrified double line from km 15.670 to km 38.750, including thangarghat (new), dhourabhantha (new) and bhalumuda (existing) yards and stations, involving earthwork in formation, bridges, robs, rubs, service buildings, staff quarters, p-way works (including supply of ballast and p-way materials except rails), 2 x 25 kv ohe, psi, plc, electrical general works, signalling & telecommunication works along with allied and associated miscellaneous works, in connection wi

Construction of new bg electrified double line from km 15.670 to km 38.750, including thangarghat (new), dhourabhantha (new) and bhalumuda (existing) yards and stations, involving earthwork in formation, bridges, robs, rubs, service buildings, staff quarters, p-way works (including supply of ballast and p-way materials except rails), 2 x 25 kv ohe, psi, plc, electrical general works, signalling & telecommunication works along with allied and associated miscellaneous works, in connection wi

Read more
Construction of new railway line between deshalpar - hajipir - luna (82.38kms) (including all yards falling in the section) covering all works of earthwork, blanketing, retaining wall, toe wall, side drain, construction of major bridges, minor bridges, rub/lhs all p. way works (including laying and linking), supply of all types of sleepers, p. way fittings (excluding rails, steel girder), other civil engineering works, signal, telecom and electrical (general services and trd) complete works i

Construction of new railway line between deshalpar - hajipir - luna (82.38kms) (including all yards falling in the section) covering all works of earthwork, blanketing, retaining wall, toe wall, side drain, construction of major bridges, minor bridges, rub/lhs all p. way works (including laying and linking), supply of all types of sleepers, p. way fittings (excluding rails, steel girder), other civil engineering works, signal, telecom and electrical (general services and trd) complete works i

Read more
Construction of new railway line between vayor - lakhpat (including all yards falling in the section) covering all works of earthwork, blanketing, retaining wall, toe wall, side drain, construction of major bridges, minor bridges, rub/lhs all p. way works (including laying and linking), supply of all types of sleepers, p. way fittings (excluding rails, steel girder), other civil engineering works, signal, telecom and electrical (general services and trd) complete works in ahmedabad division

Construction of new railway line between vayor - lakhpat (including all yards falling in the section) covering all works of earthwork, blanketing, retaining wall, toe wall, side drain, construction of major bridges, minor bridges, rub/lhs all p. way works (including laying and linking), supply of all types of sleepers, p. way fittings (excluding rails, steel girder), other civil engineering works, signal, telecom and electrical (general services and trd) complete works in ahmedabad division

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise