Tender Details
Particulars | Details |
---|---|
Title |
Difference Type Of Work In Business Plan 2024 25 In The Area Of Edd Dibai.
|
Description |
Difference Type Of Work In Business Plan 2024 25 In The Area Of Edd Dibai.
|
Organisation | Paschimanchal Vidyut Vitran Nigam Ltd. | State Govt. and UT |
Tender Id | 2024_PVVNL_926073_1 |
Reference Number |
11/EDC-III/B/2024-2025 |
Tender Fee | 3540 |
EMD | 51000 |
Tender Value | |
Place | BULANDSHAHR |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1599517 |
Start Date | June 03, 2024 22:30 |
End Date |
28/06/2024 ( Expired 329 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)
Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)
Read moreConstruction of married accommodation of type-iii 04 qtrs (double storied), type-iv 04 qtrs (double storied) and cmi room at hq ce (p) sewak complex at dimapur in nagaland state under epc mode
Construction of married accommodation of type-iii 04 qtrs (double storied), type-iv 04 qtrs (double storied) and cmi room at hq ce (p) sewak complex at dimapur in nagaland state under epc mode
Read moreConstruction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Read moreWidening re construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24
Widening re construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreDesign, construction,supply, installation and commissioning of package type sewage treatment plant (based on mbr technology) within power plant area of bokaro thermal power station on epc basis
Design, construction,supply, installation and commissioning of package type sewage treatment plant (based on mbr technology) within power plant area of bokaro thermal power station on epc basis
Read moreDevelopment of women workers hostel in kalibeti industrial area, khordha, odisha
Development of women workers hostel in kalibeti industrial area, khordha, odisha.
Read moreThe work of raising the street and constructing the drainage and interlocking and interlocking repair from khalid house in bhadasa nayapura through rizwaah, munmun, and sukhnan shah mosque to nazir neta house.
The work of raising the street and constructing the drainage and interlocking and interlocking repair from khalid house in bhadasa nayapura through rizwaah, munmun, and sukhnan shah mosque to nazir neta house.
Read moreRoutine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreof your Industry type