Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repairs And Strengthening Of Existing Internal Roads At Dragline Yard, Sub Station At Ocp Iii, Rg Ii Area
|
| Description |
Repairs And Strengthening Of Existing Internal Roads At Dragline Yard, Sub Station, Ocp Iii, Rg Ii Area, Godavarikhani, Dist Peddapalli, Telangana State. (Invited Under Earmarked Works Sccl Registered Contractors Belong To St Community Are Eligible To Participate.)
|
| Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
| Tender Id | 615827 |
|
Reference Number |
RG2/CVL/ET-52/2025-26 |
| Tender Fee | 439 |
| EMD | 15600 |
| Tender Value | - |
| Place | TS |
| Link |
View Original Tender Notice
http://eprocurement.telangana.gov.in/ |
| Start Date | July 25, 2025 21:30 |
| End Date |
Expired
08/08/2025
Expired 388 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repairs to existing drains in cnc rg-iii area
Repairs to existing drains in cnc rg-iii area
Read moreRepairs to existing drains in centenary colony, rg-iii area.
Repairs to existing drains in centenary colony, rg-iii area.
Read moreResurfacing of existing internal roads and drains at stores, rg ii area
Resurfacing of existing internal roads and providing side drains at rg.i old stores, rg.ii area, godavarikhani, peddapalli dist, telangana state.
Read moreMaintenance and repair works to existing structures at ocp-iii stores (rg.1 old stores) at rg-ii area
Maintenance and repair works to existing structures at ocp-iii stores (rg.1 old stores) at rg-ii area, godavarikhani, dist.peddapalli, telangana state.
Read moreObr work at rg ocp-iii mine (phase-ii), rg-ii area.
Drilling, excavation, loading, transportation, dumping, spreading levelling, etc., of 602.58 lbcm of in-situ ob (which includes 4.08 lbcm of top soil, 569.92 lbcm of hard ob 28.58 lbcm of coal) and re-handling of 15.28 lcm of top soil with conventional equipment and additional works viz., 3,000 rmt of drilling at rg ocp-iii mine (phase-ii), rg-ii area during a period of 36 months.
Read moreMaintenance and repair works to existing structures at ocp-iii stores (rg.1 old stores)
Maintenance and repair works to existing structures at ocp-iii stores (rg.1 old stores) at rg-ii area, godavarikhani, dist: peddapalli, ts
Read moreRehabilitation and special repairs to the existing concrete structure of 16000 mt gl bunker at ocp-iii chp, rg-ii area, godavarikhani
Rehabilitation and special repairs to the existing concrete structure of 16000 mt gl bunker (comprising of 3 chambers) at ocp-iii chp, rg-ii area, godavarikhani, peddapalli dist, and telangana state.
Read moreRepairs and miscellaneous works to existing canteen at krushibhavan, ocp-iii
Repairs misc. works to existing canteen at krushibhavan, ocp-iii, rg-ii area, godavarikhani, dist. peddapalli, telangana state.
Read moreRepairs to damaged compoundwall around ocp-i stores rgocm-i rg-iii area godhavarikhani peddapalli telangana
Repairs to damaged compoundwall around ocp-i stores rgocm-i rg-iii area godhavarikhani peddapalli telangana
Read moreRepairs to existing bore wells in centenary colony rg iii area godhavarikhani peddapalli telangana
Repairs to existing bore wells in centenary colony rg iii area godhavarikhani peddapalli telangana
Read moreof your Industry type