| Particulars | Details |
|---|---|
| Title |
Obr Work At Rg Ocp Iii Mine (Phase Ii), Rg Ii Area.
|
| Description |
Drilling, Excavation, Loading, Transportation, Dumping, Spreading Levelling, Etc., Of 602.58 Lbcm Of In Situ Ob (Which Includes 4.08 Lbcm Of Top Soil, 569.92 Lbcm Of Hard Ob 28.58 Lbcm Of Coal) And Re Handling Of 15.28 Lcm Of Top Soil With Conventional Equipment And Additional Works Viz., 3,000 Rmt Of Drilling At Rg Ocp Iii Mine (Phase Ii), Rg Ii Area During A Period Of 36 Months.
|
| Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
| Tender Id | 500605 |
|
Reference Number |
E1123O0359 |
| Tender Fee | 29500 |
| EMD | 1 Crore |
| Tender Value | - |
| Place | TS |
| Link |
View Original Tender Notice
http://eprocurement.telangana.gov.in/ |
| Start Date | March 05, 2024 20:30 |
| End Date |
Expired
12/03/2024
Expired 921 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Design, supply and installation of single deck cage for man winding engine at sk mine, mm area
Design, supply and installation of single deck cage for man winding engine at sk mine, mm area
Read moreHiring of tyre mounted backhoe loader (0.24 cu.m backhoe bucket, 1cum loader bucket) for a period of 2 years for use at goleti ocp, bellampalli area
Hiring of tyre mounted backhoe loader (0.24 cu.m backhoe bucket, 1cum loader bucket) for a period of 2 years for use at goleti ocp, bellampalli area
Read moreRepair/replacement of u/s lt ug cable and connected works for area-i and ii at mil stn talbehat
Repair/replacement of u/s lt ug cable and connected works for area-i and ii at mil stn talbehat
Read moreSupply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.
Supply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.
Read moreEstablishment, commissioning of 6.0mld regional combined sewage & effluent treatment facility (rcsetf) civil/common infrastructure installed treatment machinery zero liquid discharge (zld) on turnkey basis including operation & maintenance of entire plant for a period of 5 years at mundargi 4th phase industrial area, ballari district.
Establishment, commissioning of 6.0mld regional combined sewage & effluent treatment facility (rcsetf) civil/common infrastructure installed treatment machinery zero liquid discharge (zld) on turnkey basis including operation & maintenance of entire plant for a period of 5 years at mundargi 4th phase industrial area, ballari district.
Read moreSupply, erection, testing and commissioning of (i) erection of 220kv dc line(37km) from 220/132kv ss sadashivpet to m/s. zaheerabad nimz ltd.(ii) 2nos 220kv bay extensions at 220/132kv ss sadhashivpet and (iii) 2nos 220kv bay extensions and 1no. metering bay at m/s. zaheerabad nimz ltd on turnkey basis.
Supply, erection, testing and commissioning of (i) erection of 220kv dc line(37km) from 220/132kv ss sadashivpet to m/s. zaheerabad nimz ltd.(ii) 2nos 220kv bay extensions at 220/132kv ss sadhashivpet and (iii) 2nos 220kv bay extensions and 1no. metering bay at m/s. zaheerabad nimz ltd on turnkey basis.
Read moreLaying of bt road at sri balaji kiranam to hno 1040 road no 15 , joythi chicken centre 22-661 road no 11,praveen glass aert to sddagonis nilyam road no 14, hn o 22-9/s part to ganga bhavani medical store road no 3 and road no 12 sri manikanta kgs shop to sri ramalingeshwara temple at vinayakahills phase-ii in nadargul division no 57, badangpet circle-16 (recall)
Laying of bt road at sri balaji kiranam to hno 1040 road no 15 , joythi chicken centre 22-661 road no 11,praveen glass aert to sddagonis nilyam road no 14, hn o 22-9/s part to ganga bhavani medical store road no 3 and road no 12 sri manikanta kgs shop to sri ramalingeshwara temple at vinayakahills phase-ii in nadargul division no 57, badangpet circle-16 (recall)
Read moreSupply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.
Read moreConstruction of bridge / hlb on i) allapur to arutla x-road (via) thumbai thanda, kadilabavi thanda at km 1/6-8, km 3/8-10, km 6/4-6, ii) gudi malkapur to chelmada (via) kothulapuram, survail, lingamvari gudem, saigoni bavi at km 3/4-6, km 4/0-2, km 4/4-6, km 5/6-8, km 7/8-10, km 9/0-2, km 9/2-4, km 10/8-10, km 11/2-4, km 12/2-4, iii) lachammagudem to anthampet at km 2/8-10, survail to palivela (via) mallareddy gudem at km 6/2-4, km 7/0-2, km 7/4-6, km 8/8-10 (2 nos), km 11/0-2, km 11/6-8, iv) n
Construction of bridge / hlb on i) allapur to arutla x-road (via) thumbai thanda, kadilabavi thanda at km 1/6-8, km 3/8-10, km 6/4-6, ii) gudi malkapur to chelmada (via) kothulapuram, survail, lingamvari gudem, saigoni bavi at km 3/4-6, km 4/0-2, km 4/4-6, km 5/6-8, km 7/8-10, km 9/0-2, km 9/2-4, km 10/8-10, km 11/2-4, km 12/2-4, iii) lachammagudem to anthampet at km 2/8-10, survail to palivela (via) mallareddy gudem at km 6/2-4, km 7/0-2, km 7/4-6, km 8/8-10 (2 nos), km 11/0-2, km 11/6-8, iv) nh-65 to narayanpur (via) koyalagudem, d.nagaram, peepalpahad, allapur, venkambai thanda at km 3/0-2, km 3/8-10, km 8/2-4, km 10/2-4, km 11/0-2, km 16/0-2 in yadadri-bhongir district.
Read moreObr work at rg oc-ii extension project, rg-iii area
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 673.56 lbcm of in-situ ob (which includes 5.60 lbcm of top soil, 657.02 lbcm of hard ob and 10.94 lbcm of coal) with conventional equipment, and additional works viz., 1500 shovel hours, 1500 dozer hours and 1,10,000 rmt of drilling at rg oc-ii extension project, rg-iii area during a period of 36 months.
Read moreof your Industry type