Tender Details
Particulars | Details |
---|---|
Title |
Hydraulic Pinion Extractor Of Capacity 40000 Psi With 2 Meter Length
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 106450352 |
Reference Number |
33245288 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | Kolkata |
Link | https://www.ireps.gov.in/ireps/supply/pdfdocs/092024/106450352/viewNitPdf_4689048.pdf |
Start Date | August 22, 2024 22:58 |
End Date |
02/09/2024 ( Expired 253 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Read moreRehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km
Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km
Read moreConstruction of nh353 j stretch from chandur bazarnaka to junctionwith nh 548 c (jasi rani chowk) in paratwada achalpur city to four lane with paved shoulder configuration on epc basis in the state of maharashtra length 6.19 km).
Construction of nh353 j stretch from chandur bazarnaka to junctionwith nh 548 c (jasi rani chowk) in paratwada achalpur city to four lane with paved shoulder configuration on epc basis in the state of maharashtra length 6.19 km).
Read moreUpgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Read moreDesign, supply, fabrication and warranty of 2-high reversible hot rolling mill along with hydraulic
Read more
Heavy duty hydraulic open die forging press of capacity 3000 ton integrated with two rail bound manipulators
Heavy duty hydraulic open die forging press of capacity 3000 ton integrated with two rail bound manipulators
Read moreSupply of 19730 nos of non-vrs pressure type dus suitable for dispensing ms / hsd with 2 years warranty and 8 years camc
Supply of 19730 nos of non-vrs pressure type dus suitable for dispensing ms / hsd with 2 years warranty and 8 years camc.
Read moreRehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme
Rehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme
Read moreRehabilitation and up-gradation to two lane with paved shoulder configuration from km 67.100 to 67.885, km 76.100 to 77.060, km 80.450 to 81.520, km 82.000 to 82.230, km 82.400 to 82.610 and km 96.840 to 98.095 on balance length of 4.51 km long katol
Rehabilitation and up-gradation to two lane with paved shoulder configuration from km 67.100 to 67.885, km 76.100 to 77.060, km 80.450 to 81.520, km 82.000 to 82.230, km 82.400 to 82.610 and km 96.840 to 98.095 on balance length of 4.51 km long katol
Read moreContractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Read moreof your Industry type