Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of A Two Lane Secondary Service Road Along Uer Ii Within The Available Ro W In The State Of Delhi On Epc Mode.
|
| Description |
Construction Of A Two Lane Secondary Service Road Along Uer Ii Within The Available Ro W In The State Of Delhi On Epc Mode.
|
| Organisation | National Highways Authority of India | RO-Delhi - NHAI |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | 20000 |
| EMD | 1.21 Crore |
| Tender Value | 121.57 Crore |
| Place | |
| Link | Login to view |
| Start Date | September 16, 2026 17:10 |
| End Date |
Closing soon
15/10/2026
0 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Upgradation and reconstruction of khandwa-mundi road (sh-70) from km 00 to km 31.275 two lane with paved shoulder in the state of madhya pradesh on epc mode.
Upgradation and reconstruction of khandwa-mundi road (sh-70) from km 00 to km 31.275 two lane with paved shoulder in the state of madhya pradesh on epc mode.
Read moreConstruction of bypasses at sheikhpura and khaira along with 1 no. of realignment at sikandra to two lane with paved shoulders standard on n.h. 333a under epc mode in state of bihar (job no. nh-333a-2022-23-br-58).
Construction of bypasses at sheikhpura and khaira along with 1 no. of realignment at sikandra to two lane with paved shoulders standard on n.h. 333a under epc mode in state of bihar (job no. nh-333a-2022-23-br-58).
Read moreConstruction of the lonar bypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Construction of the lonarbypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Read moreUpgradation of chitrod-rapar-balasar section of nh-927c to two-lane with paved shoulders from design km 0.00 to km 57.848 in the state of gujarat on epc mode.
Upgradation of chitrod-rapar-balasar section of nh-927c to two-lane with paved shoulders from design km 0.00 to km 57.848 in the state of gujarat on epc mode.
Read moreConstruction of 4 lane mukundra bypass on kota-jhalawar section of nh-52 in the state of rajasthan on epc mode.
Construction of 4 lane mukundra bypass on kota-jhalawar section of nh-52 in the state of rajasthan on epc mode.
Read moreRehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km
Rehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km
Read moreUpgradation to four lane carriageway with paved shoulders of the nagaur city left out stretch in the state of rajasthan on epc mode
Upgradation to four lane carriageway with paved shoulders of the nagaur city left out stretch in the state of rajasthan on epc mode
Read moreConsultancy services for authoritys engineer for upgradation of chitrod-rapar-balasar section of nh-927c to two-lane with paved shoulders from design km 0.00 to km 57.848 in the state of gujarat on epc mode
Consultancy services for authoritys engineer for upgradation of chitrod-rapar-balasar section of nh-927c to two-lane with paved shoulders from design km 0.00 to km 57.848 in the state of gujarat on epc mode
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreConstruction of 2 lane bridge at km 21.206 and km 26.983 at bargarh district on nh-26 in the state of odisha under epc mode
Construction of 2 lane bridge at km 21.206 and km 26.983 at bargarh district on nh-26 in the state of odisha under epc mode
Read moreof your Industry type