Tender Details

Particulars Details
Title
Cleaning And Washing Of Pcc Poles And Rail Pole Structure And Other Iron Materials By Wire Brush To Make Them Smooth. All Pcc Poles And Foundation Plinth Are To Be Painted.
Description
Cleaning And Washing Of Pcc Poles And Rail Pole Structure And Other Iron Materials By Wire Brush To Make Them Smooth. All Pcc Poles And Foundation Plinth Above Ground Level Are To Be Painted .
Organisation WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD | State Govt. and UT
Tender Id 2025_WBSED_940667_1
Reference
Number
DMTD/E-TENDER/ PAINT MATANGINI SS/2025-2026/11 DT 06.11.2025
Tender Fee 0
EMD 6416
Tender Value -
Place Matangini 33 by 11 KV substation
Link
View Original Tender Notice

https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2224900

Start Date November 07, 2025 19:30
End Date
Expired 28/11/2025

Expired 320 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed

Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Read more
Cleaning and washing of pcc poles and rail pole structure and other iron materials by wire brush to make them smooth. all pcc poles and foundation plinth above ground level are to be painted

Cleaning and washing of pcc poles and rail pole structure and other iron materials by wire brush to make them smooth. all pcc poles and foundation plinth above ground level are to be painted

Read more
Cleaning and washing of pcc poles and rail pole structure and other iron materials by wire brush to make them smooth. all pcc poles and foundation plinth above ground level are to be painted

Cleaning and washing of pcc poles and rail pole structure and other iron materials by wire brush to make them smooth. all pcc poles and foundation plinth above ground level are to be painted with two coat of cement primer and two coat of final paint

Read more
Work for replacement of damaged stp and pcc poles pin insulator stay earthing plinth etc. works of line strengthening under bp 2025-26 in the area of edd jaunpur nagar.

Work for replacement of damaged stp and pcc poles pin insulator stay earthing plinth etc. works of line strengthening under bp 2025-26 in the area of edd jaunpur nagar.

Read more
Earth filling of borrow pit and construction of paver block road 300m approximately, plinth, foundation and dwarf wall to suit ch 20 e 2000 or any other equivalent drilling rig outfit at kmc 3 plinth for drilling loc. kuat. all materials are to be supplied by the contractor except cement

Earth filling of borrow pit and construction of paver block road 300m approximately, plinth, foundation and dwarf wall to suit ch 20 e 2000 or any other equivalent drilling rig outfit at kmc 3 plinth for drilling loc. kuat. all materials are to be supplied by the contractor except cement

Read more
Labour charges for providing foundation plinth for all structure and equipments, supply fabrication and erection of rsj poles for enhancement of 230/110kv auto transformer capacity from 3x 50mva to 2x100mva (second unit) at 230/110kv karaikudi ss

Labour charges for providing foundation plinth for all structure and equipments, supply fabrication and erection of rsj poles for enhancement of 230/110kv auto transformer capacity from 3x 50mva to 2x100mva (second unit) at 230/110kv karaikudi ss

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise