| Particulars | Details |
|---|---|
| Title |
Cleaning And Washing Of Pcc Poles And Rail Pole Structure And Other Iron Materials By Wire Brush To Make Them Smooth. All Pcc Poles And Foundation Plinth Above Ground Level Are To Be Painted
|
| Description |
Cleaning And Washing Of Pcc Poles And Rail Pole Structure And Other Iron Materials By Wire Brush To Make Them Smooth. All Pcc Poles And Foundation Plinth Above Ground Level Are To Be Painted
|
| Organisation | WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD | State Govt. and UT |
| Tender Id | 2025_WBSED_938719_1 |
|
Reference Number |
DMTD/E-TENDER/PAINT BERABERIA/2025-2026/09 dt 04.11.2025 |
| Tender Fee | 0 |
| EMD | 7306 |
| Tender Value | - |
| Place | BERABERIA 33 BY 11 KV SUBSTATION |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2216132 |
| Start Date | November 06, 2025 19:30 |
| End Date |
Expired
24/11/2025
Expired 325 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Dismantling existing wall,excavation upto 1.5,excavation below 1.5,pcc for footing base 1 is to 4 is to 8,rcc below plinth footing and pillar and beam,rcc above plinth pillar,brick mason wall av plinth,pcc on top of bw,plaster 18mm thick,two coat cement primer,two coat cement paint,slogan writing letters 300 mm,steel reinforcement for rcc,concertina fencing removal and refixing,jcb related work,brick masonry drain,plaster 12 mm thick
Dismantling existing wall,excavation upto 1.5,excavation below 1.5,pcc for footing base 1 is to 4 is to 8,rcc below plinth footing and pillar and beam,rcc above plinth pillar,brick mason wall av plinth,pcc on top of bw,plaster 18mm thick,two coat cement primer,two coat cement paint,slogan writing letters 300 mm,steel reinforcement for rcc,concertina fencing removal and refixing,jcb related work,brick masonry drain,plaster 12 mm thick
Read moreEarth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Read moreSupply of structure bonds (other than platform) fabricated from ms flat steel of size 40x6 mm with smooth edges, length 3.5 metres and above, complete with gi nuts, bolts and washers of size 16x50x38 mm, duly painted with one coat of red oxide primer and finished with black paint, as per rdso drawing no. eti/ohe/p/7000 mod-f or latest
Supply of structure bonds (other than platform) fabricated from ms flat steel of size 40x6 mm with smooth edges, length 3.5 metres and above, complete with gi nuts, bolts and washers of size 16x50x38 mm, duly painted with one coat of red oxide primer and finished with black paint, as per rdso drawing no. eti/ohe/p/7000 mod-f or latest
Read moreCarriage of condemned wheelsets from various locations of indian railways to rail wheel factory, yelahanka, bangalore, karnataka-560064, under the distance slab of above 500kms & up to a lead distance of 1000kms, by road. loading and unloading by railways is free of cost. note: mandatory documents should be submitted in compliance of: bid security condition, power of attorney, iba certification, annexure xviii. undertaking letter to the effect that all the documents submitted by them along
Carriage of condemned wheelsets from various locations of indian railways to rail wheel factory, yelahanka, bangalore, karnataka-560064, under the distance slab of above 500kms & up to a lead distance of 1000kms, by road. loading and unloading by railways is free of cost. note: mandatory documents should be submitted in compliance of: bid security condition, power of attorney, iba certification, annexure xviii. undertaking letter to the effect that all the documents submitted by them along
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreCleaning and washing of pcc poles and rail pole structure and other iron materials by wire brush to make them smooth. all pcc poles and foundation plinth above ground level are to be painted
Cleaning and washing of pcc poles and rail pole structure and other iron materials by wire brush to make them smooth. all pcc poles and foundation plinth above ground level are to be painted with two coat of cement primer and two coat of final paint
Read moreCleaning and washing of pcc poles and rail pole structure and other iron materials by wire brush to make them smooth. all pcc poles and foundation plinth are to be painted.
Cleaning and washing of pcc poles and rail pole structure and other iron materials by wire brush to make them smooth. all pcc poles and foundation plinth above ground level are to be painted .
Read morePlinth work 42 feet x 12 feet x 01 feet with foundation filing of 01 feet,electrical light poles 12
Read more
Construction of general civil works like dismantling rcc foundation, brick, pcc etc, excavation, pcc, reinforcement, shuttering, rcc, backfilling, finishing works, etc. for installation of 2x100 mt above ground bullet at silchar bp, assam
Construction of general civil works like dismantling rcc foundation, brick, pcc etc, excavation, pcc, reinforcement, shuttering, rcc, backfilling, finishing works, etc. for installation of 2x100 mt above ground bullet at silchar bp, assam