Tender Details

Particulars Details
Title
In View Of The Increasing Traffic Pressure In Meerut Metropolis In The Financial Year 2023 24 Construction Work Of The Link Road To Connect Baghpat Road With Railway Road
Description
In View Of The Increasing Traffic Pressure In Meerut Metropolis In The Financial Year 2023 24 Construction Work Of The Link Road To Connect Baghpat Road With Railway Road
Organisation Cheif Engineer Meerut Zone PWD Meerut | State Govt. and UT
Tender Id 2024_CEMRT_902347_1
Reference
Number
308/11Cashier-MC PD Meerut Dt 27-01-24
Tender Fee 2714
EMD 9.56 Lakh
Tender Value
Place EE PD PWD MEERUT
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1554144
Start Date February 22, 2024 14:30
End Date

29/02/2024 ( Expired 474 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Read more
Road safety works on nh709b epe crossing to of shamli bypass nh334b meerut to haryana border via baghpat nh709ad panipat-shamli-muzaffarnagar in the state of uttar pradesh and haryana

Road safety works on nh709b epe crossing to of shamli bypass nh334b meerut to haryana border via baghpat nh709ad panipat-shamli-muzaffarnagar in the state of uttar pradesh and haryana

Read more
Construction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.

Construction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.

Read more
Construction and up- gradation to two lane with paved shoulder in km 98.160 to 105.330 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-2) in the state of chhattisgarh.

Construction and up- gradation to two lane with paved shoulder in km 98.160 to 105.330 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-2) in the state of chhattisgarh.

Read more
Construction and up-gradation to two lane with paved shoulder in km 90.990 to 98.160 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-1) in the state of chhattisgarh.

Construction and up-gradation to two lane with paved shoulder in km 90.990 to 98.160 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-1) in the state of chhattisgarh.

Read more
Construction work of c.c. road from tomar printing press shop to the corner of chitnis chowk garden in ward number 25

Construction work of c.c. road from tomar printing press shop to the corner of chitnis chowk garden in ward number 25

Read more
Construction work of m-30 c.c road and rcc drain on both side of the road from anand thakur house to govind rajak house in suhagi under ward number 77

Construction work of m-30 c.c road and rcc drain on both side of the road from anand thakur house to govind rajak house in suhagi under ward number 77

Read more
Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.

Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.

Read more
Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode

Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode

Read more
Consultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km

Consultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise