Tender Details
Particulars | Details |
---|---|
Title |
Ch To Scheme For Cost Of Land And Site Development For 33 11 Kv Sub Station Control Points Taken In Ddugjy And Ipds Scheme Scheme Code 12862
|
Description |
Additional Estimate For Balance Civil Work Of Development Of Site, Construction Of Approach Road And Cost Of Land For 33/11 Kv, 1 X1.6 Mva Sub Station At Bahu Under Esd Hpsebl Banjar In Distt.Kullu 33/11 Kv1 X1.6 Mva Sub Station At Bahu Uesd Banjar.
|
Organisation | HPSEBL | State Govt. and UT |
Tender Id | 2024_HPSEB_93831_1 |
Reference Number |
HPSEBL/OCK/C-9/NIT-25/2024-25 |
Tender Fee | 1180 |
EMD | 29700 |
Tender Value | |
Place | Bahu (Mohini) |
Link | https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=138186 |
Start Date | October 03, 2024 19:30 |
End Date |
14/10/2024 ( Expired 236 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Appointment of issuing bank for a letter of credit
Invitation to act as issuing bank for an aggregate/portfolio letter of credit (lc) to cover three sub-projects, such lc backstopped by a guarantee from the international bank for reconstruction and development (ibrd) to support the sngrbp
Read moreConsultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Read moreIndependent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Read moreConsultancy services for preparation of dpr and land acquisition of vasmat city bypass road on nh61 connecting to nh61 km 60.00 to km 75.400 in vasmat taluka district hingoli in the state of maharashtra on epc mode. tentative length 17.50 km
Consultancy services for preparation of dpr and land acquisition of vasmat city bypass road on nh61 connecting to nh61 km 60.00 to km 75.400 in vasmat taluka district hingoli in the state of maharashtra on epc mode. tentative length 17.50 km
Read moreConsultancy services for preparation of dpr and land acquisition of gangakhed city bypass 4lane ps configuration road on nh361f connecting to nh361f km at 17.650 to km 33.400 and nh 752k in gangakhed taluka district parbhani in the state of maharas
Consultancy services for preparation of dpr and land acquisition of gangakhed city bypass 4lane ps configuration road on nh361f connecting to nh361f km at 17.650 to km 33.400 and nh 752k in gangakhed taluka district parbhani in the state of maharas
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreConstruction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Construction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Read moreConsultancy services for preparation of feasibility study for development of multi modal logistic park and detailed project reports for external trunk connectivity infrastructure to the multi modal logistic park site at visakhapatnam
Consultancy services for preparation of feasibility study for development of multi modal logistic park and detailed project reports for external trunk connectivity infrastructure to the multi modal logistic park site at visakhapatnam
Read moreSelection of agency for door to door collection segregation of municipal solid waste from each establishment and transportation to the processing site
Selection of agency for door to door collection segregation of municipal solid waste from each establishment and transportation to the processing site in mc punhana
Read moreChief minister urban infrastructure development scheme fourth phase cc road construction work from akajhiri road to kali mata in ward number 01 and cc road and drain construction from pichore road to the houses of bunty pal gopal kalla khalak
Chief minister urban infrastructure development scheme fourth phase cc road construction work from akajhiri road to kali mata in ward number 01 and cc road and drain construction from pichore road to the houses of bunty pal gopal kalla khalak
Read moreof your Industry type