Tender Details
Particulars | Details |
---|---|
Title |
Estimate For Laying U/G Rcc Pipeline For Outlet At Rd 56941/R Of Phull Disty
|
Description |
Estimate For Laying U/G Rcc Pipeline For Outlet At Rd 56941/R Of Phull Disty
|
Organisation | Department of Water Resources | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 7900 |
EMD | 1.3 Lakh |
Tender Value | |
Place | Bathinda |
Link |
AAAAAAAAAA Login to view |
Start Date | April 07, 2025 21:00 |
End Date |
23/04/2025 ( 3 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Slope stabilisation of banks of indus river at nimu military station under station hq nimu for a length of 236.00m under 81 rcc/ 16 brtf (p) vijayak in ladakh (ut) on epc mode
Slope stabilisation of banks of indus river at nimu military station under station hq nimu for a length of 236.00m under 81 rcc/ 16 brtf (p) vijayak in ladakh (ut) on epc mode
Read moreDesign and constr of 35 m span psc maj pmt br with open foundation over thangeni nallah incl proof check and ssi report at km 72 pt 550 on sktt rd under 94 rcc 38 brtf rd of project deepak in hp state
Design and constr of 35 m span psc maj pmt br with open foundation over thangeni nallah incl proof check and ssi report at km 72 pt 550 on sktt rd under 94 rcc 38 brtf rd of project deepak in hp state
Read moreSs of stone aggregate 40 mm comma 20 mm comma 10 mm and coarse river sand for constr of pmt work bet km 0 pt 00 to km 22 pt 500 0 pt 00 considered at sumdo on sumdo murmi dogri rd under 108 rcc 759 brtf of project deepak in hp state
Ss of stone aggregate 40 mm comma 20 mm comma 10 mm and coarse river sand for constr of pmt work bet km 0 pt 00 to km 22 pt 500 0 pt 00 considered at sumdo on sumdo murmi dogri rd under 108 rcc 759 brtf of project deepak in hp state
Read moreDesign and execution for construction of 400 m length avalanche protection system at km 5.550 to km 5.660, km 7.900 to km 7.950, km 27.200 to km 27.280, km 28.370 to km 28.460 and km 29.200 to km 29.270 on d-s rd i.e. approach road to shinkunla tnl
Design and execution for construction of 400 m length avalanche protection system at km 5.550 to km 5.660, km 7.900 to km 7.950, km 27.200 to km 27.280, km 28.370 to km 28.460 and km 29.200 to km 29.270 on d-s rd i.e. approach road to shinkunla tnl
Read moreFor the financial year 2025-26 rod / ring repair (making) of sluice valve of 3 inch, 4 inch, 5 inch, 6 inch, 8 inch, 10 inch, 12 inch pipeline located at different places of the city
For the financial year 2025-26 rod / ring repair (making) of sluice valve of 3 inch, 4 inch, 5 inch, 6 inch, 8 inch, 10 inch, 12 inch pipeline located at different places of the city
Read moreLaying of additional di and hdpe pipeline, construction of sluice valve chamber and other works at dimdima (zone-i and ii) pwss under alipurduar division, phe dte.
Laying of additional di and hdpe pipeline, construction of sluice valve chamber and other works at dimdima (zone-i and ii) pwss under alipurduar division, phe dte.
Read moreProviding, laying, jointing, testing and commissioning of 200 mm d.i. pipeline and interconnection work all allied civil works at seema suraksha bal bijasan tekri of zone no.16 ward no.15 (as per schedule)
Providing, laying, jointing, testing and commissioning of 200 mm d.i. pipeline and interconnection work all allied civil works at seema suraksha bal bijasan tekri of zone no.16 ward no.15 (as per schedule)
Read morePlc of 200 mm crmb 60 mm dbm and 40 mm bc incl cleaning of road surface and applying pc comma tc and rd marking for surf wks bet km 0 to km 7 net length 7 km on pt 4840 high ground bl rd under 108 rcc 759 brtf of project deepak in hp
Plc of 200 mm crmb 60 mm dbm and 40 mm bc incl cleaning of road surface and applying pc comma tc and rd marking for surf wks bet km 0 to km 7 net length 7 km on pt 4840 high ground bl rd under 108 rcc 759 brtf of project deepak in hp
Read moreRepair/ renovation/ extension/ maintenance of field channel/ drains at work site gaggarwal to happat lab phase-1st in village bamnoo for a length of 200 mts. from rd 00-200 -- project sangarwani -- estimated cost rs. 636700 --
Repair/ renovation/ extension/ maintenance of field channel/ drains at work site gaggarwal to happat lab phase-1st in village bamnoo for a length of 200 mts. from rd 00-200 -- project sangarwani -- estimated cost rs. 636700 --
Read moreGe i r and d/chd-99/2024-25 provision of fire escape for main office bldg and rain protection shed at main gate of tbrl sector-30 chandigarh and development of centralized exhibition/display center and provision of covered shed for pathway from manth
Provision of fire escape for main office bldg and rain protection shed at main gate of tbrl sector-30 chandigarh and development of centralized exhibition/display center and provision of covered shed for pathway from manthan auditorium side entrance
Read moreof your Industry type