Tender Details

Particulars Details
Title
Btps
Description
Hp And Lp Welding Works For Replacement Of Damaged Valves Bends And Pipes Etc In Units 1 And 2 Of Tm From 01 04 2024 Or From The Actual Date Of Commencement Of Work To The 31 03 2025
Organisation Information Technology Electronics and Communication Department Telangana | State Govt. and UT
Tender Id 511997
Reference
Number
e-67/2023-24 of CE/Const/BTPS (Stg-I)
Tender Fee 205
EMD 8700
Tender Value -
Place TS
Link
View Original Tender Notice

http://eprocurement.telangana.gov.in/

Start Date March 23, 2024 01:30
End Date
Expired 02/04/2024

Expired 929 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Repairing, servicing and painting of different lp valves of tm dept,bktps

Repairing, servicing and painting of different lp valves of tm dept,bktps

Read more
Mtps i tm unit ii replacing the defective eroded drip line reducers expanders changing the defective eroded plug broken 1 and 2 drain line and vent line valves pipes bends by ibr and non ibr welding transporting the variable load hanger etc

Mtps i tm unit ii replacing the defective eroded drip line reducers expanders changing the defective eroded plug broken 1 and 2 drain line and vent line valves pipes bends by ibr and non ibr welding transporting the variable load hanger etc

Read more
Supply of filter elements for lp bypass hpsu and lp bypass actuator filters in tm divisions of units-i and ii of stage-i/ytps.

Supply of filter elements for lp bypass hpsu and lp bypass actuator filters in tm divisions of units-i and ii of stage-i/ytps.

Read more
New making /repairing of priming pipe inter connection system with fitting of new gi pipes, union, bends, elbows, brass valves, threading setting and welding etc in 6nos. delivery ranges at damagoria colliery under cv area

New making /repairing of priming pipe inter connection system with fitting of new gi pipes, union, bends, elbows, brass valves, threading setting and welding etc in 6nos. delivery ranges at damagoria colliery under cv area

Read more
Mtps i tm unit ii complete overhauling of hp bypass and lp bypass spray valves and oil supply unit during aoh 2026 2027

Mtps i tm unit ii complete overhauling of hp bypass and lp bypass spray valves and oil supply unit during aoh 2026 2027

Read more
Custom bid for services - overhauling servicing of hp lp valves safety valves and actuators including replacement of hp drip drain line pipes of unit no 10 3x200mw btps obra sonebhadra

Custom bid for services - overhauling servicing of hp lp valves safety valves and actuators including replacement of hp drip drain line pipes of unit no 10 3x200mw btps obra sonebhadra

Read more
Tggenco - rts-b- providing of insurance coverage for the operational, non-operational and store items and obsolete spares and burglary including theft policy for plant assets of 1x62.5 mw- rts-b unit, ramagundam for a period of one year from the actual date of commencement of insurance coverage

Tggenco - rts-b- providing of insurance coverage for the operational, non-operational and store items and obsolete spares and burglary including theft policy for plant assets of 1x62.5 mw- rts-b unit, ramagundam for a period of one year from the actual date of commencement of insurance coverage

Read more
Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027

Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027

Read more
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esv iv and hpt ipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2026 27 as and when required

Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esv iv and hpt ipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2026 27 as and when required

Read more
Replacement of different hp valves, pipes, bends and reducer under tm department during overhauling of unit#3

Replacement of different hp valves, pipes, bends and reducer under tm department during overhauling of unit#3

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise