Tender Details
About Tender
🏅 Procurement Opportunity: Cryotherapy Chamber Equipment For Sai Ns Nis Patiala 🧊 The Sports Authority Of India, Under The Central Government Ministry/Department, Is Seeking Bids For The Procurement Of Cryotherapy Chamber Equipment, Inclusive Of A 3 Year Comprehensive Annual Maintenance Contract (Camc), For The Physiotherapy Department At Sai Ns Nis Patiala. 📅 Bid Submission Deadline: May 27, 2024, 5:00 Pm A Tender Fee Of Inr 190,000/ Is Applicable. Interested Bidders Should Provide Detailed Technical Specifications, Pricing, And Maintenance Plans To Meet The High Standards Required For This Specialized Equipment. Keywords: Cryotherapy Chamber Equipment, Sai Ns Nis Patiala, Sports Authority Of India, Physiotherapy, Camc, Government Procurement, Tender, BidParticulars | Details |
---|---|
Title |
Procurement Of Cryotherapy Chamber Equipment Including 3 Year Camc For Physiotherapy Department Of Sai Ns Nis Patiala
|
Description |
Procurement Of Cryotherapy Chamber Equipment Including 3 Year Camc For Physiotherapy Department Of Sai Ns Nis Patiala
|
Organisation | Sports Authority of India | Central Govt. Ministry/Department |
Tender Id | 2024_SAI_788848_1 |
Reference Number |
09-06012/6/2023-RC NS NIS Patiala-FOSS Division |
Tender Fee | 0 |
EMD | 1.9 Lakh |
Tender Value | |
Place | SAI NS NIS Patiala |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=849049 |
Start Date | May 17, 2024 23:30 |
End Date |
27/05/2024 ( Expired 378 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
E-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026
E-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026
Read moreUpgradation of muktsar-abohar road via panniwala (mktodr-32) rd 0.00-19.20, 28.00-37.70 equal to 28.90 km including maintenance of road for 3 year (1 year defect liability period plus 2 year maintenance period)
Upgradation of muktsar-abohar road via panniwala (mktodr-32) rd 0.00-19.20, 28.00-37.70 equal to 28.90 km including maintenance of road for 3 year (1 year defect liability period plus 2 year maintenance period)
Read moreSopd_g_24_25_42 construction of road cum embankment on left bank of dikrong river (nh-15 at bahanibari to sissapathar bridge approach) (part -3. from ch. 15140.00 to 18400.00m) including approach roads under sopd-g for the year 2024-25
Sopd_g_24_25_42 construction of road cum embankment on left bank of dikrong river (nh-15 at bahanibari to sissapathar bridge approach) (part -3. from ch. 15140.00 to 18400.00m) including approach roads under sopd-g for the year 2024-25
Read moreConstruction of 3 (three) unit cwsn toilets under chawmanu, durgachawmuhani and ambassa block of dhalai district under pm shri scheme for the year 2024-25
Construction of 3 (three) unit cwsn toilets under chawmanu, durgachawmuhani and ambassa block of dhalai district under pm shri scheme for the year 2024-25
Read moreSpecial repair of various link roads falling in m.c. patti distt. tarn taran for the year 2022-23 2023-24 and 2024-2025 (gr.no.3)
Special repair of various link roads falling in m.c. patti distt. tarn taran for the year 2022-23 2023-24 and 2024-2025 (gr.no.3)
Read moreMajor repair of 3 (three) nos. school under silachari, kakraban and matabari block, gomati district for the year 2024-25 under under pm shri scheme
Major repair of 3 (three) nos. school under silachari, kakraban and matabari block, gomati district for the year 2024-25 under under pm shri scheme
Read moreArresting the leakages / seepages in the main plant buildings and underground structures of kaiga generating station 3 and 4
Arresting the leakages / seepages in the main plant buildings and underground structures of kaiga generating station 3 and 4, kaiga for the year 2025-27.
Read moreArm of substation and feeder pillars at 51st bn itbp patiala punjab for the year 2025 26
Arm of substation and feeder pillars at 51st bn itbp patiala punjab for the year 2025 26
Read moreConstruction / strengthening of mrf / composting plant under sbm (urban) 2.0 in kurwai
Construction / strengthening of mrf / composting plant under sbm (urban) 2.0 in kurwai
Read moreAnnual rate contract (arc 3 years) for procurement of liquid nitrogen (ln2) gas for halt hass chamber facility at icat centre-ii manesar (haryana)
Annual rate contract (arc 3 years) for procurement of liquid nitrogen (ln2) gas for halt hass chamber facility at icat centre-ii manesar (haryana)
Read moreof your Industry type