Tender Details
Particulars | Details |
---|---|
Title |
Construction Of 3 (Three) Unit Cwsn Toilets Under Chawmanu, Durgachawmuhani And Ambassa Block Of Dhalai District Under Pm Shri Scheme For The Year 2024 25
|
Description |
Construction Of 3 (Three) Unit Cwsn Toilets Under Chawmanu, Durgachawmuhani And Ambassa Block Of Dhalai District Under Pm Shri Scheme For The Year 2024 25
|
Organisation | Director - Directorate of Secondary Education | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 1000 |
EMD | 19800 |
Tender Value | |
Place | Ambassa, Dhalai |
Link |
AAAAAAAAAA Login to view |
Start Date | June 06, 2025 00:25 |
End Date |
26/06/2025 ( 19 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Appointment of issuing bank for a letter of credit
Invitation to act as issuing bank for an aggregate/portfolio letter of credit (lc) to cover three sub-projects, such lc backstopped by a guarantee from the international bank for reconstruction and development (ibrd) to support the sngrbp
Read moreConstruction of underground s/s for town planning scheme (t.p.1, 2, 3 and 4) of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Construction of underground s/s for town planning scheme (t.p.1, 2, 3 and 4) of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Read moreImplementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Implementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Read moreSupply, delivery, fandi, dismantling, installation and commissioning of control and relay panel and its associated cables as per ts for upgradation of powergrid feeders that has served more than 25 years feeders at other sebs - nerts under add cap 2024-29 block
Supply, delivery, fandi, dismantling, installation and commissioning of control and relay panel and its associated cables as per ts for upgradation of powergrid feeders that has served more than 25 years feeders at other sebs - nerts under add cap 2024-29 block
Read moreConstruction of critical care block at district hospital rupnagar under pm abhim scheme
Construction of critical care block at district hospital rupnagar under pm abhim scheme
Read moreCa no cwe/amb/north-71 of 2024-25 construction of infrastructure for lab under pm shri kendriya vidyalaya no 01 at ambala cantt
Ca no cwe/amb/north-71 of 2024-25 construction of infrastructure for lab under pm shri kendriya vidyalaya no 01 at ambala cantt
Read moreRequest for proposal for design, engineering, supply, construction, erection, testing, commissioning of 10 mw ac and operate and maintain for 25 years solar pv power project on annuity payment basis linked to monthly unit generation
Request for proposal for design, engineering, supply, construction, erection, testing, commissioning of 10 mw ac and operate and maintain for 25 years solar pv power project on annuity payment basis linked to monthly unit generation
Read moreConstruction of hl rcc bridge (5x26.50m) in km 19 (kinjer) of nh 33 (old nh 110, km 71) in the district of arwal in the state of bihar for the year 2024 25 under nh divison gaya on epc mode.
Construction of hl rcc bridge (5x26.50m) in km 19 (kinjer) of nh 33 (old nh 110, km 71) in the district of arwal in the state of bihar for the year 2024 25 under nh divison gaya on epc mode.
Read moreRepairs to flooring skirting dado and other misc br work at certain bldgs of banaswadi grn under age br meg of ge north bangalore
Repairs to flooring skirting dado and other misc br work at certain bldgs of banaswadi grn under age br meg of ge north bangalore
Read moreSopd_g_24_25_40 construction of road cum embankment on left bank of dikrong river (nh 15 at bahanibari to sissapathar bridge approach)( part 2 from ch. 11880.00m to 15140.00m) including approach roads under sopd g for the year 2024-25
Sopd_g_24_25_40 construction of road cum embankment on left bank of dikrong river (nh 15 at bahanibari to sissapathar bridge approach)( part 2 from ch. 11880.00m to 15140.00m) including approach roads under sopd g for the year 2024-25
Read moreof your Industry type