Tender Details
Particulars | Details |
---|---|
Title |
Reservoir Rim Treatment Work Near Zang Village From Rd Plus Minus 1150 M Of Dam Axis To Rd Plus Minus 1600 M And Rd Plus Minus 615 M Of Dam Axis To Rd Plus Minus 625 M Upstream Of Dam Axis Of Teesta V Power Station.
|
Description |
Reservoir Rim Treatment Work Near Zang Village From Rd Plus Minus 1150 M Of Dam Axis To Rd Plus Minus 1600 M And Rd Plus Minus 615 M Of Dam Axis To Rd Plus Minus 625 M Upstream Of Dam Axis Of Teesta V Power Station.
|
Organisation | NHPC Limited | Central Govt. Ministry/Department |
Tender Id | 2025_NHPC_846276_1 |
Reference Number |
NH/TSV/Cont/CC-349/NIT-991 |
Tender Fee | 1770 |
EMD | 14.6 Lakh |
Tender Value | |
Place | Teesta V Dam Site samdong |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=889590 |
Start Date | January 27, 2025 22:30 |
End Date |
11/02/2025 ( Expired 70 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Protection work on left and right bank of river in various reaches/rds between downstream of dam to adit-i portal of uri-ii power station, jk
Protection work on left and right bank of river in various reaches/rds between downstream of dam to adit-i portal of uri-ii power station, jk
Read moreProtection to scoured bank on chitrotpala left from rd 5.690km to 5.790km near village nagaspur and improvement of gadas in between rd 15.800km to 16.500km on right embankment and from rd 1.800km to 3.350km on left embankment of river chitrotpala nea
Protection to scoured bank on chitrotpala left from rd 5.690km to 5.790km near village nagaspur and improvement of gadas in between rd 15.800km to 16.500km on right embankment and from rd 1.800km to 3.350km on left embankment of river chitrotpala nea
Read moreRepair of main access road from rd plus minus 550 m to rd plus minus 620 m at dam site of teesta v power station
Repair of main access road from rd plus minus 550 m to rd plus minus 620 m at dam site of teesta v power station
Read moreConstruction of c.c. road work in murlipura village located in ward no. 20 from gyanji ka marg plot no. 52 to plot no. 1a, the lane near sitaramji temple in murlipura village and the lane with plot no. 43, 44 in front of the temple.
Construction of c.c. road work in murlipura village located in ward no. 20 from gyanji ka marg plot no. 52 to plot no. 1a, the lane near sitaramji temple in murlipura village and the lane with plot no. 43, 44 in front of the temple.
Read moreVkv/2024/259 c/o geometrical improvement of road from main road to village rakharara hppwd division kotla behar and sub division dada siba(sh c/o r/wall from rd 0/460 to 0/478 with cc and wire crate) deposit work
Vkv/2024/259 c/o geometrical improvement of road from main road to village rakharara hppwd division kotla behar and sub division dada siba(sh c/o r/wall from rd 0/460 to 0/478 with cc and wire crate) deposit work
Read moreDismantling of unused 28 span of 440 v, 3 phase, 4 wire o/h line from silo/rls to 20 mw solar power plant construction site with fabrication and fixing of 02 nos. tubular pole make lighting tower and some related 440 v o/h line work at bahera durga m
Dismantling of unused 28 span of 440 v, 3 phase, 4 wire o/h line from silo/rls to 20 mw solar power plant construction site with fabrication and fixing of 02 nos. tubular pole make lighting tower and some related 440 v o/h line work at bahera durga m
Read moreRepairing work of road from rd 0 to 500 form tudka village to smashan bhumi and other work taluka kuhi, dist. nagpur
Repairing work of road from rd 0 to 500 form tudka village to smashan bhumi and other work taluka kuhi, dist. nagpur
Read moreReservoir rim treatment work at left bank area from rd plus minus 3000m of dam axis to rd plus minus 3200m upstream of dam axis below naya bazar food godown at dikchu north sikkim
Reservoir rim treatment work at left bank area from rd plus minus 3000m of dam axis to rd plus minus 3200m upstream of dam axis below naya bazar food godown at dikchu north sikkim
Read moreDr.nttps-om-civil-clearing the light jungle in road no. 1 4, abc road, water treatment plant, fire station, both sides of compound wall from new gate to budameru near cooling towers via old gate areas 220kv switch yard bays empty bays and cleaning of storage tanks and sludge pits of bcw pump house stage-iii during the year 2025-26.
Dr.nttps-om-civil-clearing the light jungle in road no. 1 4, abc road, water treatment plant, fire station, both sides of compound wall from new gate to budameru near cooling towers via old gate areas 220kv switch yard bays empty bays and cleaning of storage tanks and sludge pits of bcw pump house stage-iii during the year 2025-26.
Read moreAdditional work of shifting of ht, lt line with dtc which are in row of approach road of jigaon dam project near village jigaon, takli watpal, nimkarda, mandawa and adol tq. nandura dist buldhana (under jigaon project) and handed over to concern msed
Additional work of shifting of ht, lt line with dtc which are in row of approach road of jigaon dam project near village jigaon, takli watpal, nimkarda, mandawa and adol tq. nandura dist buldhana (under jigaon project) and handed over to concern msed
Read moreof your Industry type