Tender Details

Particulars Details
Title
Protection Work Of Upstream Approach Road From Rd Plus Minus 420 M To Rd Plus Minus 480 M (Left Bank) Upstream Of Dam Axis, Teesta V Power Station
Description
Protection Work Of Upstream Approach Road From Rd Plus Minus 420 M To Rd Plus Minus 480 M (Left Bank) Upstream Of Dam Axis, Teesta V Power Station
Organisation NHPC Limited | Central Govt. Ministry/Department
Tender Id 2025_NHPC_849414_1
Reference
Number
NH/TSV/Cont/CC-350/NIT-1001
Tender Fee 590
EMD 98000
Tender Value
Place Teesta V Dam Site
Link https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=892919
Start Date February 15, 2025 20:30
End Date

03/03/2025 ( Expired 97 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of bituminous road from railway crossing (penth bazaar) to mosque at harduaganj thermal power station, aligarh, uttar pradesh

Construction of bituminous road from railway crossing (penth bazaar) to mosque at harduaganj thermal power station, aligarh, uttar pradesh

Read more
Sopd_g_24_25_40 construction of road cum embankment on left bank of dikrong river (nh 15 at bahanibari to sissapathar bridge approach)( part 2 from ch. 11880.00m to 15140.00m) including approach roads under sopd g for the year 2024-25

Sopd_g_24_25_40 construction of road cum embankment on left bank of dikrong river (nh 15 at bahanibari to sissapathar bridge approach)( part 2 from ch. 11880.00m to 15140.00m) including approach roads under sopd g for the year 2024-25

Read more
Protection to scoured bank of ksdr embankment from rd.41.00 km to 41.50 km

Protection to scoured bank of ksdr embankment from rd.41.00 km to 41.50 km

Read more
Maintenance of road from mill chowmuhani to railbridge road via adjacent roads under pwd (rnb) kakraban sub-division/ sh protection work, earth filling, turfing,road marking etc with allied works during the year 2025-26

Maintenance of road from mill chowmuhani to railbridge road via adjacent roads under pwd (rnb) kakraban sub-division/ sh protection work, earth filling, turfing,road marking etc with allied works during the year 2025-26

Read more
Construction of temporary connecting road (left bank to song dam top) in upstream of song dam distt.- dehradun.

Construction of temporary connecting road (left bank to song dam top) in upstream of song dam distt.- dehradun.

Read more
Rfp for appointment of consultant for preparation of dpr to connect the krishna river right bank bund road (from the existing flood pumping station near undavalli) to the downstream of the right bank bund road (up to varadhi) in andhra pradesh

Request for proposal for appointment of consultant for preparation of detailed project report to connect the krishna river right bank bund road (from the existing flood pumping station near undavalli) to the downstream of the right bank bund road (up to varadhi) in andhra pradesh.

Read more
G e n e r a l - e m e r g e n c y m o n s o o n preparedness-side protection to kaitheri thodu in mangattidam panchayath.-urgent side protection work to damaged left bank of kaitheri thodu at d/s side of vcb in ward 8 of mangattidam grama panchayath,

Urgent side protection work to damaged left bank of&amp#x0d kaitheri thodu at d/s side of vcb in ward 8 of&amp#x0d mangattidam grama panchayath, mattannur&amp#x0d constituency, kannur district

Read more
Urgent mtc of road from burighat bridge to burighat market under dasda sub-division,pwd(rnb) during the year 2025-26/s.h construction of r.c.c protection wall (left side) and pucca drain etc.

Urgent mtc of road from burighat bridge to burighat market under dasda sub-division,pwd(rnb) during the year 2025-26/s.h construction of r.c.c protection wall (left side) and pucca drain etc.

Read more
Urgent mtc of road from burighat bazar to burighat bridge under dasda sub-division,pwd(rnb) during the year 2025-26/s.h construction of r.c.c protection wall(right side), pucca drain and approach slab etc.

Urgent mtc of road from burighat bazar to burighat bridge under dasda sub-division,pwd(rnb) during the year 2025-26/s.h construction of r.c.c protection wall(right side), pucca drain and approach slab etc.

Read more
Urgent mtc of road from burighat bridge to gachiram para (l-2.00km) under dasda sub-division,pwd(rnb) during the year 2025-26/s.h construction of r.c.c protection wall at bridge approach (left side).

Urgent mtc of road from burighat bridge to gachiram para (l-2.00km) under dasda sub-division,pwd(rnb) during the year 2025-26/s.h construction of r.c.c protection wall at bridge approach (left side).

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise