Tender Details

Particulars Details
Title
Niq.13/Eesm(c) I/ Bgpd/ Cpwd/2025
Description
C/O Stp Of 500 Kld For Existing Hostels, New Building Along With Sewer Line Connection Unfiltered Water Line Distribution An Drain Beside Stadium Including Operation For 6 Months Sh C/O Rcc Drain Beside Stadium (Balance Work)
Organisation Central Public Works Department (CPWD) | Central Govt. Ministry/Department
Tender Id 121633
Reference
Number
NIQ.13/EESM(C)-I/ BGPD/ CPWD/2025
Tender Fee 0
EMD 39518
Tender Value
Place
Link
View Original Tender Notice

https://etender.cpwd.gov.in/cppcpwdtenderview.html?tid=63707764246370776424313231363333244e49512e31332f454526534d2843292d492f20424750442f20435057442f32303235

Start Date August 01, 2025 00:12
End Date
Expired 04/08/2025

Expired 335 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Niq-08/eesm(c)-i/bgpd/2025-26 recall

Construction of new stp of 500 kld for existing hostels new building along with sewer line connection unfiltered water line distribution and drain beside stadium i/c operation for 6 months at iim, bodhgaya sh c/o drain beside stadium and slope reversal of existing drain from old hostel no.-4 to auditorium sitc of submersible sewerage pump etc sw balance work

Read more
Niq no.08/eesm(c)-i/bgpd/2025-26

Construction of new stp of 500 kld for existing hostels, new building along with sewer line connection , unfiltered water line distribution and rain beside stadium including operation for 6 months at iim bodhgaya sh c o drain beside stadium and slope reversal of existing drain from old hostel no 4 to auditorium sitc of submersible sewerage pump etc sw balance work

Read more
01/nit/sepd/bgpc/2025-26

C/o new stp of 500 kld for existing hostels, new building along with sewer line connection, unfiltered water line distribution and drain beside stadium including operation for 6 months at iim, bodhgaya sh: c/o drain beside stadium and slope reversal of existing drain from old hosted no 4 to auditorium sitc of submersible sewage pump etc.

Read more
C/o grid chamber, equalization tank, treated water tank for installing 120 kld stp for the two new hostels

C/o grid chamber, equalization tank, treated water tank for installing 120 kld stp for the two new hostels

Read more
C/o grid chamber, equalization tank, treated water tank for installing 120 kld stp for the two new hostels

C/o grid chamber, equalization tank, treated water tank for installing 120 kld stp for the two new hostels

Read more
C/o grid chamber, equalization tank, treated water tank for installing 120 kld stp for the two new hostels

C/o grid chamber, equalization tank, treated water tank for installing 120 kld stp for the two new hostels

Read more
Construction of mps along with o and m for 60 months, main sewerage scheme and construction of 2.00 mld capacity stp cum 6 kld fstp along with o and m for 60 months after stabilization at dhilwan town distt. kapurthala under sbm 2.0

Construction of mps along with o and m for 60 months, main sewerage scheme and construction of 2.00 mld capacity stp cum 6 kld fstp along with o and m for 60 months after stabilization at dhilwan town distt. kapurthala under sbm 2.0

Read more
Construction of mps along with o and m for 60 months, main sewerage scheme and construction of 2.00 mld capacity stp cum 6 kld fstp along with o and m for 60 months after stabilization at dhilwan town distt. kapurthala under sbm 2.0

Construction of mps along with o and m for 60 months, main sewerage scheme and construction of 2.00 mld capacity stp cum 6 kld fstp along with o and m for 60 months after stabilization at dhilwan town distt. kapurthala under sbm 2.0

Read more
Construction of mps along with o and m for 60 months, main sewerage scheme and construction of 2.00 mld capacity stp cum 6 kld fstp along with o and m for 60 months after stabilization at dhilwan town distt. kapurthala under sbm 2.0

Construction of mps along with o and m for 60 months, main sewerage scheme and construction of 2.00 mld capacity stp cum 6 kld fstp along with o and m for 60 months after stabilization at dhilwan town distt. kapurthala under sbm 2.0

Read more
Construction of mps along with o and m for 60 months, main sewerage scheme and construction of 2.00 mld capacity stp cum 6 kld fstp along with o and m for 60 months after stabilization at dhilwan town distt. kapurthala under sbm 2.0

Construction of mps along with o and m for 60 months, main sewerage scheme and construction of 2.00 mld capacity stp cum 6 kld fstp along with o and m for 60 months after stabilization at dhilwan town distt. kapurthala under sbm 2.0

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise