Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Niq.13/Eesm(c) I/ Bgpd/ Cpwd/2025
|
| Description |
C/O Stp Of 500 Kld For Existing Hostels, New Building Along With Sewer Line Connection Unfiltered Water Line Distribution An Drain Beside Stadium Including Operation For 6 Months Sh C/O Rcc Drain Beside Stadium (Balance Work)
|
| Organisation | Central Public Works Department (CPWD) | Central Govt. Ministry/Department |
| Tender Id | 121633 |
|
Reference Number |
NIQ.13/EESM(C)-I/ BGPD/ CPWD/2025 |
| Tender Fee | 0 |
| EMD | 39518 |
| Tender Value | |
| Place | |
| Link |
View Original Tender Notice
https://etender.cpwd.gov.in/cppcpwdtenderview.html?tid=63707764246370776424313231363333244e49512e31332f454526534d2843292d492f20424750442f20435057442f32303235 |
| Start Date | August 01, 2025 00:12 |
| End Date |
Expired
04/08/2025
Expired 335 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Niq-08/eesm(c)-i/bgpd/2025-26 recall
Construction of new stp of 500 kld for existing hostels new building along with sewer line connection unfiltered water line distribution and drain beside stadium i/c operation for 6 months at iim, bodhgaya sh c/o drain beside stadium and slope reversal of existing drain from old hostel no.-4 to auditorium sitc of submersible sewerage pump etc sw balance work
Read moreNiq no.08/eesm(c)-i/bgpd/2025-26
Construction of new stp of 500 kld for existing hostels, new building along with sewer line connection , unfiltered water line distribution and rain beside stadium including operation for 6 months at iim bodhgaya sh c o drain beside stadium and slope reversal of existing drain from old hostel no 4 to auditorium sitc of submersible sewerage pump etc sw balance work
Read more01/nit/sepd/bgpc/2025-26
C/o new stp of 500 kld for existing hostels, new building along with sewer line connection, unfiltered water line distribution and drain beside stadium including operation for 6 months at iim, bodhgaya sh: c/o drain beside stadium and slope reversal of existing drain from old hosted no 4 to auditorium sitc of submersible sewage pump etc.
Read moreC/o grid chamber, equalization tank, treated water tank for installing 120 kld stp for the two new hostels
C/o grid chamber, equalization tank, treated water tank for installing 120 kld stp for the two new hostels
Read moreC/o grid chamber, equalization tank, treated water tank for installing 120 kld stp for the two new hostels
C/o grid chamber, equalization tank, treated water tank for installing 120 kld stp for the two new hostels
Read moreC/o grid chamber, equalization tank, treated water tank for installing 120 kld stp for the two new hostels
C/o grid chamber, equalization tank, treated water tank for installing 120 kld stp for the two new hostels
Read moreConstruction of mps along with o and m for 60 months, main sewerage scheme and construction of 2.00 mld capacity stp cum 6 kld fstp along with o and m for 60 months after stabilization at dhilwan town distt. kapurthala under sbm 2.0
Construction of mps along with o and m for 60 months, main sewerage scheme and construction of 2.00 mld capacity stp cum 6 kld fstp along with o and m for 60 months after stabilization at dhilwan town distt. kapurthala under sbm 2.0
Read moreConstruction of mps along with o and m for 60 months, main sewerage scheme and construction of 2.00 mld capacity stp cum 6 kld fstp along with o and m for 60 months after stabilization at dhilwan town distt. kapurthala under sbm 2.0
Construction of mps along with o and m for 60 months, main sewerage scheme and construction of 2.00 mld capacity stp cum 6 kld fstp along with o and m for 60 months after stabilization at dhilwan town distt. kapurthala under sbm 2.0
Read moreConstruction of mps along with o and m for 60 months, main sewerage scheme and construction of 2.00 mld capacity stp cum 6 kld fstp along with o and m for 60 months after stabilization at dhilwan town distt. kapurthala under sbm 2.0
Construction of mps along with o and m for 60 months, main sewerage scheme and construction of 2.00 mld capacity stp cum 6 kld fstp along with o and m for 60 months after stabilization at dhilwan town distt. kapurthala under sbm 2.0
Read moreConstruction of mps along with o and m for 60 months, main sewerage scheme and construction of 2.00 mld capacity stp cum 6 kld fstp along with o and m for 60 months after stabilization at dhilwan town distt. kapurthala under sbm 2.0
Construction of mps along with o and m for 60 months, main sewerage scheme and construction of 2.00 mld capacity stp cum 6 kld fstp along with o and m for 60 months after stabilization at dhilwan town distt. kapurthala under sbm 2.0
Read moreof your Industry type