Tender Details

Particulars Details
Title
Construction Of Mps Along With O And M For 60 Months, Main Sewerage Scheme And Construction Of 2.00 Mld Capacity Stp Cum 6 Kld Fstp Along With O And M For 60 Months After Stabilization At Dhilwan Town Distt. Kapurthala Under Sbm 2.0
Description
Construction Of Mps Along With O And M For 60 Months, Main Sewerage Scheme And Construction Of 2.00 Mld Capacity Stp Cum 6 Kld Fstp Along With O And M For 60 Months After Stabilization At Dhilwan Town Distt. Kapurthala Under Sbm 2.0
Organisation Department of Local Government | State Govt. and UT
Tender Id 2024_DLG_118276_1
Reference
Number
6 of 2024
Tender Fee 3360
EMD 7.79 Lakh
Tender Value
Place Dhilwan
Link https://eproc.punjab.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=241752
Start Date February 20, 2024 15:30
End Date

12/03/2024 ( Expired 481 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Design, survey, engg, constr., supply, erection, testing and commissioning of 12 mld sewerage treatment plant cum water reclamation facility at tech zone it city, gr. noida based on sbr technology including o and m for 120 months.

Design, survey, engg, constr., supply, erection, testing and commissioning of 12 mld sewerage treatment plant cum water reclamation facility at tech zone it city, gr. noida based on sbr technology including o and m for 120 months.

Read more
Selection of agency to build-operate transfer of 12 kld faecal sludge treatment plant fstp based on planted drying bed technology along with operations and maintenance o and m for 5 years defect liability period for 2 years under rangkang gp of amar

Selection of agency to build-operate transfer of 12 kld faecal sludge treatment plant fstp based on planted drying bed technology along with operations and maintenance o and m for 5 years defect liability period for 2 years under rangkang gp of amar

Read more
Design, construction, supply, erection, testing and commissioning of tertiary treatment by disc filter system for 5.6 mld capacity stp at baga including comprehensive o and m for 3 years

Design, construction, supply, erection, testing and commissioning of tertiary treatment by disc filter system for 5.6 mld capacity stp at baga including comprehensive o and m for 3 years

Read more
Design, construction, supply, erection, testing and commissioning of tertiary treatment by sand and carbon filter system for 2 mld capacity stp at patto including comprehensive o and m for 3 years

Design, construction, supply, erection, testing and commissioning of tertiary treatment by sand and carbon filter system for 2 mld capacity stp at patto including comprehensive o and m for 3 years

Read more
Survey design supply construction erection and commissioning of 1 no sewage treatment plant stp cum etp based on mbr technology of capacity 125 kld with oandm of 5 years in tb sanatorium amritsar

Survey design supply construction erection and commissioning of 1 no sewage treatment plant stp cum etp based on mbr technology of capacity 125 kld with oandm of 5 years in tb sanatorium amritsar

Read more
Dnit operation maintena...

Amtc estimate for sewerage scheme for pataudi and haily mandi town for the year operation maintenance of 5 5 mld stp sbr technology at 5 5 mld stp haily mandi town distt gurugram for period of o and m 36 months from date of commencement a

Read more
Investigation survey on gis basis and construction of 8 mld stp with 20 kld cotreatment including mps i and d of drains and structure rising main treated effluent line with scada etc in bisalpur npp

Investigation survey on gis basis and construction of 8 mld stp with 20 kld cotreatment including mps i and d of drains and structure rising main treated effluent line with scada etc

Read more
Eng. pro. const. and comm. epc and performance followed by o and m of stp of 40 mld capacity based on sequential batch reactor sbr technology near chandlai lake for bambala area, sanganer sewerage work under ee phe i jda jaipur

Eng. pro. const. and comm. epc and performance followed by o and m of stp of 40 mld capacity based on sequential batch reactor sbr technology near chandlai lake for bambala area, sanganer sewerage work under ee phe i jda jaipur

Read more
Niq-08/eesm(c)-i/bgpd/2025-26 recall

Construction of new stp of 500 kld for existing hostels new building along with sewer line connection unfiltered water line distribution and drain beside stadium i/c operation for 6 months at iim, bodhgaya sh c/o drain beside stadium and slope reversal of existing drain from old hostel no.-4 to auditorium sitc of submersible sewerage pump etc sw balance work

Read more
Supply of two 6 cum self propelled road sweeping machine at tinsukia municipal board along with 11 months comprehensive o and m

Supply of two 6 cum self propelled road sweeping machine at tinsukia municipal board along with 11 months comprehensive o and m

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise