Tender Details

Particulars Details
Title
Construction Of Mps Along With O And M For 60 Months, Main Sewerage Scheme And Construction Of 1.00 Mld Capacity Stp Cum 3 Kld Fstp Along With O And M For 60 Months After Stabilization At Nadala Town Distt. Kapurthala Under Sbm 2.0
Description
Construction Of Mps Along With O And M For 60 Months, Main Sewerage Scheme And Construction Of 1.00 Mld Capacity Stp Cum 3 Kld Fstp Along With O And M For 60 Months After Stabilization At Nadala Town Distt. Kapurthala Under Sbm 2.0
Organisation Government of Punjab
Tender Id 2023_DLG_110954_1
Reference
Number
34 of 2023
Tender Fee 1000
EMD 7.68 Lakh
Tender Value 0
Place Jalandhar
Link https://eproc.punjab.gov.in
Start Date October 13, 2023 17:40
End Date

02/11/2023 ( Expired 564 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Survey soil investigation design construction and commissioning of sewerage network of 252.80 km trunk main of 6.03 km including 5 intermittent pumping stations 2 stp having capacity 24 mld and 12 mld respectively along with pumping station excavatio

Survey soil investigation design construction and commissioning of sewerage network of 252.80 km trunk main of 6.03 km including 5 intermittent pumping stations 2 stp having capacity 24 mld and 12 mld respectively along with pumping station excavatio

Read more
Design drawing engineering procurement construction of 10 mld stp including mps of 10 mld at anand vihar avasiya yojana hapur and 1 ips of 5 mld capacity at preet vihar yojana including rising main of di k9 pipe with confirmative survey etc

Design drawing engineering procurement construction of 10 mld stp including mps of 10 mld at anand vihar avasiya yojana hapur and 1 ips of 5 mld capacity at preet vihar yojana including rising main of di k9 pipe with confirmative survey etc

Read more
Investigation, survey (on g.i.s. vasis) and construction of 10 mld stp with 30 kld c0-treatment, i and d of drains and structure, rising main, treated effluent line with scada etc. in auraiya nagar palika parishad, district auraiya under s.b.m. 2.0

Investigation, survey (on g.i.s. vasis) and construction of 10 mld stp with 30 kld c0-treatment, i and d of drains and structure, rising main, treated effluent line with scada etc. in auraiya nagar palika parishad, district auraiya under s.b.m. 2.0

Read more
Upgradation of existing 100 mld sewerage treatment plant and construction of 75 mld tertiary treatment unit at dhanwapur sewage treatment works with operation and maintenance for 5 years after 12 months defect liability period for reuse of treated

Upgradation of existing 100 mld sewerage treatment plant and construction of 75 mld tertiary treatment unit at dhanwapur sewage treatment works with operation and maintenance for 5 years after 12 months defect liability period for reuse of treated ef

Read more
O and m of stp of 7.50 mld capacity (mbbr technology) at rampura phul for 12 months period 01.04.2025 to 31.03.2025

O and m of stp of 7.50 mld capacity (mbbr technology) at rampura phul for 12 months period 01.04.2025 to 31.03.2025

Read more
Interception and di of drains and stp with co treatment and associated works in nagar palika parishad sikandrabad district bulandshahr under sbm u 2 programme

Construction of 8 mld stp with 11 kld co treatment and associated works, rising main, i d works of 3 drains, ips, sewer line etc

Read more
Interception and di of drains and stp with co treatment and associated works in nagar palika parishad jahangirabad district bulandshahr under sbm u 2 programme

I d of 4 drains, construction of 6 mld stp and 9 kld co treatment and associated works, sewer line, rising main etc.

Read more
Operation and maintenance of stp 3 mld capacity on sbr technology at moonak town distt. sangrur for the year 2025-26. period 01.04.2025 to 31.03.2026 i.e. 12 months

Operation and maintenance of stp 3 mld capacity on sbr technology at moonak town distt. sangrur for the year 2025-26. period 01.04.2025 to 31.03.2026 i.e. 12 months

Read more
Namakkal dt - kalappanaickenpatty tp - 2024-25 sbm 2.0 fstp work

Construction of 3 mld sewage treatment plant (stp) cum 10 kld faecal sludge treatment plant (fstp) in kallappanaiyakkan patti (host) town panchayat

Read more
Investigation survey on gis basis and construction of 8 mld stp with 20 kld cotreatment including mps i and d of drains and structure rising main treated effluent line with scada etc

Investigation survey on gis basis and construction of 8 mld stp with 20 kld cotreatment including mps i and d of drains and structure rising main treated effluent line with scada etc

Read more
Click Here to Download Dockets
of your Industry type