Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Mps Along With O And M For 60 Months, Main Sewerage Scheme And Construction Of 1.00 Mld Capacity Stp Cum 3 Kld Fstp Along With O And M For 60 Months After Stabilization At Nadala Town Distt. Kapurthala Under Sbm 2.0
|
Description |
Construction Of Mps Along With O And M For 60 Months, Main Sewerage Scheme And Construction Of 1.00 Mld Capacity Stp Cum 3 Kld Fstp Along With O And M For 60 Months After Stabilization At Nadala Town Distt. Kapurthala Under Sbm 2.0
|
Organisation | Government of Punjab |
Tender Id | 2023_DLG_114046_1 |
Reference Number |
44 of 2023 |
Tender Fee | 1000 |
EMD | 7.68 Lakh |
Tender Value | |
Place | Jalandhar |
Link | https://eproc.punjab.gov.in |
Start Date | December 15, 2023 22:30 |
End Date |
08/01/2024 ( Expired 510 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Central govt. sanction amrut 2.0 mission, construction, enhancement and rehabilitation of new naidu,bahiroba, tanajiwadi, erandwane, vittalwadi, bopodi stp of pmc, as per latest cpcb norms, through hybrid annuity based ppp mode with o and m 15 years
Central govt. sanction amrut 2.0 mission, construction, enhancement and rehabilitation of new naidu,bahiroba, tanajiwadi, erandwane, vittalwadi, bopodi stp of pmc, as per latest cpcb norms, through hybrid annuity based ppp mode with o and m 15 years
Read moreSbm (u) 2.0 - 2024-2025 - sarakarsamakulam town panchayat-stp-retender
Construction of 1mld stp cum 10 kld fstp in sarkarsamakulam town panchayat, coimbatore district
Read moreSurvey soil investigation design construction and commissioning of sewerage network of 252.80 km trunk main of 6.03 km including 5 intermittent pumping stations 2 stp having capacity 24 mld and 12 mld respectively along with pumping station excavatio
Survey soil investigation design construction and commissioning of sewerage network of 252.80 km trunk main of 6.03 km including 5 intermittent pumping stations 2 stp having capacity 24 mld and 12 mld respectively along with pumping station excavatio
Read moreSbm (u) 2.0 2024-2025 construction of 1 mld stp cum 10 kld fstp at palayajayagonda cholapuram town panchayat, karur district.
Sbm (u) 2.0 2024-2025 construction of 1 mld stp cum 10 kld fstp at palayajayagonda cholapuram town panchayat, karur district.
Read moreDesign drawing engineering procurement construction of 10 mld stp including mps of 10 mld at anand vihar avasiya yojana hapur and 1 ips of 5 mld capacity at preet vihar yojana including rising main of di k9 pipe with confirmative survey etc
Design drawing engineering procurement construction of 10 mld stp including mps of 10 mld at anand vihar avasiya yojana hapur and 1 ips of 5 mld capacity at preet vihar yojana including rising main of di k9 pipe with confirmative survey etc
Read moreInvestigation, survey (on g.i.s. vasis) and construction of 10 mld stp with 30 kld c0-treatment, i and d of drains and structure, rising main, treated effluent line with scada etc. in auraiya nagar palika parishad, district auraiya under s.b.m. 2.0
Investigation, survey (on g.i.s. vasis) and construction of 10 mld stp with 30 kld c0-treatment, i and d of drains and structure, rising main, treated effluent line with scada etc. in auraiya nagar palika parishad, district auraiya under s.b.m. 2.0
Read moreUpgradation of existing 100 mld sewerage treatment plant and construction of 75 mld tertiary treatment unit at dhanwapur sewage treatment works with operation and maintenance for 5 years after 12 months defect liability period for reuse of treated
Upgradation of existing 100 mld sewerage treatment plant and construction of 75 mld tertiary treatment unit at dhanwapur sewage treatment works with operation and maintenance for 5 years after 12 months defect liability period for reuse of treated ef
Read moreO and m of stp of 7.50 mld capacity (mbbr technology) at rampura phul for 12 months period 01.04.2025 to 31.03.2025
O and m of stp of 7.50 mld capacity (mbbr technology) at rampura phul for 12 months period 01.04.2025 to 31.03.2025
Read moreInterception and di of drains and stp with co treatment and associated works in nagar palika parishad sikandrabad district bulandshahr under sbm u 2 programme
Construction of 8 mld stp with 11 kld co treatment and associated works, rising main, i d works of 3 drains, ips, sewer line etc
Read moreInterception and di of drains and stp with co treatment and associated works in nagar palika parishad jahangirabad district bulandshahr under sbm u 2 programme
I d of 4 drains, construction of 6 mld stp and 9 kld co treatment and associated works, sewer line, rising main etc.
Read moreof your Industry type