Tender Details
Particulars | Details |
---|---|
Title |
Work Of Conducting Periodic And Annual Energy Acing Of Goa Electricity Department For Fy 2025 26
|
Description |
Work Of Conducting Periodic And Annual Energy Acing Of Goa Electricity Department For Fy 2025 26
|
Organisation | ELECTRICITY DEPARTMENT | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 5400 |
EMD | 49000 |
Tender Value | |
Place | All the offices Substations SLDC etc of Goa Elect |
Link |
AAAAAAAAAA Login to view |
Start Date | June 05, 2025 19:30 |
End Date |
12/06/2025 ( 3 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
AAAAAAAAAA
Login to viewNotice inviting expression of interest eoi for registration of radiologist and firms for empanelment in tele radiology reporting panel
Read moreAppointment of issuing bank for a letter of credit
Invitation to act as issuing bank for an aggregate/portfolio letter of credit (lc) to cover three sub-projects, such lc backstopped by a guarantee from the international bank for reconstruction and development (ibrd) to support the sngrbp
Read moreAAAAAAAAAA
Login to viewBalance work of rehabilitation and up-gradation of section from km 206.00 to km 239.445 (nimbutala to austin creek) of nh-04 in a n islands on epc basis (pkg-iv) at the risk and cost of existing epc contractor, on percentage rate basis in fy 25-2
Read moreInvitation of bids to develop vasco city to goa international airport (dabolim) petroleum and petroleum products (atf) pipeline
Grant of authorization for laying, building, operating or expanding petroleum and petroleum product (atf) pipeline from vasco city to goa international airport (dabolim)
Read moreSupply, installation, commissioning and maintenance of fibre-reinforced polymer (frp) made 20 seater luxury boat (ac) powered with yamaha/suzuki/tohatsu/honda obm, at dumboor lake, tripura along with amc contract during the year 2025-26
Supply, installation, commissioning and maintenance of fibre-reinforced polymer (frp) made 20 seater luxury boat (ac) powered with yamaha/suzuki/tohatsu/honda obm, at dumboor lake, tripura along with amc contract during the year 2025-26
Read moreSupply, installation, commissioning and maintenance of frp made 10 seater yatch alongwith flybridge powerd with yamaha or suzuki or tohatsu or honda obm at dumboor lake, tripura alongwith amc during the year 2025-26
Supply, installation, commissioning and maintenance of frp made 10 seater yatch alongwith flybridge powerd with yamaha or suzuki or tohatsu or honda obm at dumboor lake, tripura alongwith amc during the year 2025-26
Read moreSupply, installation, commissioning and maintenance of parasail boat at dumbbor lake, tripura along with amc of 4 years during the year 2025-26.
Supply, installation, commissioning and maintenance of parasail boat at dumbbor lake, tripura along with amc of 4 years during the year 2025-26.
Read moreConsultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreof your Industry type