Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Consultancy Services As Independent Engineer Services During Operation And Maintenance Stage Of Four Laning Of Bellary Byrapura Section Of Nh150 A From Km.266.820 To Km.277.690 And Km.278.690 To Km.308.550 On Ham Mode Under Bharatmala Pariyojna In The
|
Description |
Consultancy Services As Independent Engineer Services During Operation And Maintenance Stage Of Four Laning Of Bellary Byrapura Section Of Nh150 A From Km.266.820 To Km.277.690 And Km.278.690 To Km.308.550 On Ham Mode Under Bharatmala Pariyojna In The
|
Organisation | Central Public Procurement Portal 2 |
Tender Id | 2023_NHAI_175125_1 |
Reference Number |
NIT No.18/NHAI/RO-BNG/17017/Tender |
Tender Fee | 5000 |
EMD | 0 |
Tender Value | |
Place | NHAI-RO-Bengaluru |
Link | https://etenders.gov.in |
Start Date | November 20, 2023 22:30 |
End Date |
19/12/2023 ( Expired 564 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repairs to existing road under risk and cost to four lane of karad tasgaon (from km 0/000 to km 58/830) section of nh 266 on epc mode in the state of maharashtra. (regarding panel replacement)
Repairs to existing road under risk and cost to four lane of karad tasgaon (from km 0/000 to km 58/830) section of nh 266 on epc mode in the state of maharashtra. (regarding panel replacement)
Read moreConstruction of 4 lane access controlled highway from vakalpudi light house to annavaram (on nh16) section of nh516f from km. 0.000 to km. 40.621 on ham under bharatmala pariyojana phase i in the state of andhra pradesh
Construction of 4 lane access controlled highway from vakalpudi light house to annavaram (on nh16) section of nh516f from km. 0.000 to km. 40.621 on ham under bharatmala pariyojana phase i in the state of andhra pradesh
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreConsultancy services for rectification measures on mahadevpur to bhupalapally section 2lps of nh 353c from km 25.0 to 59.2 design ch. km.25.467 to 59.200 and dpr for parkal bypass, bhupalapally bypass on sironcha atmakur section of nh 353c
Consultancy services for rectification measures on mahadevpur to bhupalapally section 2lps of nh 353c from km 25.0 to 59.2 design ch. km.25.467 to 59.200 and dpr for parkal bypass, bhupalapally bypass on sironcha atmakur section of nh 353c
Read moreConsultancy services for preparation of dpr for 4 l of rudrampur to bhadrachalam section from km 71.0 to 171.6 of vijayawada to jagadalpur section of nh 30 and construction of kothagudem bypass connecting nh 930p and nh 30 in the state of telangana
Consultancy services for preparation of dpr for 4 l of rudrampur to bhadrachalam section from km 71.0 to 171.6 of vijayawada to jagadalpur section of nh 30 and construction of kothagudem bypass connecting nh 930p and nh 30 in the state of telangana
Read moreIndependent engineer services for upgradation of existing road to 2l with ps for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh 539) in the state of madhya pradesh on hybrid annuity mode
Independent engineer services for upgradation of existing road to 2l with ps for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh 539) in the state of madhya pradesh on hybrid annuity mode.
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation of existing intermediate lane flexible pavement to 2l with ps from km 0.00 to km 75.00 on orchha tikamgarh shahgarh nh 539 in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation of existing intermediate lane flexible pavement to 2l with ps from km 0.00 to km 75.00 on orchha tikamgarh shahgarh nh 539 in the state of madhya pradesh on epc mode.
Read moreRehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.
Rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.
Read moreConsultancy services for ae for supervision of construction of missing link from birhu to lathiani into 4 lane from km 35.550 to km 42.800 on nh-503a including cable stayed bridge (0.860 km) in himachal pradesh on epc mode.
Consultancy services for ae for supervision of construction of missing link from birhu to lathiani into 4 lane from km 35.550 to km 42.800 on nh-503a including cable stayed bridge (0.860 km) in himachal pradesh on epc mode.
Read moreof your Industry type