Tender Details

Particulars Details
Title
Ie Service For Construction Of 4 Lane Of Dewas Ujjain Section Of Nh752 D From Design Km 0.000 To 19.733 Including Ujjain Bypass From Design Km 19.733 To 26.900 (Part I) And Dewas Bypass From Design Km 0.000 To 14.520 (Part Ii) Total Length Of 41.42 Km
Description
Ie Service For Construction Of 4 Lane Of Dewas Ujjain Section Of Nh752 D From Design Km 0.000 To 19.733 Including Ujjain Bypass From Design Km 19.733 To 26.900 (Part I) And Dewas Bypass From Design Km 0.000 To 14.520 (Part Ii) Total Length Of 41.42 Km
Organisation National Highways Authority of India | Public Sector Undertakings
Tender Id 2025_NHAI_236852_1
Reference
Number
NHAI/ROMP/IE/DU/752D/2025
Tender Fee 5000
EMD 0
Tender Value -
Place NHAI RO BHOPAL
Link
View Original Tender Notice

https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=268871

Start Date May 29, 2025 19:50
End Date
Expired 14/07/2025

Expired 403 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of 4-lane elevated road near aiims darbhanga on shoban-ekmi bypass (length-2.320 km) & construction of elevated road from lohjiya chowk to pandasarai rob with ramp towards pandasarai from lohiya chowk (length-2.142 km) in darbhanga district in the state of bihar on epc mode

Construction of 4-lane elevated road near aiims darbhanga on shoban-ekmi bypass (length-2.320 km) & construction of elevated road from lohjiya chowk to pandasarai rob with ramp towards pandasarai from lohiya chowk (length-2.142 km) in darbhanga district in the state of bihar on epc mode

Read more
Carrying out borehole drilling (boreholes) from km 29 to km 58 (total length 29 km) for conducting surveys and investigations for preparing the design estimates and detailed project report (dpr) for the project to supply krishna river water to drough

Carrying out borehole drilling (boreholes) from km 29 to km 58 (total length 29 km) for conducting surveys and investigations for preparing the design estimates and detailed project report (dpr) for the project to supply krishna river water to drough

Read more
Engagement of user fee collection agency through regular basis (e-tender) for kovilvenni fee plaza at km 59.000 of nagapattinam to thanjavur section from km 1.600 to km 16.690 and fromkm 29.850 to km 80.133 of nh-83 in the state of tamil nadu

Engagement of user fee collection agency through regular basis (e-tender) for kovilvenni fee plaza at km 59.000 of nagapattinam to thanjavur section from km 1.600 to km 16.690 and fromkm 29.850 to km 80.133 of nh-83 in the state of tamil nadu

Read more
Ie services for construction of 4 lane bypass to nh114a connecting nh-333 and nh-133(deoghar bypass) from design km 0.000 to design km 49.000 total length 49.000 km in jharkhand on ham

Ie services for construction of 4 lane bypass to nh114a connecting nh-333 and nh-133(deoghar bypass) from design km 0.000 to design km 49.000 total length 49.000 km in jharkhand on ham

Read more
Construction of 4 lane bypass to nh114a connecting nh333 and nh133(deoghar bypass) frm design km 0.000 to design km 49.000(total length 49.000 km)in the state of jharkhand on ham

Construction of 4 lane bypass to nh114a connecting nh333 and nh133(deoghar bypass) frm design km 0.000 to design km 49.000(total length 49.000 km)in the state of jharkhand on ham

Read more
Construction of 2-lane with paved shoulder configuration of biaora bypass of length 5.690 km, from km 0.000 to 5.690, total design length 5.690 km section of nh-752b in the state of madhya pradesh under epc mode

Construction of 2-lane with paved shoulder configuration of biaora bypass of length 5.690 km, from km 0.000 to 5.690, total design length 5.690 km section of nh-752b in the state of madhya pradesh under epc mode

Read more
Maintenance of bhopal bypass road length 26 km (2 lane) in total length of 52 km (4 lane)

Maintenance of bhopal bypass road length 26 km (2 lane) in total length of 52 km (4 lane)

Read more
Ie services for construction work of 4-laning of sandalpur to nasrullaganj bypass end pkgi of nh146b from design km 0.000 to design km 43.250 (design length 43.250 km) in madhya pradesh on hybrid annuity mode under nh (o) scheme.

Ie services for construction work of 4-laning of sandalpur to nasrullaganj bypass end pkgi of nh146b from design km 0.000 to design km 43.250 (design length 43.250 km) in madhya pradesh on hybrid annuity mode under nh (o) scheme.

Read more
Rehabilitation and upgradation of 4 lane road with paved shoulders of barshi takli bypass (nh 161 a) from design km. 0.000 to km.3.160 (total length 3.160 km) in the state of maharashtra on epc basis mode

Rehabilitation and upgradation of 4 lane road with paved shoulders of barshi takli bypass (nh 161 a) from design km. 0.000 to km.3.160 (total length 3.160 km) in the state of maharashtra on epc basis mode

Read more
Ies for supervision of i-construction of 4-6 lane northern ayodhya bypass total length of 35.40 kms of part-1 north of nh27 and part2 south of nh27 ii-construction of 4-6 lane southern ayodhya bypass from km 5.000 to km 37.172 of total length of 32.1

Ies for supervision of i-construction of 4-6 lane northern ayodhya bypass total length of 35.40 kms of part-1 north of nh27 and part2 south of nh27 ii-construction of 4-6 lane southern ayodhya bypass from km 5.000 to km 37.172 of total length of 32.1

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise