Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
6 Laning With Service Road On Both Sides Of Ayodhya Bypass Section Of Nh 46 From Design Km 0.000 Near Ashram Tiraha To Design Km 16.500 At Ratnagiri Tiraha (Design Length 16.500 Km) Under Nh (O) In Madhya Pradesh On Ham
|
| Description |
6 Laning With Service Road On Both Sides Of Ayodhya Bypass Section Of Nh 46 From Design Km 0.000 Near Ashram Tiraha To Design Km 16.500 At Ratnagiri Tiraha (Design Length 16.500 Km) Under Nh (O) In Madhya Pradesh On Ham
|
| Organisation | National Highways Authority of India | Public Sector Undertakings |
| Tender Id | 2023_NHAI_169732_1 |
|
Reference Number |
|
| Tender Fee | 1.1 Lakh |
| EMD | 10.98 Crore |
| Tender Value | |
| Place | NHAI HQ |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=185949 |
| Start Date | October 05, 2023 22:30 |
| End Date |
Expired
27/02/2024
Expired 854 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreRectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Read more6 laning with service road on both sides of ayodhya bypass section of nh 46 from design km 0.000 near ashram tiraha to design km 16.500 at ratnagiri tiraha (design length 16.500 km) under nh (o) in madhya pradesh on hybrid annuity mode
6 laning with service road on both sides of ayodhya bypass section of nh 46 from design km 0.000 near ashram tiraha to design km 16.500 at ratnagiri tiraha (design length 16.500 km) under nh (o) in madhya pradesh on hybrid annuity mode
Read moreIndependent engineer services for six laning with both sides service road of ayodhya nagar bypass of bhopal city section of nh-46 from design km 0.000 near ashram tiraha to km 16.439 at ratnagiri tiraha (length 16.439 km) under nh(o) in madhya prades
Independent engineer services for six laning with both sides service road of ayodhya nagar bypass of bhopal city section of nh-46 from design km 0.000 near ashram tiraha to km 16.439 at ratnagiri tiraha (length 16.439 km) under nh(o) in madhya prades
Read moreConstruction work of 4-laning of sandalpur to nasrullaganj bypass end pkgi of nh-146b from design km 0.000 to design km 43.250 (dl 43.250 km) under nh(o) in madhya pradesh on hybrid annuity mode
Construction work of 4-laning of sandalpur to nasrullaganj bypass end pkgi of nh-146b from design km 0.000 to design km 43.250 (dl 43.250 km) under nh(o) in madhya pradesh on hybrid annuity mode
Read moreIe services for construction work of 4-laning of sandalpur to nasrullaganj bypass end pkgi of nh146b from design km 0.000 to design km 43.250 (design length 43.250 km) in madhya pradesh on hybrid annuity mode under nh (o) scheme.
Ie services for construction work of 4-laning of sandalpur to nasrullaganj bypass end pkgi of nh146b from design km 0.000 to design km 43.250 (design length 43.250 km) in madhya pradesh on hybrid annuity mode under nh (o) scheme.
Read moreFour laning of gyaraspur- rahatgarh section of nh-146 from design chainage km. 88.361 to design chainage at km. 124.470 in the state of madhya pradesh on ham mode.
Four laning of gyaraspur- rahatgarh section of nh-146 from design chainage km. 88.361 to design chainage at km. 124.470 in the state of madhya pradesh on ham mode.
Read moreConstruction work of 4-laning of shahganj bypass end to badi (package-iv) of nh-146b from design km 102.000 to design km 142.357 (design length 40.357 km) under nh (o) in the state of madhya pradesh on hybrid annuity mode
Construction work of 4-laning of shahganj bypass end to badi (package-iv) of nh-146b from design km 102.000 to design km 142.357 (design length 40.357 km) under nh (o) in the state of madhya pradesh on hybrid annuity mode
Read moreFour laning of nh-146 from design chainage km 59.475 (existing chainage km 81.240 near vidisha) to design chainage km 88.600 (existing chainage km 110.315 near gyaraspur) in madhya pradesh on ham under bmp
Four laning of nh-146 from design chainage km 59.475 (existing chainage km 81.240 near vidisha) to design chainage km 88.600 (existing chainage km 110.315 near gyaraspur) in madhya pradesh on ham under bmp
Read moreof your Industry type