Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Budget Work 2020 21 Providing Bc Overlay To Oravakkal Koorali Road From Ch8 500 To 13 533 Except From Ch9 140 To Ch 9 950 Deposit Work 2023 24 Restoration Of Trenching Done By Kwa At Oravackal Koorali Road Ch 8 000 To 9 140 Km 9 950 To 13 550 Km
|
| Description |
Budget Work 2020 21 Providing Bc Overlay To Oravakkal Koorali Road From Ch8 500 To 13 533 Except From Ch9 140 To Ch 9 950 Deposit Work 2023 24 Restoration Of Trenching Done By Kwa At Oravackal Koorali Road Ch 8 000 To 9 140 Km 9 950 To 13 550 Km
|
| Organisation | Government of Kerala |
| Tender Id | 2023_PWD_592256_1 |
|
Reference Number |
PWD/RB/TR/21143/2022_5_1_1/1 |
| Tender Fee | 9759 |
| EMD | 1 Lakh |
| Tender Value | - |
| Place | O/o Superintending Engineer, PWD Roads South Circl |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in |
| Start Date | August 03, 2023 17:00 |
| End Date |
Expired
16/08/2023
Expired 1156 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Consultancy service for upgradation work of single lane class b loading bridge to double lane class a loading bridge at km 9 (ch 8.025 km) ,10 (ch 9.975 km) and 13 (ch 12.775) of uttarkashi-ghansali tilwara state highway (sh-15)at bhatwari uttarkashi
Consultancy service for upgradation work of single lane class b loading bridge to double lane class a loading bridge at km 9 (ch 8.025 km) ,10 (ch 9.975 km) and 13 (ch 12.775) of uttarkashi-ghansali tilwara state highway (sh-15)at bhatwari uttarkashi
Read moreSr. no. 1 procurement of raw material manufacturing inspection assembly testing packing and supply of relief valve make forbes marshall set pressure 140 plus by minus 1.4 kgf cm2,sr. no. 2 procurement of raw material manufacturing inspection assembly testing packing and supply of relief valve make forbes marshall set pressure 135 plus by minus 1.35 kgf cm2,sr. no. 3 procurement of raw material manufacturing inspection testing packing and supply of spare spindle stem no. 13 of drawing no. a3 ghavp 1and 2 35000 2026 vss .,sr. no. 4 procurement of raw material manufacturing inspection testing packing and supply of spare disc s. no. 4 of drawing no. a3 ghavp 1and 2 35000 2026 vss .,sr. no. 5 insection packing and supply of spare o ring and gaskets s. no. 21 15 and 9 of drawing no. a3 ghavp 1and 2 35000 2026 vss .,sr. no. 6 insection packing and supply of spare grub screw sr.no. 5 of drawing no. a3 ghavp 1and 2 35000 2026 vss for relief valve make forbes marshall,sr. no. 7 insection packing and supply of spare bal
Sr. no. 1 procurement of raw material manufacturing inspection assembly testing packing and supply of relief valve make forbes marshall set pressure 140 plus by minus 1.4 kgf cm2,sr. no. 2 procurement of raw material manufacturing inspection assembly testing packing and supply of relief valve make forbes marshall set pressure 135 plus by minus 1.35 kgf cm2,sr. no. 3 procurement of raw material manufacturing inspection testing packing and supply of spare spindle stem no. 13 of drawing no. a3 ghavp 1and 2 35000 2026 vss .,sr. no. 4 procurement of raw material manufacturing inspection testing packing and supply of spare disc s. no. 4 of drawing no. a3 ghavp 1and 2 35000 2026 vss .,sr. no. 5 insection packing and supply of spare o ring and gaskets s. no. 21 15 and 9 of drawing no. a3 ghavp 1and 2 35000 2026 vss .,sr. no. 6 insection packing and supply of spare grub screw sr.no. 5 of drawing no. a3 ghavp 1and 2 35000 2026 vss for relief valve make forbes marshall,sr. no. 7 insection packing and supply of spare bal
Read moreRetender deposit work 2022-23 oravackal koorali road ch 0/180 to 3/250 km part ts for urgent reconstruction of culvert at ch 1/117 km
Retender deposit work 2022-23 restoration of trenching done by kwa at oravackal koorali road ch 0/180 to 3/250 km part ts for urgent reconstruction of culvert and allied works at ch 1/117 km damaged due to kwa jjm work
Read moreBudget work 2020 2021 providing bc overlay to oravakkal koorali road ch 0 000 to 5 000 km part ts for bc overlay from ch 3 250 to 5 000
Budget work 2020 2021 providing bc overlay to oravakkal koorali road ch 0 000 to 5 000 km part ts for bc overlay from ch 3 250 to 5 000
Read moreGeneral-sr 2024-25 reconstruction of damaged and choked culvert and adjoining drain in oravakkal koorali road at ch 6/700 km -drainage-general civil work
General-sr 2024-25 reconstruction of&#x0d damaged and choked culvert and adjoining&#x0d drain in oravakkal koorali road at ch 6/700&#x0d km -drainage-general civil work
Read moreKiifb-urgent rectification works -kodakara vellikulangara road from ch. 7/600 to 13/140 overlapping with hill highway 12/440 to 13/140-general civil work
Rectification works,close gradedbitumen chipping carpet
Read moreMangalam project ap 2023 mgm improvement of rbmc ch 9 850 to 9 950 km left side wall and half portion bed
Earth work, centering and shuttering, cement concrete, centering and shuttering, plastering and filling etc
Read moreRe-construction of ganjmuradabad-sarayn sultan-darukuinyan- nayagaon road odr ch 9-540 to 11-140
Re-construction of ganjmuradabad-sarayn sultan-darukuinyan- nayagaon road odr ch 9-540 to 11-140
Read moreGeneral-mp-annual maintenance 2024-25- rbc main canal from ch 0/400 km to 9/950 km-general civil work
The cleaning of canals and desilting is&#x0d inevitable to enable smooth water distribution&#x0d andconveyance of water through the rbc main&#x0d canals to the paddy fields during this year2024-&#x0d 25 and this work needs to be d prior to&#x0d water distribution
Read moreGeneral-mp-water distribution 2024-25- rbmc between ch 0/400 km - 9/950 km and its subcanals-general civil work
This work has been included under the action&#x0d plan 2024-25 of the malampuzha project to&#x0d enable smooth water distribution during this&#x0d year2024-25 . the removal of all obstruction&#x0d and providing arrangements for ensuring&#x0d smooth water distribution
Read moreof your Industry type