Tender Details
Particulars | Details |
---|---|
Title |
General-mp-annual maintenance 2024-25- rbc main canal from ch 0/400 km to 9/950 km-general civil work
|
Description |
The cleaning of canals and desilting is&#x0d
inevitable to enable smooth water distribution&#x0d
andconveyance of water through the rbc main&#x0d
canals to the paddy fields during this year2024-&#x0d
25 and this work needs to be d prior to&#x0d
water distribution
|
Organisation | Irrigation Department | State Govt. and UT |
Tender Id | 2024_Irrig_688176_1 |
Reference Number |
IRR/PI/TR/3380/2024_5_1_1/1 |
Tender Fee | 1495 |
EMD | 16945 |
Tender Value | |
Place | Malampuzha |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1070930 |
End Date |
05/09/2024 ( Expired 9 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Et/05/se/gta circle /phe dte of 2024-25 (sl. no. 01)
Construction of intake, wtp of capacity 5 mld including desiltation tank, laying of pumping main, river protection work including all electro mechinical components from balason river (near jartory gaon) to glr 2 and other allied works under kurseong
Read moreConstruction of road from km 0.000 to km 17.812 of bile to migging stretch (ch.0.0 at migging) of nh-913(frontier highway) to intermediate lane on epc mode in the state of arunachal pradesh
Construction of road from km 0.000 to km 17.812 of bile to migging stretch (ch.0.0 at migging) of nh-913(frontier highway) to intermediate lane on epc mode in the state of arunachal pradesh
Read moreShort term maintenance under or (dpp) works from km 0.00 to km 15.500 of nh-31c (new nh- 327) under nh division-ix in the district of darjeeling, west bengal during the year 2024-25.
Short term maintenance under or (dpp) works from km 0.00 to km 15.500 of nh-31c (new nh- 327) under nh division-ix in the district of darjeeling, west bengal during the year 2024-25.
Read moreShort term restoration work damaged due to subsidence of road bench at ch. 39.78 km to 39.98 km of nh-10 damaged due to heavy rain and erosion of river teesta on 08.08.2024 under n.h. division no.ix in the district of kalimpong during the year 24-25.
Short term restoration work damaged due to subsidence of road bench at ch. 39.78 km to 39.98 km of nh-10 damaged due to heavy rain and erosion of river teesta on 08.08.2024 under n.h. division no.ix in the district of kalimpong during the year 24-25.
Read moreAnnual maintenance including incident management of four laning of tuticorin to tirunelveli section from km 6/160 to km 47/250 of nh-7a (new nh-138) in the state of tamil nadu on item rate basis
Annual maintenance including incident management of four laning of tuticorin to tirunelveli section from km 6/160 to km 47/250 of nh-7a (new nh-138) in the state of tamil nadu on item rate basis
Read moreRoutine maintenance and periodic renewal work of 2 lane with paved shoulder 4-lane of barmer-bagundi km 0.00 to km 74.100 of nh-25 in the state of rajasthan on performance based maintenance contracts (pbmc) mode
Routine maintenance and periodic renewal work of 2 lane with paved shoulder 4-lane of barmer-bagundi km 0.00 to km 74.100 of nh-25 in the state of rajasthan on performance based maintenance contracts (pbmc) mode
Read moreRepair and maintenance of nh 4b from km 21 200 to km 27 270 d to e section and from km 0 000 to km 4 492 d to g section of jnpt pkg iv on epc mode
Repair and maintenance of nh 4b from km 21 200 to km 27 270 d to e section and from km 0 000 to km 4 492 d to g section of jnpt pkg iv on epc mode
Read moreRepair work canal and lining between 0 to 45 km of mbc.
Repair work canal and lining between 0 to 45 km of mbc.
Read moreMaintenance of road from chandrapur to amtali via battala l 10.70 km during the year 2024 25 sh bituminous concrete overlaying and road furniture portion from drop gate ch. 6.90 km to badarghat ch. 8.00 km l 1.10 km
Maintenance of road from chandrapur to amtali via battala l 10.70 km during the year 2024 25 sh bituminous concrete overlaying and road furniture portion from drop gate ch. 6.90 km to badarghat ch. 8.00 km l 1.10 km
Read moreMaintenance of road from chandrapur to amtali via battal l 10.70 km during the year 2024 25 sh bituminous concrete overlaying and road furniture portion from badarghat ch. 8.00 km to ongc bank chowmuhani ch. 9.40 km l 1.40 km
Maintenance of road from chandrapur to amtali via battal l 10.70 km during the year 2024 25 sh bituminous concrete overlaying and road furniture portion from badarghat ch. 8.00 km to ongc bank chowmuhani ch. 9.40 km l 1.40 km
Read moreNo attachments found
of your Industry type