Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
47/Nit/Ce/Cpwd/Bbsr/2025 26
|
| Description |
Upgradation Of Ekalavya Model Residential Schools (Emrs) At Bahalda, Dist Mayurbhanj, Odisha. Sh: Construction Of 03 Nos. Science Laboratories, Multipurpose Hall, Recreation Of Library By Dismantling The Existing Partition Wall Of Physics, Chemistry Math Lab Located At First Floor Level, Recreation Of Class Room By Dismantling The Existing Partition Wall Of Botany Zoology Lab Located At Ground Floor Level, Recreation Of Computer Lab. By Dismantling The Existing Partition Of Computer Activity Room Located At Second Floor Level And Providing Street Light And Dg Sets. (Balance Work)
|
| Organisation | Central Public Works Department (CPWD) | Central Govt. Ministry/Department |
| Tender Id | 147557 |
|
Reference Number |
47/NIT/CE/CPWD/BBSR/2025-26 |
| Tender Fee | 0 |
| EMD | 5.68 Lakh |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://etender.cpwd.gov.in/cppcpwdtenderview.html?tid=637077642463707764243134373535372434372f4e49542f43452f435057442f424253522f323032352d3236 |
| Start Date | March 19, 2026 01:15 |
| End Date |
Expired
26/03/2026
Expired 204 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Partition of temporary shed, shifting quality lab equipments and demolition of existing quality lab at mayor ramanathan saalai in division - 108, unit - 23, zone - viii.
Partition of temporary shed, shifting quality lab equipments and demolition of existing quality lab at mayor ramanathan saalai in division - 108, unit - 23, zone - viii.
Read moreRectification of existing pa fan motor concrete bed of unit 1 1b and dismantling partition wall in between mill floor and bottom ash hopper of unit 1
Rectification of existing pa fan motor concrete bed of unit 1 1b and dismantling partition wall in between mill floor and bottom ash hopper of unit 1
Read moreBotany lab equipments,zoology lab equipments,chemistry lab equipments,physics lab equipments,botany
Read more
Physics lab items,chemistry lab items,botany lab items,zoology lab items,botany lab instruments,phy
Read more
Physics lab equipments,chemistry lab equipments,botany lab equipments,zoology lab equipments,instal
Read more
Renovation of zoology, microbiology, botany lab and staff room
Renovation of zoology, microbiology, botany lab and staff room
Read moreComputer table,lab work benches for chemistry department,lab work benches botany and zoology,lab wo
Read more
Electrical work to be carried out in lab no. 304, corridor, museum at zoology department, lab no. 45a, (botany department) etc. at university of delhi
Electrical work to be carried out in lab no. 304, corridor, museum at zoology department, lab no. 45a, (botany department) etc. at university of delhi
Read moreCons and repair work rcc slab of zoology and botany dept. lab at shahid bhima nayak govt. college barwani distt barwani.
Cons and repair work rcc slab of zoology and botany dept. lab at shahid bhima nayak govt. college barwani distt barwani.
Read moreof your Industry type